Inspection/Activity Plan Report 22
ML082461014
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB4
To:
Carolina Power & Light Co
Shared Package
ML082461009 List:
References
Download: ML082461014 (2)


Text

Harris Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 09/02/2008 17:15:51 Report 22 9

EB2-TFP

- TRIENNIAL FIRE PROTECTION Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

09/22/2008 09/26/2008 1

7111105P IP Baseline Inspections Fire Protection-NFPA 805 Transition Period [Triennial]

10/06/2008 10/10/2008 1

7111105P IP 3

OL RQ

- REQUAL INSPECTION Baseline Inspections Licensed Operator Requalification Program 01/12/2009 01/16/2009 1

7111111B IP 3

OL EXAM

- INITIAL EXAM PREP Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/16/2009 02/20/2009 1

V23298 1

PSB1-RP

- RP PREINSPECTION VISIT (OCCUPATIONAL)

Baseline Inspections Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 1

7112101 IP 3

PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE Baseline Inspections Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 03/02/2009 03/06/2009 1

2515/175 IP EP Baseline Inspection Exercise Evaluation 03/02/2009 03/06/2009 1

7111401 IP EP Baseline Inspection Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009 1

7111404 IP Baseline Inspections Drill/Exercise Performance 03/02/2009 03/06/2009 1

71151-EP01 IP Baseline Inspections ERO Drill Participation 03/02/2009 03/06/2009 1

71151-EP02 IP Baseline Inspections Alert & Notification System 03/02/2009 03/06/2009 1

71151-EP03 IP 3

OL EXAM

- INITIAL EXAM WEEK 1 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/09/2009 03/13/2009 1

V23298 2

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009 1

V23298 2

PSB1-RP

- RP OCCUPATIONAL BASELINE WK1(OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 1

7112101 IP Baseline Inspections ALARA Planning and Controls 04/06/2009 04/10/2009 1

7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/06/2009 04/10/2009 1

7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 1

71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009 1

71151-PR01 IP 1

EB3ISI

- INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - PWR 04/13/2009 04/17/2009 1

7111108P IP 1

EB3TI172

- TI-172 RCS DM BUTT WELDS Generic Safety Inspectio Reactor Coolant System Dissimiliar Metal Butt Welds 04/13/2009 04/17/2009 1

2515/172 IP 2

PSB1-RP

- RP OCCUPATIONAL BASELINE WK2 (OUTAGE)

Baseline Inspections Access Control to Radiologically Significant Areas 04/20/2009 04/24/2009 1

7112101 IP Baseline Inspections ALARA Planning and Controls 04/20/2009 04/24/2009 1

7112102 IP Baseline Inspections Radioactive Material Processing and Transportation 04/20/2009 04/24/2009 1

7112202 IP Baseline Inspections Occupational Exposure Control Effectiveness 04/20/2009 04/24/2009 1

71151-OR01 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Harris Inspection / Activity Plan 09/01/2008 - 12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 09/02/2008 17:15:51 Report 22 2

PSB1-RP

- RP OCCUPATIONAL BASELINE WK2 (OUTAGE)

Baseline Inspections RETS/ODCM Radiological Effluent 04/20/2009 04/24/2009 1

71151-PR01 IP 5

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections Identification and Resolution of Problems 09/14/2009 09/18/2009 1

71152B IP Baseline Inspections Identification and Resolution of Problems 09/28/2009 10/02/2009 1

71152B IP 3

OL EXAM

- INITIAL EXAM PREP Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/02/2009 11/06/2009 1

V23321 2

OL EXAM

- INITIAL EXAM - WEEK 1 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 11/30/2009 12/04/2009 1

V23321 2

OL EXAM

- INITIAL EXAM - WEEK 2 Not Applicable HARRIS/NOVEMBER 2009 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 1

V23321 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.