| issue date = 03/05/2012
| issue date = 03/05/2012
| title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280-11-007 and 05000281-11-007
| title = Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280-11-007 and 05000281-11-007
| author name = McCoy G J
| author name = Mccoy G
| author affiliation = NRC/RGN-II/DRP/RPB5
| author affiliation = NRC/RGN-II/DRP/RPB5
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES arch 5, 2012
[[Issue date::March 5, 2012]]


Mr. David President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007


SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007
==Dear Mr. Heacock:==
On February 15, 2012, the NRC completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2 The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
 
The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).


==Dear Mr. Heacock:==
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
On February 15, 2012, the NRC completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2 The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.


The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Although plant performance was within the Licensee Response Column he NRC has not yet finalized the significance of a Finding (FIN) 5000281/2011005-02, Failure to Conduct Reviews of the Vendor Technical Manual for the RCS Standpipe. The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.


Although plant performance was within the Licensee Response Column he NRC has not yet finalized the significance of a Finding (FIN) 5000281/2011005-02, Failure to Conduct Reviews of the Vendor Technical Manual for the RCS Standpipe. The final safety significance determination may affect the NRC's assessment of plant performance and the enclosed inspection plan.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for


The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for VEPCO 2 the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
VEPCO   2 the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


We also plan on conducting several non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping, Post Approval Site Inspection for License Renewal, and Operating License Initial Exam.
We also plan on conducting several non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping, Post Approval Site Inspection for License Renewal, and Operating License Initial Exam.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice, " a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 404-997-4551 with any questions you may have regarding this letter.
Please contact me at 404-997-4551 with any questions you may have regarding this letter.


Sincerely,/RA/ Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37  
Sincerely,
 
/RA/
===Enclosure:===
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: Surry Inspection / Activity Plan (03/01/2012 - 06/30/2013)
Surry Inspection / Activity Plan (03/01/2012 - 06/30/2013)  
 
__PKG: ML120650611_______ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON GJM NAME SNinh GMcCoy DATE 02/28/2012 03/05/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 3 cc w/encl: Larry Lane Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution
 
Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. Electronic Mail Distribution
 
Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution


Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209
__PKG: ML120650611_______ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON GJM NAME SNinh GMcCoy DATE  02/28/2012 03/05/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO


Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 Michael M. Cline,Director Virginia Department of Emergency Services Management Electronic Mail Distribution  
VEPCO  3 cc w/encl:  Michael M. Cline,Director Larry Lane  Virginia Department of Emergency Services Site Vice President  Management Surry Power Station  Electronic Mail Distribution Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.


VEPCO 4 Letter to David from Gerald J. McCoy dated March 5, 2012
Senior Counsel Dominion Resources Services, Inc.


SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007
Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883


Distribution w/encl:
VEPCO  4 Letter to David from Gerald J. McCoy dated March 5, 2012 SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007 Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC ROP Reports Institute of Nuclear Power Operations (INPO) RidsNrrPMSurry Resource
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC ROP Reports Institute of Nuclear Power Operations (INPO)
RidsNrrPMSurry Resource
}}
}}

Latest revision as of 07:14, 12 November 2019

Annual Assessment Letter for Surry Power Station, Units 1 and 2 - Report 05000280-11-007 and 05000281-11-007
ML120650615
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/05/2012
From: Gerald Mccoy
NRC/RGN-II/DRP/RPB5
To: Heacock D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML120650611 List:
References
IR-11-007
Download: ML120650615 (5)


Text

UNITED STATES arch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007

Dear Mr. Heacock:

On February 15, 2012, the NRC completed its end-of-cycle performance review of Surry Power Station, Units 1 and 2 The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Surry Power Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Surry Power Station, Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

Although plant performance was within the Licensee Response Column he NRC has not yet finalized the significance of a Finding (FIN)5000281/2011005-02, Failure to Conduct Reviews of the Vendor Technical Manual for the RCS Standpipe. The final safety significance determination may affect the NRCs assessment of plant performance and the enclosed inspection plan.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for

VEPCO 2 the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

We also plan on conducting several non-ROP inspections which include: Temporary Instruction (TI) 2515/182, Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping, Post Approval Site Inspection for License Renewal, and Operating License Initial Exam.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4551 with any questions you may have regarding this letter.

Sincerely,

/RA/

Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37 Enclosure: Surry Inspection / Activity Plan (03/01/2012 - 06/30/2013)

__PKG: ML120650611_______ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE SON GJM NAME SNinh GMcCoy DATE 02/28/2012 03/05/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

VEPCO 3 cc w/encl: Michael M. Cline,Director Larry Lane Virginia Department of Emergency Services Site Vice President Management Surry Power Station Electronic Mail Distribution Virginia Electric and Power Company Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.

Senior Counsel Dominion Resources Services, Inc.

Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883

VEPCO 4 Letter to David from Gerald J. McCoy dated March 5, 2012 SUBJECT: ANNUAL ASSESSMENT LETTER FOR SURRY POWER STATION, UNITS 1 AND 2 - REPORT 05000280/2011007 AND 05000281/2011007 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC ROP Reports Institute of Nuclear Power Operations (INPO)