ML082461014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082461014
| number = ML082461014
| issue date = 09/02/2008
| issue date = 09/02/2008
| title = Shearon Harris, Inspection/Activity Plan Report 22
| title = Inspection/Activity Plan Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB4
| author affiliation = NRC/RGN-II/DRP/RPB4
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Harris Inspection / Activity Plan 09/01/2008
{{#Wiki_filter:Page 1 of 2                                                                                    Harris 09/02/2008    17:15:51                                                              Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                                      No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                  Title                                      on Site       Start    End            Type EB2-TFP         - TRIENNIAL FIRE PROTECTION                                                                             9 1              IP 7111105P            Fire Protection-NFPA 805 Transition Period [Triennial]                                             09/22/2008 09/26/2008 Baseline Inspections 1             IP 7111105P             Fire Protection-NFPA 805 Transition Period [Triennial]                                             10/06/2008 10/10/2008 Baseline Inspections OL RQ           - REQUAL INSPECTION                                                                                     3 1              IP 7111111B            Licensed Operator Requalification Program                                                         01/12/2009 01/16/2009 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                                     3 1                V23298              HARRIS/MARCH 2009 EXAM AT POWER FACILITIES                                                         02/16/2009 02/20/2009 Not Applicable PSB1-RP         - RP PREINSPECTION VISIT (OCCUPATIONAL)                                                                 1 1              IP 7112101              Access Control to Radiologically Significant Areas                                                 02/23/2009 02/25/2009 Baseline Inspections PSB1EP         - EMERGENCY PREPAREDNESS EXERCISE                                                                       3 1              IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review             03/02/2009 03/06/2009 Baseline Inspections 1             IP 7111401              Exercise Evaluation                                                                               03/02/2009 03/06/2009 EP Baseline Inspection 1              IP 7111404              Emergency Action Level and Emergency Plan Changes                                                 03/02/2009 03/06/2009 EP Baseline Inspection 1             IP 71151-EP01          Drill/Exercise Performance                                                                         03/02/2009 03/06/2009 Baseline Inspections 1             IP 71151-EP02          ERO Drill Participation                                                                           03/02/2009 03/06/2009 Baseline Inspections 1             IP 71151-EP03          Alert & Notification System                                                                       03/02/2009 03/06/2009 Baseline Inspections OL EXAM         - INITIAL EXAM WEEK 1                                                                                   3 1                V23298              HARRIS/MARCH 2009 EXAM AT POWER FACILITIES                                                         03/09/2009 03/13/2009 Not Applicable OL EXAM         - INITIAL EXAM WEEK 2                                                                                   2 1                V23298              HARRIS/MARCH 2009 EXAM AT POWER FACILITIES                                                         03/16/2009 03/20/2009 Not Applicable PSB1-RP         - RP OCCUPATIONAL BASELINE WK1(OUTAGE)                                                                 2 1              IP 7112101              Access Control to Radiologically Significant Areas                                                 04/06/2009 04/10/2009 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                                       04/06/2009 04/10/2009 Baseline Inspections 1             IP 7112202              Radioactive Material Processing and Transportation                                                 04/06/2009 04/10/2009 Baseline Inspections 1             IP 71151-OR01          Occupational Exposure Control Effectiveness                                                       04/06/2009 04/10/2009 Baseline Inspections 1             IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                   04/06/2009 04/10/2009 Baseline Inspections EB3ISI         - INSERVICE INSPECTION                                                                                 1 1              IP 7111108P            Inservice Inspection Activities - PWR                                                             04/13/2009 04/17/2009 Baseline Inspections EB3TI172       - TI-172 RCS DM BUTT WELDS                                                                             1 1              IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                               04/13/2009 04/17/2009 Generic Safety Inspectio PSB1-RP         - RP OCCUPATIONAL BASELINE WK2 (OUTAGE)                                                                 2 1              IP 7112101              Access Control to Radiologically Significant Areas                                                 04/20/2009 04/24/2009 Baseline Inspections 1             IP 7112102              ALARA Planning and Controls                                                                       04/20/2009 04/24/2009 Baseline Inspections 1             IP 7112202              Radioactive Material Processing and Transportation                                                 04/20/2009 04/24/2009 Baseline Inspections 1             IP 71151-OR01          Occupational Exposure Control Effectiveness                                                       04/20/2009 04/24/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 17:15:51 Report 22 9 EB2-TFP-TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
09/22/2008 09/26/2008 1     7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
10/06/2008 10/10/2008 1    7111105P IP 3 OL RQ-REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 01/12/2009 01/16/2009 1    7111111B IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/16/2009 02/20/2009 1    V23298 1 PSB1-RP-RP PREINSPECTION VISIT (OCCUPATIONAL)
Baseline Inspections A ccess Control to Radiologically Significant Areas 02/23/2009 02/25/2009 1    7112101 IP 3 PSB1EP-EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 03/02/2009 03/06/2009 1     2515/175 IP EP Baseline Inspection Exercise Evaluation 03/02/2009 03/06/2009 1    7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009 1     7111404 IP Baseline Inspections Drill/Exercise Performance 03/02/2009 03/06/2009 1     71151-EP01 IP Baseline Inspections ERO Drill Participation 03/02/2009 03/06/2009 1     71151-EP02 IP Baseline Inspections A lert & Notification System 03/02/2009 03/06/2009 1    71151-EP03 IP 3 OL EXAM-INITIAL EXAM WEEK 1 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/09/2009 03/13/2009 1    V23298 2 OL EXAM-INITIAL EXAM WEEK 2 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009 1    V23298 2 PSB1-RP-RP OCCUPATIONAL BASELINE WK1(OUTAGE)
Baseline Inspections A ccess Control to Radiologically Significant Areas 04/06/2009 04/10/2009 1     7112101 IP Baseline Inspections A LARA Planning and Controls 04/06/2009 04/10/2009 1     7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/06/2009 04/10/2009 1     7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 1     71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009 1    71151-PR01 IP 1 EB3ISI-INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/13/2009 04/17/2009 1    7111108P IP 1 EB3TI172-TI-172 RCS DM BUTT WELDS Generic Safety Inspecti o Reactor Coolant System Dissimiliar Metal Butt Welds 04/13/2009 04/17/2009 1    2515/172 IP 2 PSB1-RP-RP OCCUPATIONAL BASELINE WK2 (OUTAGE)
Baseline Inspections A ccess Control to Radiologically Significant Areas 04/20/2009 04/24/2009 1     7112101 IP Baseline Inspections A LARA Planning and Controls 04/20/2009 04/24/2009 1     7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/20/2009 04/24/2009 1     7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/20/2009 04/24/2009 1    71151-OR01 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Harris Inspection / Activity Plan 09/01/2008
 
-12/31/2009 Inspection Type Inspection Activity Planned Dates Start          End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 17:15:51 Report 22 2 PSB1-RP-RP OCCUPATIONAL BASELINE WK2 (OUTAGE)
Page 2 of 2                                                                                  Harris 09/02/2008    17:15:51                                                            Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit                                                                                                        No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                Title                        on Site       Start    End            Type PSB1-RP         - RP OCCUPATIONAL BASELINE WK2 (OUTAGE)                                                 2 1              IP 71151-PR01          RETS/ODCM Radiological Effluent                                                     04/20/2009 04/24/2009 Baseline Inspections PI&R           - PROBLEM IDENTIFICATION AND RESOLUTION                                                 5 1              IP 71152B              Identification and Resolution of Problems                                           09/14/2009 09/18/2009 Baseline Inspections 1             IP 71152B               Identification and Resolution of Problems                                           09/28/2009 10/02/2009 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                     3 1                V23321              HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES                                       11/02/2009 11/06/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 1                                                                 2 1                V23321              HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES                                       11/30/2009 12/04/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 2                                                                 2 1                V23321              HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES                                       12/14/2009 12/18/2009 Not Applicable This report does not include INPO and OUTAGE activities.
Baseline Inspections RETS/ODCM Radiological Effluent 04/20/2009 04/24/2009 1    71151-PR01 IP 5 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 09/14/2009 09/18/2009 1     71152B IP Baseline Inspections Identification and Resolution of Problems 09/28/2009 10/02/2009 1    71152B IP 3 OL EXAM-INITIAL EXAM PREP Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/02/2009 11/06/2009 1    V23321 2 OL EXAM-INITIAL EXAM - WEEK 1 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/30/2009 12/04/2009 1    V23321 2 OL EXAM-INITIAL EXAM - WEEK 2 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 1    V23321 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 14:26, 14 November 2019

Inspection/Activity Plan Report 22
ML082461014
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB4
To:
Carolina Power & Light Co
Shared Package
ML082461009 List:
References
Download: ML082461014 (2)


Text

Page 1 of 2 Harris 09/02/2008 17:15:51 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB2-TFP - TRIENNIAL FIRE PROTECTION 9 1 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 09/22/2008 09/26/2008 Baseline Inspections 1 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 10/06/2008 10/10/2008 Baseline Inspections OL RQ - REQUAL INSPECTION 3 1 IP 7111111B Licensed Operator Requalification Program 01/12/2009 01/16/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/16/2009 02/20/2009 Not Applicable PSB1-RP - RP PREINSPECTION VISIT (OCCUPATIONAL) 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 03/02/2009 03/06/2009 Baseline Inspections 1 IP 7111401 Exercise Evaluation 03/02/2009 03/06/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 03/02/2009 03/06/2009 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 1 3 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/09/2009 03/13/2009 Not Applicable OL EXAM - INITIAL EXAM WEEK 2 2 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009 Not Applicable PSB1-RP - RP OCCUPATIONAL BASELINE WK1(OUTAGE) 2 1 IP 7112101 Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/06/2009 04/10/2009 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/06/2009 04/10/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009 Baseline Inspections EB3ISI - INSERVICE INSPECTION 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/13/2009 04/17/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/13/2009 04/17/2009 Generic Safety Inspectio PSB1-RP - RP OCCUPATIONAL BASELINE WK2 (OUTAGE) 2 1 IP 7112101 Access Control to Radiologically Significant Areas 04/20/2009 04/24/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/20/2009 04/24/2009 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/20/2009 04/24/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 04/20/2009 04/24/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Harris 09/02/2008 17:15:51 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1-RP - RP OCCUPATIONAL BASELINE WK2 (OUTAGE) 2 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 04/20/2009 04/24/2009 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 IP 71152B Identification and Resolution of Problems 09/14/2009 09/18/2009 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 09/28/2009 10/02/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23321 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/02/2009 11/06/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 2 1 V23321 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/30/2009 12/04/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 2 1 V23321 HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.