{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125September 1, 2009 John T. Conway, Senior Vice President &  
{{#Wiki_filter:UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 September 1, 2009 John T. Conway, Senior Vice President &
 
Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424
Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3  
 
Mail Code 104/6/601 Avila Beach, CA 93424  


==SUBJECT:==
==SUBJECT:==
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DIABLO CANYON POWER PLANT  
MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DIABLO CANYON POWER PLANT


==Dear Mr. Conway:==
==Dear Mr. Conway:==


On August 4, 2009, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.  
On August 4, 2009, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only--Security Information will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Diablo Canyon Power Plant, Units 1 and 2, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). In addition to baseline inspections, we also plan on implementing Inspection Procedure 71007, Reactor Vessel Head Replacement Inspection, for Unit 2.
In the 2008 annual assessment letter, dated March 4, 2009, the NRC identified a crosscutting theme associated with the corrective action program component of the problem identification and resolution area related to the failure of site personnel to thoroughly evaluate problems
[P.1.(c)]. At the time, the NRC did not identify a substantive crosscutting issue because this theme represented a recent performance trend. Once identified, you placed this issue into your corrective action program and began developing actions to address this issue.
During the current 12-month assessment period, the staff identified more than four Green findings with documented crosscutting aspects in the area of problem identification and resolution associated with the same theme related to the failure of site personnel to thoroughly evaluate problems [P.1.(c)]. Specifically, seven findings with this crosscutting theme were identified during this current assessment period. Although some of these findings were documented in the last quarter of the assessment period, only one was related to an inadequate evaluation that originated in the last quarter of the assessment period. Since the number of


This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Pacific Gas and Electric Company           findings with this crosscutting theme continued to decrease during the assessment period, it appears that the corrective actions you have implemented have begun to show some improvement. As such, we have determined that a substantive crosscutting issue does not exist at this time. We will continue to monitor the progress of your corrective action through the baseline inspection program over the assessment period.
Plant performance for the most recent quarter at Diablo Canyon Power Plant, Units 1 and 2, was within the Licensee Response column of the NRC
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We are also evaluating potential changes to the inspection program in the radiation safety cornerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.
=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). In addition to baseline inspections, we also plan on implementing Inspection Procedure 71007, "Reactor Vessel Head Replacement Inspection," for Unit 2.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.
In the 2008 annual assessment letter, dated March 4, 2009, the NRC identified a crosscutting theme associated with the corrective action program component of the problem identification and resolution area related to the failure of site personnel to thoroughly evaluate problems [P.1.(c)]. At the time, the NRC did not identify a substantive crosscutting issue because this theme represented a recent performance trend. Once identified, you placed this issue into your corrective action program and began developing actions to address this issue.
Sincerely,
During the current 12-month assessment period, the staff identified more than four Green findings with documented crosscutting aspects in the area of problem identification and resolution associated with the same theme related to the failure of site personnel to thoroughly
                                                /RA/
 
Vincent Gaddy, Chief Reactor Projects Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80; DPR-82
evaluate problems [P.1.(c)]. Specifically, seven findings with this crosscutting theme were identified during this current assessment period. Although some of these findings were documented in the last quarter of the assessment period, only one was related to an inadequate evaluation that originated in the last quarter of the assessment period. Since the number of Pacific Gas and Electric Company  
 
findings with this crosscutting theme continued to decrease during the assessment period, it appears that the corrective actions you have implemented have begun to show some improvement. As such, we have determined that a substantive crosscutting issue does not exist at this time. We will continue to monitor the progress of your corrective action through the baseline inspection program over the assessment period.  
 
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We are also evaluating potential changes to the inspection program in the radiation safety co rnerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.  
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.  
 
Sincerely,
        /RA/ Vincent Gaddy, Chief Reactor Projects Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80; DPR-82  


==Enclosure:==
==Enclosure:==


Diablo Canyon Inspection/Activity Plan  
Diablo Canyon Inspection/Activity Plan


Pacific Gas and Electric Company  
Pacific Gas and Electric Company       cc w/
 
cc w/


==Enclosure:==
==Enclosure:==


Sierra Club San Lucia Chapter  
Sierra Club San Lucia Chapter ATTN: Andrew Christie                     Chief, Technological Hazards Branch P.O. Box 15755                             FEMA Region IX San Luis Obispo, CA 93406                 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Nancy Culver San Luis Obispo                           City Editor Mothers for Peace                         The Tribune P.O. Box 164                               3825 South Higuera Street Pismo Beach, CA 93448                     P.O. Box 112 San Luis Obispo, CA 93406-0112 Chairman San Luis Obispo County                     James D. Boyd, Commissioner Board of Supervisors                     California Energy Commission 1055 Monterey Street, Suite D430           1516 Ninth Street (MS 31)
 
San Luis Obispo, CA 93408                 Sacramento, CA 95814 Truman Burns\Robert Kinosian               James R. Becker, Site Vice President &
ATTN: Andrew Christie P.O. Box 15755  
California Public Utilities Commission     Station Director 505 Van Ness Ave., Rm. 4102               Diablo Canyon Power Plant San Francisco, CA 94102                   P.O. Box 56 Avila Beach, CA 93424 Diablo Canyon Independent Safety Committee                                  Jennifer Tang Attn: Robert R. Wellington, Esq.          Field Representative Legal Counsel                              United States Senator Barbara Boxer 857 Cass Street, Suite D                  1700 Montgomery Street, Suite 240 Monterey, CA 93940                        San Francisco, CA 94111 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
 
Sacramento, CA 95899-7414
San Luis Obispo, CA 93406  
 
Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164  
 
Pismo Beach, CA 93448 Chairman San Luis Obispo County
 
Board of Supervisors  
 
1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408  
 
Truman Burns\Robert Kinosian California Public Utilities Commission  
 
505 Van Ness Ave., Rm. 4102  
 
San Francisco, CA 94102 Diablo Canyon Independent Safety  


Committee Attn:  Robert R. Wellington, Esq.
Pacific Gas and Electric Company           Electronic distribution by RIV:
 
Legal Counsel 857 Cass Street, Suite D Monterey, CA  93940
 
Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA  95899-7414 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200
 
Oakland, CA  94607-4052 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA  93406-0112
 
James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 31)
Sacramento, CA  95814
 
James R. Becker, Site Vice President &
 
Station Director
 
Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA  93424
 
Jennifer Tang
 
Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA  94111
 
Pacific Gas and Electric Company  
 
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.goV)
DRP Deputy Director (Anton.Vegel@nrc.goV)
DRP Director (Roy.Caniano@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov)
DRP Director (Roy.Caniano@nrc.gov)
Branch Chief, DRP (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP (Rick.Deese@nrc.gov) Senior Resident Inspector (Michael.Peck@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov) Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)
Branch Chief, DRP (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP (Rick.Deese@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Resident Inspector (Tony.Brown@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lucy.Owen@nrc.gov) DRA Secretary (Judy.Kilcrease@nrc.gov) Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
RA Secretary (Lucy.Owen@nrc.gov)
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)  
DRA Secretary (Judy.Kilcrease@nrc.gov)
 
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)  
Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)
 
Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)  
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
 
Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)
Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov) OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov) OEDO, TRPS (Tamara.Bloomer@nrc.gov)
OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)
OEDO, TRPS (Tamara.Bloomer@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Director, DORL, NRR (Joseph Giitter@nrc.gov)
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov) Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov) NRR Project Manager (Alan.Wang@nrc.gov)  
Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)
 
Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)
NRR Project Manager (Alan.Wang@nrc.gov)
RidsNrrDirslpab (Resource@nrc.gov)
RidsNrrDirslpab (Resource@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROPreports  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROPreports File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\DC.doc SUNSI Rev Compl. 7Yes No              ADAMS      7Yes No        Reviewer Initials    VGG Publicly Avail          7Yes No      Sensitive    Yes 7No      Sens. Type Initials  VGG RIV:SPE/DRP/PBB C:DRP/PBB                D:DRS          CLDRO/PBB RWDeese                VGGaddy          RJCaniano      VGGaddy
/RA/                    /RA/              /RA/            /RA/
8/19/09                8/19/09            8/20/09        8/27/09 OFFICIAL RECORD COPY                                T=Telephone      E=E-mail      F=Fax


File located:  R:\EOC and Midcycle\Midcycle Assessment Letters\2009\DC.doc SUNSI Rev Compl. Yes  No ADAMS  Yes  No Reviewer Initials VGG Publicly Avail  Yes  No Sensitive  Yes No Sens. Type Initials VGGRIV:SPE/DRP/PBB C:DRP/PBB D:DRS CLDRO/PBB RWDeese VGGaddy RJCaniano VGGaddy  /RA/ /RA/ /RA/ /RA/  8/19/09 8/19/09 8/20/09 8/27/09  OFFICIAL RECORD COPY    T=Telephone          E=E-mail        F=Fax Inspection / Activity Plan Page 1 of 2 08/17/2009 14:25:29 Report 22 09/01/2009
Page 1 of 2                                                                           Diablo Canyon 08/17/2009     14:25:29                                                         Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                         No. of Staff Number        Start     End     Inspection Activity                                                           Title on Site PBB-RVH2     - UNIT 2 REACTOR VESSEL HEAD REPLACEMENT                                     2 2       05/10/2009   12/31/2009   IP 71007                Reactor Vessel Head Replacement Inspection EB1-08       - U2 INSERVICE INSPECTION                                                     3 2       10/12/2009  10/23/2009   IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds 2      10/12/2009   10/23/2009  IP 7111108P            Inservice Inspection Activities - PWR EXAM          - INITIAL EXAM                                                                6 1          11/30/2009   12/04/2009     X02435              INITIAL EXAM- DC (4/31/2010) 2      11/30/2009   12/04/2009     X02436              INITIAL EXAM- DC 2 (3/31/2010) 2      01/11/2010  01/22/2010      X02435              INITIAL EXAM- DC (4/31/2010) 1          01/11/2010   01/22/2010     X02436              INITIAL EXAM- DC 2 (3/31/2010)
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Diablo Canyon PBB-RVH2-UNIT 2 REACTOR VESSEL HEAD REPLACEMENT 2 2   IP Reactor Vessel Head Replacement Inspection 71007 05/10/2009 12/31/2009 EB1-08-U2 INSERVICE INSPECTION 3 2  IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/12/2009 10/23/2009 2   IP Inservice Inspection Activities - PWR 7111108P 10/12/2009 10/23/2009 EXAM-INITIAL EXAM 6 1    INITIAL EXAM- DC (4/31/2010)
RP-ORS5       - OCCUPATIONAL RADIATION SAFETY - ALARA                                       1 1, 2       12/14/2009  12/18/2009   IP 7112101              Access Control to Radiologically Significant Areas 1, 2      12/14/2009   12/18/2009  IP 7112102              ALARA Planning and Controls 1, 2      12/14/2009   12/18/2009  IP 71151                Performance Indicator Verification EB1-21       - CDBI                                                                       6 1, 2       02/08/2010   02/12/2010  IP 7111121              Component Design Bases Inspection 1, 2      02/22/2010   03/05/2010   IP 7111121              Component Design Bases Inspection PSB2-52B     - BIENNIAL PI&R                                                               4 1, 2       03/22/2010   03/26/2010  IP 71152B              Identification and Resolution of Problems 1, 2      04/05/2010   04/09/2010   IP 71152B              Identification and Resolution of Problems EXAM         - INITIAL EXAM                                                               3 1         04/12/2010   04/16/2010     X02435              INITIAL EXAM- DC (4/31/2010) 1          05/17/2010   05/21/2010     X02435              INITIAL EXAM- DC (4/31/2010)
X02435 11/30/2009 12/04/2009 INITIAL EXAM- DC 2 (3/31/2010)
RP-ORS2       - OCCUPATIONAL RADIATION SAFETY-ALARA                                         1 1, 2       06/14/2010  06/18/2010   IP 7112101              Access Control to Radiologically Significant Areas 1, 2      06/14/2010   06/18/2010  IP 7112102              ALARA Planning and Controls 1, 2      06/14/2010   06/18/2010  IP 71151                Performance Indicator Verification EP-1         - BIENNIAL EP EXERCISE INSPECTION                                             3 1, 2       08/09/2010  08/13/2010   IP 7111401              Exercise Evaluation 1, 2      08/09/2010   08/13/2010  IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2      08/09/2010   08/13/2010  IP 71151-EP01          Drill/Exercise Performance 1, 2      08/09/2010   08/13/2010  IP 71151-EP02          ERO Drill Participation 1, 2      08/09/2010   08/13/2010  IP 71151-EP03          Alert & Notification System RP-ORS1       - OCCUPATIONAL RADIATION SAFETY                                               1 1, 2       10/04/2010   10/08/2010   IP 7112101              Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.
X02436 11/30/2009 12/04/2009 2  INITIAL EXAM- DC (4/31/2010)
X02435 01/11/2010 01/22/2010 1    INITIAL EXAM- DC 2 (3/31/2010)
X02436 01/11/2010 01/22/2010 RP-ORS5-OCCUPATIONAL RADIATION SAFETY - ALARA 1 1, 2  IP A ccess Control to Radiologically Significant Areas 7112101 12/14/2009 12/18/2009 1, 2   IP A LARA Planning and Controls 7112102 12/14/2009 12/18/2009 1, 2   IP Performance Indicator Verification 71151 12/14/2009 12/18/2009 EB1-21-CDBI 6 1, 2   IP Component Design Bases Inspection 7111121 02/08/2010 02/12/2010 1, 2   IP Component Design Bases Inspection 7111121 02/22/2010 03/05/2010 PSB2-52B-BIENNIAL PI&R 4 1, 2   IP Identification and Resolution of Problems 71152B 03/22/2010 03/26/2010 1, 2   IP Identification and Resolution of Problems 71152B 04/05/2010 04/09/2010 EXAM-INITIAL EXAM 3 1     INITIAL EXAM- DC (4/31/2010)
X02435 04/12/2010 04/16/2010 1    INITIAL EXAM- DC (4/31/2010)
X02435 05/17/2010 05/21/2010 RP-ORS2-OCCUPATIONAL RADIATION SAFETY-ALARA 1 1, 2  IP A ccess Control to Radiologically Significant Areas 7112101 06/14/2010 06/18/2010 1, 2   IP A LARA Planning and Controls 7112102 06/14/2010 06/18/2010 1, 2   IP Performance Indicator Verification 71151 06/14/2010 06/18/2010 EP-1-BIENNIAL EP EXERCISE INSPECTION 3 1, 2  IP Exercise Evaluation 7111401 08/09/2010 08/13/2010 1, 2   IP Emergency Action Level and Emergency Plan Changes 7111404 08/09/2010 08/13/2010 1, 2   IP Drill/Exercise Performance 71151-EP01 08/09/2010 08/13/2010 1, 2   IP ERO Drill Participation 71151-EP02 08/09/2010 08/13/2010 1, 2   IP A lert & Notification System 71151-EP03 08/09/2010 08/13/2010 RP-ORS1-OCCUPATIONAL RADIATION SAFETY 1 1, 2   IP A ccess Control to Radiologically Significant Areas 7112101 10/04/2010 10/08/2010 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 08/17/2009 14:25:29 Report 22 09/01/2009
 
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Diablo Canyon RP-ORS1-OCCUPATIONAL RADIATION SAFETY 1 1, 2  IP A LARA Planning and Controls 7112102 10/04/2010 10/08/2010 1, 2   IP Occupational Exposure Control Effectiveness 71151-OR01 10/04/2010 10/08/2010 1, 2   IP RETS/ODCM Radiological Effluent 71151-PR01 10/04/2010 10/08/2010 EB1-08P-INSERVICE INSPECTION - U1 3 1     IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 10/12/2010 11/05/2010 1    IP Inservice Inspection Activities - PWR 7111108P 10/12/2010 11/05/2010 EB2-07T-TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2   IP Heat Sink Performance 7111107T 12/06/2010 12/10/2010 RP TEAM-RADIATION SAFETY TEAM INSPECTION 4 1, 2  IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 12/06/2010 12/10/2010 1, 2   IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 7112201 12/06/2010 12/10/2010 1, 2   IP Radioactive Material Processing and Transportation 7112202 12/06/2010 12/10/2010 1, 2   IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 12/06/2010 12/10/2010 1, 2   IP Material Control and Accounting (MC&A) 7113011 12/06/2010 12/10/2010 This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                           Diablo Canyon 08/17/2009     14:25:29                                                         Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                             No. of Staff Number        Start     End     Inspection Activity                                                             Title                                   on Site RP-ORS1       - OCCUPATIONAL RADIATION SAFETY                                                                                   1 1, 2       10/04/2010  10/08/2010   IP 7112102              ALARA Planning and Controls 1, 2      10/04/2010   10/08/2010  IP 71151-OR01          Occupational Exposure Control Effectiveness 1, 2      10/04/2010   10/08/2010  IP 71151-PR01          RETS/ODCM Radiological Effluent EB1-08P       - INSERVICE INSPECTION - U1                                                                                       3 1         10/12/2010  11/05/2010  IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds 1          10/12/2010   11/05/2010   IP 7111108P            Inservice Inspection Activities - PWR EB2-07T       - TRIENNIAL HEAT SINK PERFORMANCE                                                                                 1 1, 2       12/06/2010   12/10/2010   IP 7111107T            Heat Sink Performance RP TEAM       - RADIATION SAFETY TEAM INSPECTION                                                                               4 1, 2       12/06/2010  12/10/2010   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1, 2      12/06/2010   12/10/2010  IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2      12/06/2010   12/10/2010  IP 7112202              Radioactive Material Processing and Transportation 1, 2      12/06/2010   12/10/2010  IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2      12/06/2010   12/10/2010  IP 7113011              Material Control and Accounting (MC&A)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Revision as of 02:52, 14 November 2019

09/01/2009 Diablo Canyon 2009 Midcycle Assessment
ML092400137
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/01/2009
From: Vincent Gaddy
NRC/RGN-IV/DRP/RPB-B
To: Conway J
Pacific Gas & Electric Co
References
Download: ML092400137 (6)


Text

UNITED STATES NU C LE AR RE G ULATO RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU ITE 400 AR LIN GTON , TEXAS 76011-4125 September 1, 2009 John T. Conway, Senior Vice President &

Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, CA 93424

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - DIABLO CANYON POWER PLANT

Dear Mr. Conway:

On August 4, 2009, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as Official Use Only--Security Information will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Diablo Canyon Power Plant, Units 1 and 2, was within the Licensee Response column of the NRC=s Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). In addition to baseline inspections, we also plan on implementing Inspection Procedure 71007, Reactor Vessel Head Replacement Inspection, for Unit 2.

In the 2008 annual assessment letter, dated March 4, 2009, the NRC identified a crosscutting theme associated with the corrective action program component of the problem identification and resolution area related to the failure of site personnel to thoroughly evaluate problems

[P.1.(c)]. At the time, the NRC did not identify a substantive crosscutting issue because this theme represented a recent performance trend. Once identified, you placed this issue into your corrective action program and began developing actions to address this issue.

During the current 12-month assessment period, the staff identified more than four Green findings with documented crosscutting aspects in the area of problem identification and resolution associated with the same theme related to the failure of site personnel to thoroughly evaluate problems [P.1.(c)]. Specifically, seven findings with this crosscutting theme were identified during this current assessment period. Although some of these findings were documented in the last quarter of the assessment period, only one was related to an inadequate evaluation that originated in the last quarter of the assessment period. Since the number of

Pacific Gas and Electric Company findings with this crosscutting theme continued to decrease during the assessment period, it appears that the corrective actions you have implemented have begun to show some improvement. As such, we have determined that a substantive crosscutting issue does not exist at this time. We will continue to monitor the progress of your corrective action through the baseline inspection program over the assessment period.

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through December 31, 2010. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review. We are also evaluating potential changes to the inspection program in the radiation safety cornerstone. Consequently, some specific inspection procedures and the inspection schedule may be revised for 2010.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Vincent Gaddy, Chief Reactor Projects Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80; DPR-82

Enclosure:

Diablo Canyon Inspection/Activity Plan

Pacific Gas and Electric Company cc w/

Enclosure:

Sierra Club San Lucia Chapter ATTN: Andrew Christie Chief, Technological Hazards Branch P.O. Box 15755 FEMA Region IX San Luis Obispo, CA 93406 1111 Broadway, Suite 1200 Oakland, CA 94607-4052 Nancy Culver San Luis Obispo City Editor Mothers for Peace The Tribune P.O. Box 164 3825 South Higuera Street Pismo Beach, CA 93448 P.O. Box 112 San Luis Obispo, CA 93406-0112 Chairman San Luis Obispo County James D. Boyd, Commissioner Board of Supervisors California Energy Commission 1055 Monterey Street, Suite D430 1516 Ninth Street (MS 31)

San Luis Obispo, CA 93408 Sacramento, CA 95814 Truman Burns\Robert Kinosian James R. Becker, Site Vice President &

California Public Utilities Commission Station Director 505 Van Ness Ave., Rm. 4102 Diablo Canyon Power Plant San Francisco, CA 94102 P.O. Box 56 Avila Beach, CA 93424 Diablo Canyon Independent Safety Committee Jennifer Tang Attn: Robert R. Wellington, Esq. Field Representative Legal Counsel United States Senator Barbara Boxer 857 Cass Street, Suite D 1700 Montgomery Street, Suite 240 Monterey, CA 93940 San Francisco, CA 94111 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414

Pacific Gas and Electric Company Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRP Director (Roy.Caniano@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP (Rick.Deese@nrc.gov)

Senior Resident Inspector (Michael.Peck@nrc.gov)

Resident Inspector (Tony.Brown@nrc.gov)

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lucy.Owen@nrc.gov)

DRA Secretary (Judy.Kilcrease@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Ryan.Lantz@nrc.gov)

OEDO RIV Coordinator, Primary (Leigh.Trocine@nrc.gov)

OEDO, TRPS (Tamara.Bloomer@nrc.gov)

Deputy Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Timothy.McGinty@nrc.gov)

Chief, PLB IV, DORL, NRR (Thomas.Hiltz@nrc.gov)

NRR Project Manager (Alan.Wang@nrc.gov)

RidsNrrDirslpab (Resource@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov) mortensengk@INPO.org ROPreports File located: R:\EOC and Midcycle\Midcycle Assessment Letters\2009\DC.doc SUNSI Rev Compl. 7Yes No ADAMS 7Yes No Reviewer Initials VGG Publicly Avail 7Yes No Sensitive Yes 7No Sens. Type Initials VGG RIV:SPE/DRP/PBB C:DRP/PBB D:DRS CLDRO/PBB RWDeese VGGaddy RJCaniano VGGaddy

/RA/ /RA/ /RA/ /RA/

8/19/09 8/19/09 8/20/09 8/27/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Diablo Canyon 08/17/2009 14:25:29 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PBB-RVH2 - UNIT 2 REACTOR VESSEL HEAD REPLACEMENT 2 2 05/10/2009 12/31/2009 IP 71007 Reactor Vessel Head Replacement Inspection EB1-08 - U2 INSERVICE INSPECTION 3 2 10/12/2009 10/23/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 2 10/12/2009 10/23/2009 IP 7111108P Inservice Inspection Activities - PWR EXAM - INITIAL EXAM 6 1 11/30/2009 12/04/2009 X02435 INITIAL EXAM- DC (4/31/2010) 2 11/30/2009 12/04/2009 X02436 INITIAL EXAM- DC 2 (3/31/2010) 2 01/11/2010 01/22/2010 X02435 INITIAL EXAM- DC (4/31/2010) 1 01/11/2010 01/22/2010 X02436 INITIAL EXAM- DC 2 (3/31/2010)

RP-ORS5 - OCCUPATIONAL RADIATION SAFETY - ALARA 1 1, 2 12/14/2009 12/18/2009 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 12/14/2009 12/18/2009 IP 7112102 ALARA Planning and Controls 1, 2 12/14/2009 12/18/2009 IP 71151 Performance Indicator Verification EB1-21 - CDBI 6 1, 2 02/08/2010 02/12/2010 IP 7111121 Component Design Bases Inspection 1, 2 02/22/2010 03/05/2010 IP 7111121 Component Design Bases Inspection PSB2-52B - BIENNIAL PI&R 4 1, 2 03/22/2010 03/26/2010 IP 71152B Identification and Resolution of Problems 1, 2 04/05/2010 04/09/2010 IP 71152B Identification and Resolution of Problems EXAM - INITIAL EXAM 3 1 04/12/2010 04/16/2010 X02435 INITIAL EXAM- DC (4/31/2010) 1 05/17/2010 05/21/2010 X02435 INITIAL EXAM- DC (4/31/2010)

RP-ORS2 - OCCUPATIONAL RADIATION SAFETY-ALARA 1 1, 2 06/14/2010 06/18/2010 IP 7112101 Access Control to Radiologically Significant Areas 1, 2 06/14/2010 06/18/2010 IP 7112102 ALARA Planning and Controls 1, 2 06/14/2010 06/18/2010 IP 71151 Performance Indicator Verification EP-1 - BIENNIAL EP EXERCISE INSPECTION 3 1, 2 08/09/2010 08/13/2010 IP 7111401 Exercise Evaluation 1, 2 08/09/2010 08/13/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 08/09/2010 08/13/2010 IP 71151-EP01 Drill/Exercise Performance 1, 2 08/09/2010 08/13/2010 IP 71151-EP02 ERO Drill Participation 1, 2 08/09/2010 08/13/2010 IP 71151-EP03 Alert & Notification System RP-ORS1 - OCCUPATIONAL RADIATION SAFETY 1 1, 2 10/04/2010 10/08/2010 IP 7112101 Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Diablo Canyon 08/17/2009 14:25:29 Inspection / Activity Plan Report 22 09/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP-ORS1 - OCCUPATIONAL RADIATION SAFETY 1 1, 2 10/04/2010 10/08/2010 IP 7112102 ALARA Planning and Controls 1, 2 10/04/2010 10/08/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/04/2010 10/08/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent EB1-08P - INSERVICE INSPECTION - U1 3 1 10/12/2010 11/05/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 1 10/12/2010 11/05/2010 IP 7111108P Inservice Inspection Activities - PWR EB2-07T - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 12/06/2010 12/10/2010 IP 7111107T Heat Sink Performance RP TEAM - RADIATION SAFETY TEAM INSPECTION 4 1, 2 12/06/2010 12/10/2010 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1, 2 12/06/2010 12/10/2010 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1, 2 12/06/2010 12/10/2010 IP 7112202 Radioactive Material Processing and Transportation 1, 2 12/06/2010 12/10/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1, 2 12/06/2010 12/10/2010 IP 7113011 Material Control and Accounting (MC&A)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.