{{#Wiki_filter:September 23, 2008  
{{#Wiki_filter:UNITE D S TATES
 
                                  NUC LEAR RE GULATOR Y C OMMIS SI ON
  Mr. Adam C. Heflin, Senior Vice   President and Chief Nuclear Officer Union Electric Company  
                                                    R EG I O N I V
P.O. Box 620 Fulton, MO 65251  
                                        612 EAST LAMAR BLVD , SU ITE 400
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000483/2008005) AND REQUEST FOR INFORMATION  
                                          AR L IN GTON , TEXAS 7 6 011 - 4125
Dear Mr. Heflin:  
                                          September 23, 2008
From October 20 to 31, 2008, reactor inspectors from the U. S. Nuclear Regulatory Commission's (NRC) Region IV office will perform the baseline inservice inspection at Callaway Plant, using NRC Inspection Procedure 71111.08 and Temporary Instruction 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds.Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize  
Mr. Adam C. Heflin, Senior Vice
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the  
  President and Chief Nuclear Officer
site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Union Electric Company
We have discussed the schedule for these inspection activities with your staff and understand  
P.O. Box 620
that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing organization. Our inspection dates are subject to change based on your updated schedule of outage activities. If there are any questions about this inspection or the material requested, please contact the lead inspector R. Kopriva at (817) 860-8104 (Ron.Kopriva@nrc.gov ). UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Fulton, MO 65251
Union Electric Company - 2 -
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's
              REPORT 05000483/2008005) AND REQUEST FOR INFORMATION
document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Dear Mr. Heflin:
      Sincerely, 
From October 20 to 31, 2008, reactor inspectors from the U. S. Nuclear Regulatory
      /RA/
Commissions (NRC) Region IV office will perform the baseline inservice inspection at Callaway
      Russell L. Bywater, Chief      Engineering Branch 1      Division of Reactor Safety
Plant, using NRC Inspection Procedure 71111.08 and Temporary Instruction 2515/172,
Docket:  50-483
Reactor Coolant System Dissimilar Metal Butt Welds. Experience has shown that this
License:  NPF-30
inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize
Enclosure:  Inservice Inspection Document Request cc w/enclosure:
the impact to your onsite resources and to ensure a productive inspection, we have enclosed a
John O'Neill, Esq. Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W. Washington, DC  20037
request for documents needed for this inspection. These documents have been divided into two
groups. The first group (Section A of the enclosure) identifies information to be provided prior to
Mr. Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO  65251
the inspection to ensure that the inspectors are adequately prepared. The second group
(Section B of the enclosure) identifies the information the inspectors will need upon arrival at the
site. It is important that all of these documents are up to date and complete in order to minimize
the number of additional documents requested during the preparation and/or the onsite portions
of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing
organization. Our inspection dates are subject to change based on your updated schedule of
outage activities. If there are any questions about this inspection or the material requested,
please contact the lead inspector R. Kopriva at (817) 860-8104 (Ron.Kopriva@nrc.gov ).


Mr. Tom Elwood, Supervising Engineer Regulatory Affairs and Licensing AmerenUE P.O. Box 620  
Union Electric Company                          -2-
Fulton, MO 65251  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360  
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA/
                                              Russell L. Bywater, Chief
                                              Engineering Branch 1
                                              Division of Reactor Safety
Docket: 50-483
License: NPF-30
Enclosure:
Inservice Inspection Document Request
cc w/enclosure:
John ONeill, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N. Street, N.W.
Washington, DC 20037
Mr. Scott A. Maglio, Assistant Manager
Regulatory Affairs
AmerenUE
P.O. Box 620
Fulton, MO 65251
Mr. Tom Elwood, Supervising Engineer
Regulatory Affairs and Licensing
AmerenUE
P.O. Box 620
Fulton, MO 65251
Missouri Public Service Commission
Governor Office Building
200 Madison Street
P.O. Box 360
Jefferson City, MO 65102-0360


 
Union Electric Company                       -3-
Union Electric Company - 3 -  
Mr. H. Floyd Gilzow
Mr. H. Floyd Gilzow Deputy Director for Policy Department of Natural Resources P. O. Box 176  
Deputy Director for Policy
Jefferson City, MO 65102-0176  
Department of Natural Resources
Mr. Rick A. Muench, President and   Chief Executive officer Wolf Creek Nuclear Operating Corporation  
P. O. Box 176
P.O. Box 411 Burlington, KS 66839  
Jefferson City, MO 65102-0176
Kathleen Logan Smith, Executive Director and Kay Drey, Representative, Board of Directors Missouri Coalition for the Environment 6267 Delmar Boulevard, Suite 2E  
Mr. Rick A. Muench, President and
St. Louis City, MO 63130  
Chief Executive officer
Mr. Lee Fritz, Presiding Commissioner Callaway County Courthouse 10 East Fifth Street  
Wolf Creek Nuclear Operating Corporation
Fulton, MO 65251  
P.O. Box 411
Mr. Les H. Kanuckel, Manager Quality Assurance AmerenUE  
Burlington, KS 66839
P.O. Box 620 Fulton, MO 65251  
Kathleen Logan Smith, Executive Director and
Director, Missouri State Emergency   Management Agency  
Kay Drey, Representative, Board of Directors
P.O. Box 116 Jefferson City, MO 65102-0116  
Missouri Coalition for the Environment
Mr. Scott Clardy, Director Section for Environmental Public Health  
6267 Delmar Boulevard, Suite 2E
Missouri Department of Health and   Senior Services 930 Wildwood Drive P.O. Box 570 Jefferson City, MO 65102-0570  
St. Louis City, MO 63130
Mr. Luke Graessle, Manager  
Mr. Lee Fritz, Presiding Commissioner
  Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251
Callaway County Courthouse
Union Electric Company - 4 -  
10 East Fifth Street
  Mr. Tom Elwood, Supervising Engineer Regulatory Affairs and Licensing AmerenUE  
Fulton, MO 65251
P.O. Box 620 Fulton, MO 65251  
Mr. Les H. Kanuckel, Manager
Certrec Corporation 4200 South Hulen, Suite 422  
Quality Assurance
Fort Worth, TX 76109  
AmerenUE
Mr. Keith G. Henke, Planner II Division of Community and Public Health Office of Emergency Coordination Missouri Department of Health and   Senior Services  
P.O. Box 620
930 Wildwood Drive P.O. Box 570 Jefferson City, MO 65102  
Fulton, MO 65251
Technical Services Branch Chief  
Director, Missouri State Emergency
FEMA Region VII 2323 Grand Boulevard, Suite 900 Kansas City, MO 64108-2670  
Management Agency
 
P.O. Box 116
Union Electric Company - 5 -  
Jefferson City, MO 65102-0116
Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov ) DRS Director (Roy.Caniano@nrc.gov ) DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (David.Dumbacher@nrc.gov) Resident Inspector (Jeremy.Groom@nrc.gov ) Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov ) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) CWY Site Secretary (Dawn.Yancey@nrc.gov )  
Mr. Scott Clardy, Director
   
Section for Environmental Public Health
   
Missouri Department of Health and
   
Senior Services
   
930 Wildwood Drive
  SUNSI Review Completed: __RLB_ ADAMS:   Yes             Initials: _RLB
P.O. Box 570
__    Publicly Available         Non-Sensitive
Jefferson City, MO 65102-0570
R:/REACTORS/CW 2008005 request for info - RAK   ML082670988
Mr. Luke Graessle, Manager
EB1 EB1   C: EB1 RAKopriva JPAdams   RLBywater /RA/ /RA/   /RA/ 9/17/08 9/17/08   9/23/08 OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  
Regulatory Affairs
 
AmerenUE
  - 1 - Enclosure
P.O. Box 620
INSERVICE INSPECTION DOCUMENT REQUEST  
Fulton, MO 65251
    Inspection Dates: October 20 - 31, 2008  
 
Union Electric Company                 -4-
Inspection Procedures: IP 71111.08 "Inservice Inspection (ISI) Activities"    TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt     Welds"
Mr. Tom Elwood, Supervising Engineer
Inspectors:   Ron Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)  
Regulatory Affairs and Licensing
    James Adams, PhD., Reactor Inspector  
AmerenUE
A. Information Requested for the In-Office Preparation Week  
P.O. Box 620
The following information (Section A of this enclosure) should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com preferred), in care of R. Kopriva, by October 7, 2008, to facilitate the selection of specific items that will be reviewed during the onsite  
Fulton, MO 65251
inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.  
Certrec Corporation
A.1 ISI/Welding Programs and Schedule Information
4200 South Hulen, Suite 422
  a) A detailed schedule (including preliminary dates) of:  
Fort Worth, TX 76109
i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems and containment, performed as part of your ASME Section XI, Risk  
Mr. Keith G. Henke, Planner II
Informed (if applicable), and augmented ISI programs during the upcoming outage.  
Division of Community and Public Health
  Provide a status summary of the NDE inspection activities vs. the required inspection period percentages for this Interval by category per  
Office of Emergency Coordination
ASME Section XI, IWX-2400 (Do not provide separately if other documentation requested contains this information).  
Missouri Department of Health and
ii) Reactor pressure vessel head (RPVH) examinations planned for the upcoming refueling outage.  
Senior Services
iii) Examinations planned for Alloy 82/182/600 components that are not included in the Section XI scope (If applicable).  
930 Wildwood Drive
 
P.O. Box 570
  - 2 - Enclosure iv) Examinations planned as part of your Boric Acid Corrosion Control Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)  
Jefferson City, MO 65102
v) Welding activities that are scheduled to be completed during the upcoming outage (ASME Class 1, 2, or 3 structures, systems, or components (SSCs))  
Technical Services Branch Chief
b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety Evaluations applicable to the examinations identified above.
FEMA Region VII
c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant, Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code Class 1 & 2 systems since the beginning of the last refueling outage. This should include the previous Section XI pressure test(s) conducted during start up and any evaluations associated with the results of the pressure tests. Also, include in the list the NDE reports with relevant conditions in the RPVH penetration nozzles which have been accepted for continued service. The list of NDE reports should include a brief description of the SSC where the relevant condition was identified.  
2323 Grand Boulevard, Suite 900
d) A list with a brief description (e.g., system, material, pipe size, weld number, and NDE performed) of the welds in Code Class 1 and 2 systems which have been fabricated due to component repair/replacement activities since the beginning of the last refueling outage, or are planned to be fabricated in this refueling outage.  
Kansas City, MO 64108-2670
e) If reactor vessel weld examinations required by the ASME Code are scheduled to occur during the upcoming outage, provide a detailed description of the welds to be examined and the extent of the planned examination. Please also provide reference numbers for applicable procedures that will be used to conduct these  
 
examinations.  
Union Electric Company                         -5-
f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of Section XI of the ASME Code that have been identified since the beginning of the last refueling outage.  
Electronic distribution by RIV:
g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
Regional Administrator (Elmo.Collins@nrc.gov )
h) Please provide copies of the most recent self assessments for the ISI, Welding, and Alloy 600 Programs.
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (David.Dumbacher@nrc.gov)
Resident Inspector (Jeremy.Groom@nrc.gov )
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
CWY Site Secretary (Dawn.Yancey@nrc.gov )
SUNSI Review Completed: __RLB_               ADAMS: Yes               Initials: _RLB__
        Publicly Available                                 Non-Sensitive
R:/REACTORS/CW 2008005 request for info - RAK                           ML082670988
EB1                   EB1                                                     C: EB1
RAKopriva             JPAdams                                                 RLBywater
/RA/                 /RA/                                                     /RA/
9/17/08               9/17/08                                                 9/23/08
OFFICIAL RECORD COPY T=Telephone                   E=E-mail     F=Fax
 
                        INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:               October 20 - 31, 2008
Inspection Procedures:         IP 71111.08 Inservice Inspection (ISI) Activities
                                TI 2515/172 Reactor Coolant System Dissimilar Metal Butt
                                Welds
Inspectors:                     Ron Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)
                                James Adams, PhD., Reactor Inspector
A.       Information Requested for the In-Office Preparation Week
The following information (Section A of this enclosure) should be sent to the Region IV office in
hard copy or electronic format (ims.certrec.com preferred), in care of R. Kopriva, by October 7,
2008, to facilitate the selection of specific items that will be reviewed during the onsite
inspection week. The inspector will select specific items from the information requested below
and then request from your staff additional documents needed during the onsite inspection
week (Section B of this enclosure). We ask that the specific items selected from the lists be
available and ready for review on the first day of inspection. *Please provide requested
documentation electronically if possible. If requested documents are large and only hard copy
formats are available, please inform the inspector(s), and provide subject documentation during
the first day of the onsite inspection. If you have any questions regarding this information
request, please call the inspector as soon as possible.
A.1     ISI/Welding Programs and Schedule Information
        a)     A detailed schedule (including preliminary dates) of:
                i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                        and containment, performed as part of your ASME Section XI, Risk
                        Informed (if applicable), and augmented ISI programs during the
                        upcoming outage.
                        Provide a status summary of the NDE inspection activities vs. the
                        required inspection period percentages for this Interval by category per
                        ASME Section XI, IWX-2400 (Do not provide separately if other
                        documentation requested contains this information).
                ii)     Reactor pressure vessel head (RPVH) examinations planned for the
                        upcoming refueling outage.
                iii)   Examinations planned for Alloy 82/182/600 components that are not
                        included in the Section XI scope (If applicable).
                                              -1-                                         Enclosure
 
          iv)     Examinations planned as part of your Boric Acid Corrosion Control
                  Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs))
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
          Evaluations applicable to the examinations identified above.
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
          include the previous Section XI pressure test(s) conducted during start up and
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
          which have been accepted for continued service. The list of NDE reports should
          include a brief description of the SSC where the relevant condition was identified.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
          the last refueling outage, or are planned to be fabricated in this refueling outage.
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
          occur during the upcoming outage, provide a detailed description of the welds to
          be examined and the extent of the planned examination. Please also provide
          reference numbers for applicable procedures that will be used to conduct these
          examinations.
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
          Section XI of the ASME Code that have been identified since the beginning of the
          last refueling outage.
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
          and Alloy 600 Programs.
A.2 Reactor Pressure Vessel Head (RPVH)
A.2 Reactor Pressure Vessel Head (RPVH)
  a) Provide the detailed scope of the planned NDE of the reactor vessel head which identifies the types of NDE methods to be used on each specific part of the vessel head to fulfill commitments made in response to NRC Bulletin 2002-02 and NRC Order EA-03-009. Also, include examination scope expansion criteria  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
and planned expansion sample sizes if relevant conditions are identified (If applicable).  
          identifies the types of NDE methods to be used on each specific part of the
 
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
  - 3 - Enclosure b) A list of the standards and/or requirements that will be used to evaluate indications identified during NDE of the reactor vessel head (e.g., the specific industry or procedural standards which will be used to evaluate potential leakage and/or flaw indications).  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
A.3 Boric Acid Corrosion Control Program (BACCP)
          and planned expansion sample sizes if relevant conditions are identified (If
  a) Copy of the procedures that govern the scope, equipment and implementation of the inspections required to identify boric acid leakage and the procedures for boric acid leakage/corrosion evaluation.  
          applicable).
b) Please provide a list of leaks (including Code class of the components) that have been identified since the last refueling outage and associated corrective action documentation. If during the last cycle, the Unit was shutdown, please provide documentation of containment walkdown inspections performed as part of the BACCP. c) Please provide a copy of the most recent self-assessment performed for the BACCP. A.4 Steam Generator Tube (SGT) Inspections
                                        -2-                                         Enclosure
  a) A detailed schedule of:  
 
i) SGT inspection, data analyses, and repair activities for the upcoming outage (If occurring).  
    b)     A list of the standards and/or requirements that will be used to evaluate
ii) SG secondary side inspection activities for the upcoming outage (If occurring).  
          indications identified during NDE of the reactor vessel head (e.g., the specific
b) Please provide a copy of your SG ISI Inspection Program and Plan. Please include a copy of the Operational Assessment from last outage and a copy of the following documents as they become available:
          industry or procedural standards which will be used to evaluate potential leakage
i) Degradation Assessment ii) Condition Monitoring Assessment  
          and/or flaw indications).
c) If you are planning on modifying your Technical Specifications such that they are consistent with TSTF-449, please provide copies of your correspondence with the NRC regarding deviations from the STS.  
A.3 Boric Acid Corrosion Control Program (BACCP)
d) Copy of SG history documentation given to vendors performing eddy current (ET) testing of the SGs during the upcoming outage.  
    a)     Copy of the procedures that govern the scope, equipment and implementation of
e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy Current Technique Specification Sheets (ETSS). Additionally, please provide a copy of EPRI Appendix H ETSS Qualification Records.  
          the inspections required to identify boric acid leakage and the procedures for
 
          boric acid leakage/corrosion evaluation.
  - 4 - Enclosure f) Identify and quantify any SGT leakage experienced during the previous operating cycle. Also provide documentation identifying which SG was leaking and corrective actions completed or planned for this condition (If applicable).  
    b)     Please provide a list of leaks (including Code class of the components) that have
g) Provide past history of the condition and issues pertaining to the secondary side of the steam generators (including items such as loose parts, fouling, top of tube  
          been identified since the last refueling outage and associated corrective action
sheet condition, crud removal amounts, etc.).  
          documentation. If during the last cycle, the Unit was shutdown, please provide
h) Please provide copies of your most recent self assessments of the SG monitoring, loose parts monitoring, and secondary side water chemistry control programs.  
          documentation of containment walkdown inspections performed as part of the
i) Please also indicate where the primary, secondary, and resolution analyses are scheduled to take place.  
          BACCP.
j) Please provide a summary of the scope of the SGT examinations, including examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the percentage of tubes to be examined. *Do not provide these documents separately if already included in other information requested.   A.5 Metals Reliability (MRP-139) Program Activities
    c)     Please provide a copy of the most recent self-assessment performed for the
  a) A list of, with verification that, the baseline inspections of all applicable Dissimilar Metal Butt Welds (DMBWs) have been completed by December 31, 2007.  
          BACCP.
b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs have been included in the inspection program and that the schedules for the baseline inspections are consistent with the baseline schedules in MRP-139.  
A.4 Steam Generator Tube (SGT) Inspections
c) A list and schedule (examination dates) of all DMBW examinations planned for the upcoming refueling outage. If none are scheduled, then data from previous examinations should be available for review.  
    a)     A detailed schedule of:
d) A list and schedule for any welding to be performed on DMBWs in the upcoming outage. If no welding will be performed then provide records of previous welding on DMBWs and postweld NDE documentation.  
          i)       SGT inspection, data analyses, and repair activities for the upcoming
e) A list and schedule of any stress improvement (SI) activities planned for the upcoming refueling outage. If none are scheduled then have qualification reports for any SIs previously performed.  
                    outage (If occurring).
f) Documentation and description of how the baseline and inservice inspection specifications in MRP-139 are satisfied at your facility. A.6 Additional information related to all ISI activities
          ii)     SG secondary side inspection activities for the upcoming outage (If
  a) A list with a brief description of ISI, BACCP, and SGT inspection related issues (e.g., condition reports) entered into your corrective action program since the beginning of the last refueling outage (for Unit 1). For example, a list based upon
                    occurring).
  - 5 - Enclosure data base searches using key words related to piping or SG tube degradation such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion, boric acid, or errors in piping/SGT examinations.  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
b) Please provide names and phone numbers for the following program leads:  
          include a copy of the Operational Assessment from last outage and a copy of the
ISI contacts (Examination, planning) Containment Exams RPVH Exams Snubbers and Supports Repair and Replacement Program Manager  
          following documents as they become available:
Licensing Contact Site Welding Engineer Boric Acid Corrosion Control Program SG Inspection Activities (site lead and vendor contact)  
          i)       Degradation Assessment
          ii)     Condition Monitoring Assessment
B. Information to be provided onsite to the inspector(s) at the entrance meeting (October 20, 2008):
    c)     If you are planning on modifying your Technical Specifications such that they are
  B.1 ISI / Welding Programs and Schedule Information
          consistent with TSTF-449, please provide copies of your correspondence with
  a) Updated schedules for ISI/NDE activities, including SGT inspections, planned welding activities, and schedule showing contingency repair plans, if available.  
          the NRC regarding deviations from the STS.
b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists provided from section A of this enclosure, please provide copies of the following documentation for each subject weld:  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
i) Weld data sheet (traveler) ii) Weld configuration and system location iii) Applicable Code Edition and Addenda for weldment iv) Applicable Code Edition and Addenda for welding procedures v) Applicable weld procedures (WPS) used to fabricate the welds  
          testing of the SGs during the upcoming outage.
vi) Copies of procedure qualification records (PQRs) supporting the WPS from B.1.b.v vii) Copies of mechanical test reports identified in the PQRs above viii) Copies of the nonconformance reports for the selected welds (If applicable) ix) Radiographs of the selected welds and access to equipment to allow viewing radiographs (If RT was performed) x) Copies of the preservice examination records for the selected welds. xi) Copies of welder performance qualifications records applicable to the selected welds, including documentation that welder maintained proficiency in the applicable welding processes specified in the WPS (at least six months prior to the date of subject work)  
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
 
          copy of EPRI Appendix H ETSS Qualification Records.
  - 6 - Enclosure c) For the ISI related corrective action issues selected by the inspector(s) from section A of this enclosure, provide a copy of the corrective actions and supporting documentation.  
                                        -3-                                         Enclosure
d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems selected by the inspector from section A above, provide a copy of the  
 
examination records, examiner qualification records, and associated corrective action documents.  
    f)     Identify and quantify any SGT leakage experienced during the previous operating
e) A copy of (or ready access to) most current revision of the ISI Program Manual and Plan for the current Interval.
          cycle. Also provide documentation identifying which SG was leaking and
f) For the NDEs selected by the inspector from section A of this enclosure, provide copy of the NDE procedures used to perform the examinations (including calibration and flaw characterization/sizing procedures). For ultrasonic examination procedures qualified in accordance with ASME Code, Section XI, Appendix VIII, provide documentation supporting the procedure qualification (e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          corrective actions completed or planned for this condition (If applicable).
include qualification documentation of the specific equipment to be used (e.g., ultrasonic unit, cables, and transducers including serial numbers) and NDE personnel qualification records.  
    g)     Provide past history of the condition and issues pertaining to the secondary side
B.2 Reactor Pressure Vessel Head (RPVH)
          of the steam generators (including items such as loose parts, fouling, top of tube
  a) Provide the NDE personnel qualification records for the examiners who will perform examinations of the RPVH.
          sheet condition, crud removal amounts, etc.).
b) Provide drawings showing the following (If a visual examination is planned for the upcoming refueling outage):  
    h)     Please provide copies of your most recent self assessments of the SG
i) RPVH and CRDM nozzle configurations ii) RPVH insulation configuration
          monitoring, loose parts monitoring, and secondary side water chemistry control
The drawings listed above should include fabrication drawings for the nozzle attachment welds as applicable.
          programs.
c) Copy of NDE reports from the last RPVH examination.  
    i)     Please also indicate where the primary, secondary, and resolution analyses are
d) Copy of evaluation or calculation demonstrating that the scope of the visual examination of the upper head will meet the 95% minimum coverage required by NRC Order EA-03-009 (If a visual examination is planned for the upcoming refueling outage).  
          scheduled to take place.
e) Provide a copy of the procedures that will be used to identify the source of any boric acid deposits identified on the RPVH. If no explicit procedures exist which govern this activity, provide a description of the process to be followed including personnel responsibilities and expectations.
    j)     Please provide a summary of the scope of the SGT examinations, including
 
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
  - 7 - Enclosure f) Provide a copy of the updated calculation of effective degradation years (EDY) for the RPVH susceptibility ranking.  
          percentage of tubes to be examined. *Do not provide these documents
g) Provide copy of the vendor qualification report(s) that demonstrates the detection capability of the NDE equipment used for the RPVH examinations. Also, identify any changes in equipment configurations used for the RPVH examinations which  
          separately if already included in other information requested.
differ from that used in the vendor qualification report(s).  
A.5 Metals Reliability (MRP-139) Program Activities
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     A list of, with verification that, the baseline inspections of all applicable Dissimilar
  a) Please provide boric acid walkdown inspection results, an updated list of boric acid leaks identified so far this outage, associated corrective action documentation, and overall status of planned boric acid inspections.  
          Metal Butt Welds (DMBWs) have been completed by December 31, 2007.
b) Please provide any engineering evaluations completed for boric acid leaks identified since the end of the last refueling outage. Please include a status of corrective actions to repair and/or clean these boric acid leaks. Please identify specifically which known leaks, if any, have remained in service or will remain in  
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
service as active leaks.
          have been included in the inspection program and that the schedules for the
B.4 Steam Generator Tube (SGT) Inspections
          baseline inspections are consistent with the baseline schedules in MRP-139.
  a) Copies of the Examination Technique Specification Sheets (ETSS) and associated justification for any revisions.  
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
b) Copy of the guidance to be followed if a loose part or foreign material is identified in the SGs.  
          the upcoming refueling outage. If none are scheduled, then data from previous
c) Please provide a copy of the ET procedures used to perform the SGT inspections (specifically calibration and flaw characterization/sizing procedures, etc.). Also include documentation for the specific equipment to be used.  
          examinations should be available for review.
d) Please provide copies of your responses to NRC and industry operating experience communications such as Generic Letters, Information Notices, etc. (as applicable to SGT inspections) *Do not provide these documents separately if already included in other information requested such as the degradation assessment.  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
e) List of corrective action documents generated by the vendor and/or site with respect to SG inspection activities.  
          outage. If no welding will be performed then provide records of previous welding
          on DMBWs and postweld NDE documentation.
    e)     A list and schedule of any stress improvement (SI) activities planned for the
          upcoming refueling outage. If none are scheduled then have qualification reports
          for any SIs previously performed.
    f)     Documentation and description of how the baseline and inservice inspection
          specifications in MRP-139 are satisfied at your facility.
A.6 Additional information related to all ISI activities
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage (for Unit 1). For example, a list based upon
                                          -4-                                           Enclosure
 
          data base searches using key words related to piping or SG tube degradation
          such as: ISI, ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust,
          corrosion, boric acid, or errors in piping/SGT examinations.
    b)     Please provide names and phone numbers for the following program leads:
          ISI contacts (Examination, planning)
          Containment Exams
          RPVH Exams
          Snubbers and Supports
          Repair and Replacement Program Manager
          Licensing Contact
          Site Welding Engineer
          Boric Acid Corrosion Control Program
          SG Inspection Activities (site lead and vendor contact)
B. Information to be provided onsite to the inspector(s) at the entrance meeting
    (October 20, 2008):
B.1 ISI / Welding Programs and Schedule Information
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
          welding activities, and schedule showing contingency repair plans, if available.
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
          provided from section A of this enclosure, please provide copies of the following
          documentation for each subject weld:
          i)     Weld data sheet (traveler)
          ii)     Weld configuration and system location
          iii)   Applicable Code Edition and Addenda for weldment
          iv)     Applicable Code Edition and Addenda for welding procedures
          v)     Applicable weld procedures (WPS) used to fabricate the welds
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
                  from B.1.b.v
          vii)   Copies of mechanical test reports identified in the PQRs above
          viii)   Copies of the nonconformance reports for the selected welds (If
                  applicable)
          ix)     Radiographs of the selected welds and access to equipment to allow
                  viewing radiographs (If RT was performed)
          x)     Copies of the preservice examination records for the selected welds.
          xi)     Copies of welder performance qualifications records applicable to the
                  selected welds, including documentation that welder maintained
                  proficiency in the applicable welding processes specified in the WPS (at
                  least six months prior to the date of subject work)
          xii)   Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
                                        -5-                                       Enclosure
 
    c)   For the ISI related corrective action issues selected by the inspector(s) from
          section A of this enclosure, provide a copy of the corrective actions and
          supporting documentation.
    d)   For the NDE reports with relevant conditions on Code Class 1 & 2 systems
          selected by the inspector from section A above, provide a copy of the
          examination records, examiner qualification records, and associated corrective
          action documents.
    e)   A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
    f)   For the NDEs selected by the inspector from section A of this enclosure, provide
          copy of the NDE procedures used to perform the examinations (including
          calibration and flaw characterization/sizing procedures). For ultrasonic
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
          include qualification documentation of the specific equipment to be used (e.g.,
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
          personnel qualification records.
B.2 Reactor Pressure Vessel Head (RPVH)
    a)   Provide the NDE personnel qualification records for the examiners who will
          perform examinations of the RPVH.
    b)   Provide drawings showing the following (If a visual examination is planned for the
          upcoming refueling outage):
          i)       RPVH and CRDM nozzle configurations
          ii)     RPVH insulation configuration
          The drawings listed above should include fabrication drawings for the nozzle
          attachment welds as applicable.
    c)   Copy of NDE reports from the last RPVH examination.
    d)   Copy of evaluation or calculation demonstrating that the scope of the visual
          examination of the upper head will meet the 95% minimum coverage required by
          NRC Order EA-03-009 (If a visual examination is planned for the upcoming
          refueling outage).
    e)   Provide a copy of the procedures that will be used to identify the source of any
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
                                        -6-                                         Enclosure
 
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
          for the RPVH susceptibility ranking.
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
          any changes in equipment configurations used for the RPVH examinations which
          differ from that used in the vendor qualification report(s).
B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
    b)     Please provide any engineering evaluations completed for boric acid leaks
          identified since the end of the last refueling outage. Please include a status of
          corrective actions to repair and/or clean these boric acid leaks. Please identify
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
B.4 Steam Generator Tube (SGT) Inspections
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
          associated justification for any revisions.
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
    c)     Please provide a copy of the ET procedures used to perform the SGT
          inspections (specifically calibration and flaw characterization/sizing procedures,
          etc.). Also include documentation for the specific equipment to be used.
    d)     Please provide copies of your responses to NRC and industry operating
          experience communications such as Generic Letters, Information Notices, etc.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
          assessment.
    e)     List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
B.5 Codes and Standards
B.5 Codes and Standards
  a) Ready access to (i.e., copies provided to the inspector(s) for use during the inspection at the onsite inspection location, or room number and location where  
    a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
available):  
          inspection at the onsite inspection location, or room number and location where
 
          available):
  - 8 - Enclosure i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the inservice inspection program and the repair/replacement program.
                                        -7-                                         Enclosure
ii) EPRI and industry standards referenced in the procedures used to perform the SGT eddy current examination.  
 
              i)     Applicable Editions of the ASME Code (Sections V, IX and XI) for the
Inspector Contact Information:  
                      inservice inspection program and the repair/replacement program.
Ronald A. Kopriva   James Adams, PhD.   Senior Reactor Inspector Reactor Inspector  
              ii)   EPRI and industry standards referenced in the procedures used to
817-860-8104   817-860-8294 Ron.Kopriva@nrc.gov
                      perform the SGT eddy current examination.
  James.Adams@nrc.gov     Mailing Address: US NRC Region IV Attn: R. Kopriva  
Inspector Contact Information:
612 East Lamar Blvd, Suite 400 Arlington, TX 76011
Ronald A. Kopriva                   James Adams, PhD.
Senior Reactor Inspector             Reactor Inspector
817-860-8104                         817-860-8294
Ron.Kopriva@nrc.gov                 James.Adams@nrc.gov
Mailing Address:
US NRC Region IV
Attn: R. Kopriva
612 East Lamar Blvd, Suite 400
Arlington, TX 76011
                                          -8-                                      Enclosure
}}
}}

Latest revision as of 12:41, 14 November 2019

IR 05000483-08-005, on 10/20/2008 - 10/31/2008, for Callaway Plant, Request for Information
ML082670988
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/23/2008
From: Russ Bywater
Region 4 Engineering Branch 1
To: Heflin A
Union Electric Co
References
IR-08-005
Download: ML082670988 (13)


See also: IR 05000483/2008005

Text

UNITE D S TATES

NUC LEAR RE GULATOR Y C OMMIS SI ON

R EG I O N I V

612 EAST LAMAR BLVD , SU ITE 400

AR L IN GTON , TEXAS 7 6 011 - 4125

September 23, 2008

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF INSPECTION (NRC INSPECTION

REPORT 05000483/2008005) AND REQUEST FOR INFORMATION

Dear Mr. Heflin:

From October 20 to 31, 2008, reactor inspectors from the U. S. Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at Callaway

Plant, using NRC Inspection Procedure 71111.08 and Temporary Instruction 2515/172,

Reactor Coolant System Dissimilar Metal Butt Welds. Experience has shown that this

inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize

the impact to your onsite resources and to ensure a productive inspection, we have enclosed a

request for documents needed for this inspection. These documents have been divided into two

groups. The first group (Section A of the enclosure) identifies information to be provided prior to

the inspection to ensure that the inspectors are adequately prepared. The second group

(Section B of the enclosure) identifies the information the inspectors will need upon arrival at the

site. It is important that all of these documents are up to date and complete in order to minimize

the number of additional documents requested during the preparation and/or the onsite portions

of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Steve Petzel of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector R. Kopriva at (817) 860-8104 (Ron.Kopriva@nrc.gov ).

Union Electric Company -2-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Russell L. Bywater, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosure:

Inservice Inspection Document Request

cc w/enclosure:

John ONeill, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N. Street, N.W.

Washington, DC 20037

Mr. Scott A. Maglio, Assistant Manager

Regulatory Affairs

AmerenUE

P.O. Box 620

Fulton, MO 65251

Mr. Tom Elwood, Supervising Engineer

Regulatory Affairs and Licensing

AmerenUE

P.O. Box 620

Fulton, MO 65251

Missouri Public Service Commission

Governor Office Building

200 Madison Street

P.O. Box 360

Jefferson City, MO 65102-0360

Union Electric Company -3-

Mr. H. Floyd Gilzow

Deputy Director for Policy

Department of Natural Resources

P. O. Box 176

Jefferson City, MO 65102-0176

Mr. Rick A. Muench, President and

Chief Executive officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Kathleen Logan Smith, Executive Director and

Kay Drey, Representative, Board of Directors

Missouri Coalition for the Environment

6267 Delmar Boulevard, Suite 2E

St. Louis City, MO 63130

Mr. Lee Fritz, Presiding Commissioner

Callaway County Courthouse

10 East Fifth Street

Fulton, MO 65251

Mr. Les H. Kanuckel, Manager

Quality Assurance

AmerenUE

P.O. Box 620

Fulton, MO 65251

Director, Missouri State Emergency

Management Agency

P.O. Box 116

Jefferson City, MO 65102-0116

Mr. Scott Clardy, Director

Section for Environmental Public Health

Missouri Department of Health and

Senior Services

930 Wildwood Drive

P.O. Box 570

Jefferson City, MO 65102-0570

Mr. Luke Graessle, Manager

Regulatory Affairs

AmerenUE

P.O. Box 620

Fulton, MO 65251

Union Electric Company -4-

Mr. Tom Elwood, Supervising Engineer

Regulatory Affairs and Licensing

AmerenUE

P.O. Box 620

Fulton, MO 65251

Certrec Corporation

4200 South Hulen, Suite 422

Fort Worth, TX 76109

Mr. Keith G. Henke, Planner II

Division of Community and Public Health

Office of Emergency Coordination

Missouri Department of Health and

Senior Services

930 Wildwood Drive

P.O. Box 570

Jefferson City, MO 65102

Technical Services Branch Chief

FEMA Region VII

2323 Grand Boulevard, Suite 900

Kansas City, MO 64108-2670

Union Electric Company -5-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (David.Dumbacher@nrc.gov)

Resident Inspector (Jeremy.Groom@nrc.gov )

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

CWY Site Secretary (Dawn.Yancey@nrc.gov )

SUNSI Review Completed: __RLB_ ADAMS: Yes Initials: _RLB__

Publicly Available Non-Sensitive

R:/REACTORS/CW 2008005 request for info - RAK ML082670988

EB1 EB1 C: EB1

RAKopriva JPAdams RLBywater

/RA/ /RA/ /RA/

9/17/08 9/17/08 9/23/08

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates: October 20 - 31, 2008

Inspection Procedures: IP 71111.08 Inservice Inspection (ISI) Activities

TI 2515/172 Reactor Coolant System Dissimilar Metal Butt

Welds

Inspectors: Ron Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)

James Adams, PhD., Reactor Inspector

A. Information Requested for the In-Office Preparation Week

The following information (Section A of this enclosure) should be sent to the Region IV office in

hard copy or electronic format (ims.certrec.com preferred), in care of R. Kopriva, by October 7,

2008, to facilitate the selection of specific items that will be reviewed during the onsite

inspection week. The inspector will select specific items from the information requested below

and then request from your staff additional documents needed during the onsite inspection

week (Section B of this enclosure). We ask that the specific items selected from the lists be

available and ready for review on the first day of inspection. *Please provide requested

documentation electronically if possible. If requested documents are large and only hard copy

formats are available, please inform the inspector(s), and provide subject documentation during

the first day of the onsite inspection. If you have any questions regarding this information

request, please call the inspector as soon as possible.

A.1 ISI/Welding Programs and Schedule Information

a) A detailed schedule (including preliminary dates) of:

i) Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information).

ii) Reactor pressure vessel head (RPVH) examinations planned for the

upcoming refueling outage.

iii) Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope (If applicable).

-1- Enclosure

iv) Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

v) Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b) A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c) A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrant,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d) A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated in this refueling outage.

e) If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f) Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g) A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h) Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified (If

applicable).

-2- Enclosure

b) A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

A.3 Boric Acid Corrosion Control Program (BACCP)

a) Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b) Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c) Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4 Steam Generator Tube (SGT) Inspections

a) A detailed schedule of:

i) SGT inspection, data analyses, and repair activities for the upcoming

outage (If occurring).

ii) SG secondary side inspection activities for the upcoming outage (If

occurring).

b) Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i) Degradation Assessment

ii) Condition Monitoring Assessment

c) If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d) Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e) Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

-3- Enclosure

f) Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition (If applicable).

g) Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.).

h) Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i) Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j) Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5 Metals Reliability (MRP-139) Program Activities

a) A list of, with verification that, the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by December 31, 2007.

b) Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c) A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d) A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then provide records of previous welding

on DMBWs and postweld NDE documentation.

e) A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f) Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

A.6 Additional information related to all ISI activities

a) A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage (for Unit 1). For example, a list based upon

-4- Enclosure

data base searches using key words related to piping or SG tube degradation

such as: ISI, ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust,

corrosion, boric acid, or errors in piping/SGT examinations.

b) Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B. Information to be provided onsite to the inspector(s) at the entrance meeting

(October 20, 2008):

B.1 ISI / Welding Programs and Schedule Information

a) Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b) For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i) Weld data sheet (traveler)

ii) Weld configuration and system location

iii) Applicable Code Edition and Addenda for weldment

iv) Applicable Code Edition and Addenda for welding procedures

v) Applicable weld procedures (WPS) used to fabricate the welds

vi) Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii) Copies of mechanical test reports identified in the PQRs above

viii) Copies of the nonconformance reports for the selected welds (If

applicable)

ix) Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x) Copies of the preservice examination records for the selected welds.

xi) Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii) Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

-5- Enclosure

c) For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d) For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

examination records, examiner qualification records, and associated corrective

action documents.

e) A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f) For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2 Reactor Pressure Vessel Head (RPVH)

a) Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b) Provide drawings showing the following (If a visual examination is planned for the

upcoming refueling outage):

i) RPVH and CRDM nozzle configurations

ii) RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle

attachment welds as applicable.

c) Copy of NDE reports from the last RPVH examination.

d) Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95% minimum coverage required by

NRC Order EA-03-009 (If a visual examination is planned for the upcoming

refueling outage).

e) Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

-6- Enclosure

f) Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g) Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

B.3 Boric Acid Corrosion Control Program (BACCP)

a) Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b) Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4 Steam Generator Tube (SGT) Inspections

a) Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b) Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c) Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d) Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e) List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5 Codes and Standards

a) Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

-7- Enclosure

i) Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii) EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

Inspector Contact Information:

Ronald A. Kopriva James Adams, PhD.

Senior Reactor Inspector Reactor Inspector

817-860-8104 817-860-8294

Ron.Kopriva@nrc.gov James.Adams@nrc.gov

Mailing Address:

US NRC Region IV

Attn: R. Kopriva

612 East Lamar Blvd, Suite 400

Arlington, TX 76011

-8- Enclosure