ML082461014
| ML082461014 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/02/2008 |
| From: | NRC/RGN-II/DRP/RPB4 |
| To: | Carolina Power & Light Co |
| Shared Package | |
| ML082461009 | List: |
| References | |
| Download: ML082461014 (2) | |
Text
Harris Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 17:15:51 Report 22 9
EB2-TFP
- TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
09/22/2008 09/26/2008 1
7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]
10/06/2008 10/10/2008 1
7111105P IP 3
- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 01/12/2009 01/16/2009 1
7111111B IP 3
OL EXAM
- INITIAL EXAM PREP Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/16/2009 02/20/2009 1
V23298 1
PSB1-RP
- RP PREINSPECTION VISIT (OCCUPATIONAL)
Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 1
7112101 IP 3
PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 03/02/2009 03/06/2009 1
2515/175 IP EP Baseline Inspection Exercise Evaluation 03/02/2009 03/06/2009 1
7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009 1
7111404 IP Baseline Inspections Drill/Exercise Performance 03/02/2009 03/06/2009 1
71151-EP01 IP Baseline Inspections ERO Drill Participation 03/02/2009 03/06/2009 1
71151-EP02 IP Baseline Inspections Alert & Notification System 03/02/2009 03/06/2009 1
71151-EP03 IP 3
OL EXAM
- INITIAL EXAM WEEK 1 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/09/2009 03/13/2009 1
V23298 2
OL EXAM
- INITIAL EXAM WEEK 2 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009 1
V23298 2
PSB1-RP
- RP OCCUPATIONAL BASELINE WK1(OUTAGE)
Baseline Inspections Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 1
7112101 IP Baseline Inspections ALARA Planning and Controls 04/06/2009 04/10/2009 1
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/06/2009 04/10/2009 1
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 1
71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009 1
71151-PR01 IP 1
EB3ISI
- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/13/2009 04/17/2009 1
7111108P IP 1
EB3TI172
- TI-172 RCS DM BUTT WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/13/2009 04/17/2009 1
2515/172 IP 2
PSB1-RP
- RP OCCUPATIONAL BASELINE WK2 (OUTAGE)
Baseline Inspections Access Control to Radiologically Significant Areas 04/20/2009 04/24/2009 1
7112101 IP Baseline Inspections ALARA Planning and Controls 04/20/2009 04/24/2009 1
7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/20/2009 04/24/2009 1
7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/20/2009 04/24/2009 1
71151-OR01 IP This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Harris Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 17:15:51 Report 22 2
PSB1-RP
- RP OCCUPATIONAL BASELINE WK2 (OUTAGE)
Baseline Inspections RETS/ODCM Radiological Effluent 04/20/2009 04/24/2009 1
71151-PR01 IP 5
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 09/14/2009 09/18/2009 1
71152B IP Baseline Inspections Identification and Resolution of Problems 09/28/2009 10/02/2009 1
71152B IP 3
OL EXAM
- INITIAL EXAM PREP Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/02/2009 11/06/2009 1
V23321 2
OL EXAM
- INITIAL EXAM - WEEK 1 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/30/2009 12/04/2009 1
V23321 2
OL EXAM
- INITIAL EXAM - WEEK 2 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 1
V23321 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.