ML100610613: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML100610613 | |||
| issue date = 03/02/2010 | |||
| title = IR 05000482-09-005, for Wolf Creek, Replacement Page 18 of Report Details and Insert Page A-4A Into Supplemental Information, Errata | |||
| author name = Miller G | |||
| author affiliation = NRC/RGN-IV/DRP/RPB-B | |||
| addressee name = Sunseri M | |||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | |||
| docket = 05000482 | |||
| license number = NPF-042 | |||
| contact person = | |||
| document report number = IR-09-005 | |||
| document type = Letter, Inspection Report | |||
| page count = 5 | |||
}} | |||
See also: [[see also::IR 05000482/2009005]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUC LE AR RE G UL AT O RY C O M M I S S I O N | |||
R E GI ON I V | |||
612 EAST LAMAR BLVD , SU I TE 400 | |||
AR LI N GTON , TEXAS 76011-4125 | |||
March 2, 2010 | |||
Matthew W. Sunseri, President and | |||
Chief Executive Officer | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION | |||
REPORT 05000482/2009005 ERRATA | |||
Dear Mr. Sunseri: | |||
Please replace page 18 of the Report Details and insert page A-4A into the Supplemental | |||
Information in NRC Inspection Report 05000482/2009005, dated February 11, 2010, using the | |||
enclosed revised pages. These changes are needed to properly document a flood protection | |||
inspection. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be made available electronically for public inspection in the NRC | |||
Public Document Room or from the Publicly Available Records component of NRCs document | |||
system (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Geoffrey B. Miller, Chief | |||
Project Branch B | |||
Division of Reactor Projects | |||
Docket: 50-482 | |||
License: NPF-42 | |||
Enclosure: As stated | |||
cc w/Enclosure: | |||
Vice President Operations/Plant Manager | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
Jay Silberg, Esq. | |||
Pillsbury Winthrop Shaw Pittman LLP | |||
2300 N Street, NW | |||
Washington, DC 20037 | |||
Supervisor Licensing | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
Chief Engineer | |||
Utilities Division | |||
Kansas Corporation Commission | |||
1500 SW Arrowhead Road | |||
Topeka, KS 66604-4027 | |||
Office of the Governor | |||
State of Kansas | |||
Topeka, KS 66612-1590 | |||
Attorney General | |||
120 S.W. 10th Avenue, 2nd Floor | |||
Topeka, KS 66612-1597 | |||
County Clerk | |||
Coffey County Courthouse | |||
110 South 6th Street | |||
Burlington, KS 66839 | |||
Chief, Radiation and Asbestos | |||
Control Section | |||
Kansas Department of Health and | |||
Environment | |||
Bureau of Air and Radiation | |||
1000 SW Jackson, Suite 310 | |||
Topeka, KS 66612-1366 | |||
Electronic distribution by RIV: | |||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Chuck.Casto@nrc.gov) | |||
DRP Director (Dwight.Chamberlain@nrc.gov) | |||
DRP Deputy Director (Anton.Vegel@nrc.gov) | |||
DRS Director (Roy.Caniano@nrc.gov) | |||
DRS Deputy Director (Troy.Pruett@nrc.gov) | |||
Senior Resident Inspector (Chris.Long@nrc.gov) | |||
Site Secretary (Shirley.Allen@nrc.gov) | |||
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov) | |||
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov) | |||
Senior Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
Only inspection reports to the following: | |||
DRS/TSB STA (Dale.Powers@nrc.gov) | |||
L. Trocine, OEDO RIV Coordinator (Leigh.Trocine@nrc.gov) | |||
ROPreports | |||
SUNSI Review Completed: __CML__ ADAMS: ; Yes No Initials: __CML__ | |||
;Publicly Available Non-Publicly Available Sensitive ; Non-Sensitive | |||
ML 100610613 | |||
SRI:DRP/B PE:DRP/B BC:DRP/B | |||
CMLong GPTutak GBMiller | |||
/RA by E/ /RA/ /RA/ | |||
3/2/10 3/2/10 3/2/10 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
for bunkers/manholes; verified that operator actions for coping with flooding can | |||
reasonably achieve the desired outcomes; and walked down the area listed below to | |||
verify the adequacy of equipment seals located below the flood line, floor and wall | |||
penetration seals, watertight door seals, common drain lines and sumps, sump pumps, | |||
level alarms, and control circuits, and temporary or removable flood barriers. Specific | |||
documents reviewed during this inspection are listed in the attachment. | |||
* October 6, 2009, Auxiliary feedwater rooms and sump pumps | |||
* November 13, 2009, Residual Heat Removal Pump Room A after room cooler | |||
leakage | |||
These activities constitute completion of two flood protection measures inspection | |||
samples as defined by Inspection Procedure IP 71111.06-05. | |||
b. Findings | |||
No findings of significance were identified. | |||
1R07 Heat Sink Performance (71111.07) | |||
.1 Annual Inspection | |||
a. Inspection Scope | |||
The inspectors reviewed licensee programs, verified performance against industry | |||
standards, and reviewed critical operating parameters and maintenance records. | |||
* January 14, 2009, STN PE-38 on containment cooler SGN01D | |||
The inspectors verified that performance tests were satisfactorily conducted for heat | |||
exchangers/heat sinks and reviewed for problems or errors; the licensee utilized the | |||
periodic maintenance method outlined in Electric Power Research Institute | |||
Report NP 7552, "Heat Exchanger Performance Monitoring Guidelines;" the licensee | |||
properly utilized biofouling controls; the licensees heat exchanger inspections | |||
adequately assessed the state of cleanliness of their tubes; and the heat exchanger was | |||
correctly categorized under 10 CFR 50.65, Requirements for Monitoring the | |||
Effectiveness of Maintenance at Nuclear Power Plants. Specific documents reviewed | |||
during this inspection are listed in the attachment. | |||
These activities constitute completion of one heat sink inspection sample as defined by | |||
Inspection Procedure IP 71111.07-05. | |||
b. Findings | |||
No findings of significance were identified. | |||
- 18 - | |||
MISCELLANEOUS | |||
Condition Report 21764 | |||
Floor Drain Tank Logs 11/12/09 - 11/14/09 | |||
WORK ORDERS | |||
09-322276-000 | |||
09-322259-002 | |||
DRAWINGS | |||
NUMBER TITLE Revision | |||
10466-A-1301 Architectural Auxiliary & Reactor Bldg. Floor Plan El. 8 | |||
1974 0 | |||
C-1C1112 Auxiliary Building - Area 1 Concrete Neat Lines Plan 2 | |||
- Base Slab El. 1974 0 | |||
C-1C1122 Auxiliary Building - Area 2 Concrete Neat Lines Plan 2 | |||
- Base Slab El. 1974 0 | |||
10466 C-0026 Civil Structural Standard Details Stainless Steel 11 | |||
Sumps | |||
A-4a | |||
}} |
Latest revision as of 22:22, 13 November 2019
ML100610613 | |
Person / Time | |
---|---|
Site: | Wolf Creek ![]() |
Issue date: | 03/02/2010 |
From: | Geoffrey Miller NRC/RGN-IV/DRP/RPB-B |
To: | Matthew Sunseri Wolf Creek |
References | |
IR-09-005 | |
Download: ML100610613 (5) | |
See also: IR 05000482/2009005
Text
UNITED STATES
NUC LE AR RE G UL AT O RY C O M M I S S I O N
R E GI ON I V
612 EAST LAMAR BLVD , SU I TE 400
AR LI N GTON , TEXAS 76011-4125
March 2, 2010
Matthew W. Sunseri, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION
REPORT 05000482/2009005 ERRATA
Dear Mr. Sunseri:
Please replace page 18 of the Report Details and insert page A-4A into the Supplemental
Information in NRC Inspection Report 05000482/2009005, dated February 11, 2010, using the
enclosed revised pages. These changes are needed to properly document a flood protection
inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records component of NRCs document
system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Geoffrey B. Miller, Chief
Project Branch B
Division of Reactor Projects
Docket: 50-482
License: NPF-42
Enclosure: As stated
cc w/Enclosure:
Vice President Operations/Plant Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N Street, NW
Washington, DC 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Chief Engineer
Utilities Division
Kansas Corporation Commission
1500 SW Arrowhead Road
Topeka, KS 66604-4027
Office of the Governor
State of Kansas
Topeka, KS 66612-1590
Attorney General
120 S.W. 10th Avenue, 2nd Floor
Topeka, KS 66612-1597
County Clerk
Coffey County Courthouse
110 South 6th Street
Burlington, KS 66839
Chief, Radiation and Asbestos
Control Section
Kansas Department of Health and
Environment
Bureau of Air and Radiation
1000 SW Jackson, Suite 310
Topeka, KS 66612-1366
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Chris.Long@nrc.gov)
Site Secretary (Shirley.Allen@nrc.gov)
Branch Chief, DRP/B (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Senior Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Only inspection reports to the following:
DRS/TSB STA (Dale.Powers@nrc.gov)
L. Trocine, OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
ROPreports
SUNSI Review Completed: __CML__ ADAMS: ; Yes No Initials: __CML__
- Publicly Available Non-Publicly Available Sensitive ; Non-Sensitive
SRI:DRP/B PE:DRP/B BC:DRP/B
CMLong GPTutak GBMiller
/RA by E/ /RA/ /RA/
3/2/10 3/2/10 3/2/10
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
for bunkers/manholes; verified that operator actions for coping with flooding can
reasonably achieve the desired outcomes; and walked down the area listed below to
verify the adequacy of equipment seals located below the flood line, floor and wall
penetration seals, watertight door seals, common drain lines and sumps, sump pumps,
level alarms, and control circuits, and temporary or removable flood barriers. Specific
documents reviewed during this inspection are listed in the attachment.
- October 6, 2009, Auxiliary feedwater rooms and sump pumps
- November 13, 2009, Residual Heat Removal Pump Room A after room cooler
leakage
These activities constitute completion of two flood protection measures inspection
samples as defined by Inspection Procedure IP 71111.06-05.
b. Findings
No findings of significance were identified.
1R07 Heat Sink Performance (71111.07)
.1 Annual Inspection
a. Inspection Scope
The inspectors reviewed licensee programs, verified performance against industry
standards, and reviewed critical operating parameters and maintenance records.
- January 14, 2009, STN PE-38 on containment cooler SGN01D
The inspectors verified that performance tests were satisfactorily conducted for heat
exchangers/heat sinks and reviewed for problems or errors; the licensee utilized the
periodic maintenance method outlined in Electric Power Research Institute
Report NP 7552, "Heat Exchanger Performance Monitoring Guidelines;" the licensee
properly utilized biofouling controls; the licensees heat exchanger inspections
adequately assessed the state of cleanliness of their tubes; and the heat exchanger was
correctly categorized under 10 CFR 50.65, Requirements for Monitoring the
Effectiveness of Maintenance at Nuclear Power Plants. Specific documents reviewed
during this inspection are listed in the attachment.
These activities constitute completion of one heat sink inspection sample as defined by
Inspection Procedure IP 71111.07-05.
b. Findings
No findings of significance were identified.
- 18 -
MISCELLANEOUS
Condition Report 21764
Floor Drain Tank Logs 11/12/09 - 11/14/09
WORK ORDERS
09-322276-000
09-322259-002
DRAWINGS
NUMBER TITLE Revision
10466-A-1301 Architectural Auxiliary & Reactor Bldg. Floor Plan El. 8
1974 0
C-1C1112 Auxiliary Building - Area 1 Concrete Neat Lines Plan 2
- Base Slab El. 1974 0
C-1C1122 Auxiliary Building - Area 2 Concrete Neat Lines Plan 2
- Base Slab El. 1974 0
10466 C-0026 Civil Structural Standard Details Stainless Steel 11
A-4a