NRC Security Inspection Report 05000498/2018403; 05000499/2018403
ML18197A371
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/16/2018
From: Jeremy Groom
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2018403
Download: ML18197A371 (7)


See also: IR 05000498/2018403

Text

July 16, 2018

Mr. G. T. Powell

Executive Vice President and CNO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1

AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403;

05000499/2018403

Dear Mr. Powell:

On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security

inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility.

The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant

Protection and Emergency Planning, and other members of your staff. The results of this

inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice

and Procedure," a copy of this letter will be available electronically for public inspection in the

NRCs Public Document Room or from the Publicly Available Records (PARS) component of the

NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

If you choose to provide a response to this report that contains Security-Related Information,

please mark your entire response Security-Related Information - Withhold from Public

Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR

2.390(b)(1).

G. Powell

2

The NRC is waiving the affidavit requirements for your response in accordance with

10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Jeremy R. Groom, Chief

Plant Support Branch 1

Division Reactor Safety

Docket Nos. 50-498, 50-499

License Nos. NPF-76 and NPF-80

Enclosures:

Inspection Report 05000498/2018403,

05000499/2018403

Enclosure

U.S. NUCLEAR REGULATORY COMMISSION

Inspection Report

Docket Nos.:

05000498, 05000499

License Nos.:

NPF-76, NPF-80

Report No.:

05000445/2018405; 05000446/2018405

Enterprise Identifier:

I-2018-403-0008

Licensee:

STP Nuclear Operating Company

Facility:

South Texas Project Electric Generating Station, Units 1 and 2

Location:

Wadsworth, Texas

Dates:

June 18 to June 21, 2018

Inspector:

A. Meyen, Physical Security Inspector

Approved By:

Jeremy R. Groom

Chief, Plant Support Branch 1

Division of Reactor Safety

2

EXECUTIVE SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees

performance by conducting a Baseline Security Inspection at South Texas Project Electric

Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The

Reactor Oversight Process is the NRCs program for overseeing the safe operation of

commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and

self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations

No Findings

Additional Tracking Items

No Additional Items

3

Report Details

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in

effect at the beginning of the inspection unless otherwise noted. Samples were declared

complete when the IP requirements most appropriate to the inspection activity were met

consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for

Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and

records, observed activities, and interviewed personnel to assess licensee performance and

compliance with Commission rules and regulations, license conditions, site procedures, and

standards.

SAFEGUARDS

IP 71130.02 - Access Control (1 Sample)

The inspector evaluated the security program. The following elements were evaluated:

Tier I: all 19 requirements

Tier II: all 7 requirements

Tier III: all 1 requirement

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

On June 21, 2018, the inspectors presented the Baseline Security Inspection results to

Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the

licensee staff. The inspector verified no proprietary information was retained or documented in

this report. The inspector confirmed that proprietary information was controlled to protect from

public disclosure.

4

DOCUMENTS REVIEWED

Procedure Type Designation Description or Title Revision

71130.02

Procedure

Security

Instructions

Security

Logs

Audits

OPGP03-ZS-0001

Vehicle, Material and Personnel

Access Control

50

OPGP03-ZS-0005

Control of Keys, Locks, Cores,

Keycards and Passwords

22

OPGO-ZA-0001

Plant Access Authorization

Program

34

1005

Security Incidents

8

1006

Security Performance Indicator

Calculation

10

2101

Access Control

29

2402

Alarm Station Operator

26

3701

Security Equipment Operability

Test

37

3702

Explosive Detector Operability

Test

4

3001

Security Force Communications

10

Misc.

Designated Vehicle List 5-30-18

N/A

SEL

Security Event Logs

Dates, 10-03-17 to 5-31-18

N/A

Logs

Security Daily Logs(CAS)

Dates, 6/1/18 - 6/20/18

N/A

Self-Assessment

Access Control Self-Assessment

5-10-18

N/A

Audit 17-02

Physical Security Quality Audit

Report

N/A

Condition Reports

17-21674

17-21675

17-21680

17-21728

17-21742

17-21678

17-21714

17-21717

17-21720

17-21740

17-21741

17-15288

17-02145

17-17882

17-22663

17-21346 18-542

18-818 18-233

18-1620

ML18197A371

Entire Report:

ADAMS:

Non-Publicly Available

Non-Sensitive

Keyword:

SUNSI Review By: ADM Yes No

Publicly Available

Sensitive ______

OFFICE

PSI:PSB1

PSI:PSB1

C:PSB1

C:RPB

C:PSB1

NAME

AMeyen

RLanfear

JGroom

NTaylor

JGroom

SIGNATURE

/RA/

/RA/

/RA/

/RA DProulx

Acting For/

/RA/

DATE

6/26/18

6/26/18

7/05/18

07/16/18

07/16/18