IR 05000498/2018403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(11 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/17/2018
| issue date = 12/17/2018
| title = Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| title = Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| author name = Holman D A
| author name = Holman D
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Powell G T
| addressee name = Powell G
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 17 , 2018 Mr. G. Executive Vice President and CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
{{#Wiki_filter:ber 17, 2018


SUBJECT: ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018 40 3; 05000499/201 8 40 3
==SUBJECT:==
ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403


==Dear Mr. Powell:==
==Dear Mr. Powell:==
The NRC has confirmed an error in the NRC Inspection Report No. 05000498/2018403 , 05000499/2018403, July 16, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18197A371). Specifically, the report omitted the scope and results of the performance indicator verification sample that was completed according to Inspection Procedure 71151 Performance Indicator Verification. The NRC has reissued the report in its entirety to correct this error.
The NRC has confirmed an error in the NRC Inspection Report No. 05000498/2018403, 05000499/2018403, July 16, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18197A371). Specifically, the report omitted the scope and results of the performance indicator verification sample that was completed according to Inspection Procedure 71151 Performance Indicator Verification. The NRC has reissued the report in its entirety to correct this error.


In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room).


However, the enclosed, revised report contains Security
However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security
-Related Information, please mark your entire response "Security
-Related Information  
- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/ David A. Holman
Sincerely,
, Chief Plant Support Branch 1 Division Reactor Safety Docket No s.: 50-4 98 , 50-4 99 License No s.: NPF-76 and NPF-80
/RA/
David A. Holman, Chief Plant Support Branch 1 ber 17, 2018


===Enclosure:===
==SUBJECT:==
N RC Inspection Report 050004 98/201840 3 , 050004 99/201840 3 December 17, 2018 Mr. G. Executive Vice President and CNO STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
 
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018 40 3; 05000499/201 8 40 3


==Dear Mr. Powell:==
==Dear Mr. Powell:==
Line 47: Line 42:
The NRC inspector did not identify any finding or violation of more than minor significance.
The NRC inspector did not identify any finding or violation of more than minor significance.


In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-rm/adams.html (the Public Electronic Reading Room). If you choose to provide a response to this report that contains Security
-Related Information, please mark your entire response "Security
-Related Information
- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/ David A. Holman
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
, Chief Plant Support Branch 1 Division Reactor Safety Docket No s.: 50-4 98 , 50-4 99 License No s.: NPF-76 and NPF-80


===Enclosure:===
Sincerely,
NRC Inspection Report 050004 98/201840 3 , 050004 99/201840 3 Enclosure U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket No s.: 050004 98, 050004 99 License No s.: NPF-76 , NPF-8 0 Report No s.: 05000445/201840 3; 05000446/201840 3 Enterprise Identifier:
/RA/
I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas 77483 Dates: June 18, 2018 to J une 2 1 , 2018 Inspector:
David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:
A. Meyen, Physical Security Inspector Approved By:
NRC Inspection Report 05000498/2018403, 05000499/2018403
David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety 2
 
U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket Nos.: 05000498, 05000499 License Nos.: NPF-76, NPF-80 Report Nos.: 05000445/2018403; 05000446/2018403 Enterprise Identifier: I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas 77483 Dates: June 18, 2018 to June 21, 2018 Inspector: A. Meyen, Physical Security Inspector Approved By: David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
 
South Texas Project Electric Generating Station, Units 1 and 2
, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.


List of Findings and Violations No Findings Additional Tracking Items No Additional Items
List of Findings and Violations No Findings Additional Tracking Items No Additional Items


3
=INSPECTION SCOPES=


=INSPECTION SCOPES=
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors.The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==SAFEGUARDS==
==SAFEGUARDS==
71130.0 2 - Access Control (1 Sample)  The inspector evaluated the security program. The following elements were evaluated:
 
Tier I: a ll 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement 71151 - Performance Indicator Verification (1 Sample)
==71130.02 - Access Control==
{{IP sample|IP=IP 71130.02|count=1}}
 
The inspector evaluated the security program. The following elements were evaluated:
Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement
 
===71151 - Performance Indicator Verification ===
{{IP sample|IP=IP 71151|count=1}}
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.
: (1) Protected Area Security Equipment Performance Index
: (1) Protected Area Security Equipment Performance Index
Line 85: Line 79:


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
On June 2 1, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report
On June 21, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.
.
4


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


71130.02 - Access Control
71130.02 - Access Control
Procedure Type Designation
Procedure Type           Designation         Description or Title                 Revision
Description or Title
71130.02 Procedure       OPGP03-ZS-0001 Vehicle, Material and Personnel           50
Revision 71130.02 Procedure OPGP03-ZS-0001 Vehicle, Material and Personnel 50   Access Control
Access Control
OPGP03-ZS-0005 Control of Keys, Locks, Cores, 22   Keycards and Passwords
OPGP03-ZS-0005 Control of Keys, Locks, Cores,           22
OPGO-ZA-0001 Plant Access Authorization
Keycards and Passwords
Program Security 1005 Security Incidents
OPGO-ZA-0001 Plant Access Authorization                 34
Instructions
Program
1006 Security Performance Indicator
Security     1005               Security Incidents                   8
Instructions 1006               Security Performance Indicator       10
Calculation
Calculation
2101 Access Control
2101               Access Control                       29
2402 Alarm Station Operator
2402               Alarm Station Operator               26
3701 Security Equipment Operability
3701               Security Equipment Operability       37
Test   3702 Explosive Detector Operability
Test
Test   3001 Security Force Communications
3702               Explosive Detector Operability       4
Misc. Designated Vehicle List 5
Test
-30-18 N/A Security Logs SEL Security Event Logs Dates, 10-03-17 to 5-31-18 N/A  Logs Security Daily Logs(CAS)
3001               Security Force Communications         10
N/A   Dates, 6/1/18  
Misc.             Designated Vehicle List 5-30-18       N/A
- 6/20/18   Self-Assessment
Security     SEL               Security Event Logs Dates,           N/A
Access Control Self
Logs                            10-03-17 to 5-31-18
-Assessment
Logs               Security Daily Logs(CAS)             N/A
N/A Audits 5-10-18   Audit 17-02 Physical Security Quality Audit
Dates, 6/1/18 - 6/20/18
N/A   Report   Condition Reports
Self-Assessment Access Control Self-Assessment           N/A
17-21674 17-21675 17-21680 17-21728 17-21742 17-21678 17-21714 17-21717 17-21720 17-21740 17-21741 17-15288 17-02145 17-17882 17-22663 17-21346 18-542 18-818 18-233 18-1620
Audits                           5-10-18
G.T. Powell
Audit 17-02       Physical Security Quality Audit       N/A
ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY
Report
INSPECTION REPORT
Condition Reports
05000498/2018
17-21674           17-21675         17-21680           17-21728           17-21742
3; 05000499/201
17-21678           17-21714         17-21717           17-21720           17-21740
40 3 DATED DECEMBER 17, 2018
17-21741           17-15288         17-02145           17-17882           17-22663
Distribution w/enclosure
17-21346           18-542           18-818             18-233             18-1620
: EWharton, NSIR
 
NSimonian, NSIR
ML18351A428
DGarner, NSIR
Cover Letter             ADAMS:         Non-Publicly Available     Non-Sensitive Keyword:
DHuyck, NSIR
SUNSI Review By: ADM  Yes No         Publicly Available         Sensitive
DJohnson, NSIR RMcKinley, RI DRS
OFFICE         PSI:PSB1     C:PSB1         C:RPB           C:PSB1
BDesai, RII DRS
NAME           AMeyen       DHolman       NTaylor         DHolman
SOrth, RIII DRS
SIGNATURE     /RA/         /RA/           /RA/           /RA/
KKennedy, ORA
DATE           12/13/18     12/13/18       12/13/18       12/17/18
SMorris, ORA
AVegel DRP
MHay, DRP MShaffer, DRS
RLantz, DRS
DHolman, DRS
BTharakan, DRP  LReyna, DRP ASanchez, DRP NTaylor, DRP JChoate, DRP JMelfi, DRP ECombs, DRP  Distribution w/o enclosure
: VDricks, ORA
LRegner,NRR MHerrera, FRMB
DCylkowski , ORA GMiller, DRS
PJayroe, DRS
JWeil, RIV/OCA
AMoreno, RIV/OCA
CCook, RIV/OEDO
ACES  GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
NUMBER: ML18351A428
Cover Letter
ADAMS:   Non-Publicly Available
Non-Sensitive Keyword:   SUNSI Review By: ADM  Yes     No Publicly Available
Sensitive
OFFICE PSI:PSB1 C:PSB1 C:RPB C:PSB1 NAME AMeyen DHolman NTaylor DHolman SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 12/13/18 12/13/18 12/13/18 12/17/18 OFFICIAL RECORD COPY


G. T. Powell 3  SOUTH TEXAS PROJECT
ML18351A428
ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
Entire Report:           ADAMS:         Non-Publicly Available     Non-Sensitive Keyword:
- DATED DECEMBER 17, 2018  Distribution w/enclosure
SUNSI Review By: ADM  Yes No         Publicly Available         Sensitive   NRC-002
: EWharton, NSIR
OFFICE         PSI:PSB1     C:PSB1         C:PBB           C:PSB1       1
NSimonian, NSIR
NAME           AMeyen       DHolman       NTaylor         DHolman
DGarner, NSIR
SIGNATURE       /RA/         /RA/           /RA/           /RA/
DHuyck, NSIR
DATE           12/12/18     12/14/18       12/15/18       12/17/18
DJohnson, NSIR RMcKinley, RI DRS
BDesai, RII DRS
SOrth, RIII DRS
KKennedy, ORA
SMorris, ORA
AVegel DRP
MHay, DRP MShaffer, DRS
RLantz, DRS
DHolman, DRS
BTharakan, DRP  LReyna, DRP ASanchez, DRP NTaylor, DRP JChoate, DRP JMelfi, DRP ECombs, DRP  Distribution w/o enclosure
: VDricks, ORA
LRegner,NRR MHerrera, FRMB
DCylkowski , ORA GMiller, DRS
PJayroe, DRS
JWeil, RIV/OCA
AMoreno, RIV/OCA
CCook, RIV/OEDO
ACES  GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
NUMBER: ML183 51 A 428 Entire Report:
ADAMS:   Non-Publicly Available
Non-Sensitive Keyword:   SUNSI Review By: ADM  Yes     No Publicly Available
Sensitive NRC-002 OFFICE PSI:PSB1 C:PSB1 C:PBB C:PSB1 1 NAME AMeyen DHolman NTaylor DHolman   SIGNATURE /RA/ /RA/ /RA/ /RA/   DATE 12/12/18 12/14/18 12/15/18 12/17/18   OFFICIAL RECORD COPY
}}
}}

Latest revision as of 11:22, 15 November 2019

Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
ML18351A428
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/17/2018
From: David Holman
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2018403
Download: ML18351A428 (10)


Text

ber 17, 2018

SUBJECT:

ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

Dear Mr. Powell:

The NRC has confirmed an error in the NRC Inspection Report No. 05000498/2018403, 05000499/2018403, July 16, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18197A371). Specifically, the report omitted the scope and results of the performance indicator verification sample that was completed according to Inspection Procedure 71151 Performance Indicator Verification. The NRC has reissued the report in its entirety to correct this error.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

David A. Holman, Chief Plant Support Branch 1 ber 17, 2018

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

Dear Mr. Powell:

On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:

NRC Inspection Report 05000498/2018403, 05000499/2018403

U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket Nos.: 05000498, 05000499 License Nos.: NPF-76, NPF-80 Report Nos.: 05000445/2018403; 05000446/2018403 Enterprise Identifier: I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas 77483 Dates: June 18, 2018 to June 21, 2018 Inspector: A. Meyen, Physical Security Inspector Approved By: David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations No Findings Additional Tracking Items No Additional Items

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the security program. The following elements were evaluated:

Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement

71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.

(1) Protected Area Security Equipment Performance Index

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On June 21, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71130.02 - Access Control

Procedure Type Designation Description or Title Revision

71130.02 Procedure OPGP03-ZS-0001 Vehicle, Material and Personnel 50

Access Control

OPGP03-ZS-0005 Control of Keys, Locks, Cores, 22

Keycards and Passwords

OPGO-ZA-0001 Plant Access Authorization 34

Program

Security 1005 Security Incidents 8

Instructions 1006 Security Performance Indicator 10

Calculation

2101 Access Control 29

2402 Alarm Station Operator 26

3701 Security Equipment Operability 37

Test

3702 Explosive Detector Operability 4

Test

3001 Security Force Communications 10

Misc. Designated Vehicle List 5-30-18 N/A

Security SEL Security Event Logs Dates, N/A

Logs 10-03-17 to 5-31-18

Logs Security Daily Logs(CAS) N/A

Dates, 6/1/18 - 6/20/18

Self-Assessment Access Control Self-Assessment N/A

Audits 5-10-18

Audit 17-02 Physical Security Quality Audit N/A

Report

Condition Reports

17-21674 17-21675 17-21680 17-21728 17-21742

17-21678 17-21714 17-21717 17-21720 17-21740

17-21741 17-15288 17-02145 17-17882 17-22663

17-21346 18-542 18-818 18-233 18-1620

ML18351A428

Cover Letter ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: ADM Yes No Publicly Available Sensitive

OFFICE PSI:PSB1 C:PSB1 C:RPB C:PSB1

NAME AMeyen DHolman NTaylor DHolman

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 12/13/18 12/13/18 12/13/18 12/17/18

ML18351A428

Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: ADM Yes No Publicly Available Sensitive NRC-002

OFFICE PSI:PSB1 C:PSB1 C:PBB C:PSB1 1

NAME AMeyen DHolman NTaylor DHolman

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 12/12/18 12/14/18 12/15/18 12/17/18