| title = Columbia Generating Station - Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla (TAC ME7905)
| title = Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla
| author name = Thadani M C
| author name = Thadani M
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Dunham Z K
| addressee name = Dunham Z
| addressee affiliation = Energy Northwest
| addressee affiliation = Energy Northwest
| docket = 05000397
| docket = 05000397
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Thadani, Mohan Sent: Monday, April 16, 2012 8:23 AM To: Dunham, Zachary K. Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Razzaque, Muhammad; Singh, Gursharan  
{{#Wiki_filter:From:                       Thadani, Mohan Sent:                       Monday, April 16, 2012 8:23 AM To:                         Dunham, Zachary K.
Cc:                         Lingam, Siva; Lent, Susan; Burkhardt, Janet; Razzaque, Muhammad; Singh, Gursharan


==Subject:==
==Subject:==
ME7005-ACCEPTANCE REVIEW FOR COLUMBIA LAR-PRNM/ARTS/MELLA Importance: High Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
ME7005-ACCEPTANCE REVIEW FOR COLUMBIA LAR-PRNM/ARTS/MELLA Importance:                 High Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968  
Richland, WA 99352-0968


==SUBJECT:==
==SUBJECT:==
COLUMBIA GENERATING STATION -LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATIONS IN SUPPORT OF PRNM/ARTS/MELLA IMPLEMENTATION.(TAC NO. ME7905)
COLUMBIA GENERATING STATION -LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATIONS IN SUPPORT OF PRNM/ARTS/MELLA IMPLEMENTATION.(TAC NO. ME7905)


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==


By letter dated January 31, 2012, (ADAMS Accession No. ML1120400144), Energy Northwest, the licensee for Columbia Generating Station, requested the U.S. Nuclear Regulatory Commission (NRC) staff's approval of amendment to Technical Specifications (TS) for Facility Operating License No. NPF-21. The amendment would revise the TS for power distribution limits, control rod block instrumentation, Oscillation Power Range Monitor (OPRM) instrumentation, recirculation loop operating, shutdown margin test-refueling, and the Core Operating Limits Report (COLR). The proposed amendment would also provide expanded operating domain resulting from the implementation of Average Power Range Monitor/Rod Block Monitor/ Technical Specifications//Maximum Extended Load Line Limit analysis (ARTS/MELLA).  
By letter dated January 31, 2012, (ADAMS Accession No. ML1120400144), Energy Northwest, the licensee for Columbia Generating Station, requested the U.S. Nuclear Regulatory Commission (NRC) staffs approval of amendment to Technical Specifications (TS) for Facility Operating License No. NPF-21.
 
The amendment would revise the TS for power distribution limits, control rod block instrumentation, Oscillation Power Range Monitor (OPRM) instrumentation, recirculation loop operating, shutdown margin test-refueling, and the Core Operating Limits Report (COLR). The proposed amendment would also provide expanded operating domain resulting from the implementation of Average Power Range Monitor/Rod Block Monitor/ Technical Specifications//Maximum Extended Load Line Limit analysis (ARTS/MELLA).
The purpose of this letter is to provide the results of the NRC staff=s acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The purpose of this letter is to provide the results of the NRC staff=s acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.


The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1476 or email mohan.thadani@n.
If you have any questions, please contact me at (301) 415-1476 or email mohan.thadani@n.
Best Regards, Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476     Mohan.Thadani@nrc.gov Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476     Mohan.Thadani@nrc.gov    
Best Regards, Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov}}
}}

Latest revision as of 06:00, 12 November 2019

Acceptance Review Email, License Amendment Request, Technical Specification Changes to Support Installation of GE Hitachi Power Range Neutron Monitoring System; Implementation of Arts/Mellla
ML121070222
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/16/2012
From: Thadani M
Plant Licensing Branch IV
To: Dunham Z
Energy Northwest
Thadani, M C, NRR/DORL/LP4, 415-1476
References
TAC ME7905
Download: ML121070222 (2)


Text

From: Thadani, Mohan Sent: Monday, April 16, 2012 8:23 AM To: Dunham, Zachary K.

Cc: Lingam, Siva; Lent, Susan; Burkhardt, Janet; Razzaque, Muhammad; Singh, Gursharan

Subject:

ME7005-ACCEPTANCE REVIEW FOR COLUMBIA LAR-PRNM/ARTS/MELLA Importance: High Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT:

COLUMBIA GENERATING STATION -LICENSE AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATIONS IN SUPPORT OF PRNM/ARTS/MELLA IMPLEMENTATION.(TAC NO. ME7905)

Dear Mr. Reddemann:

By letter dated January 31, 2012, (ADAMS Accession No. ML1120400144), Energy Northwest, the licensee for Columbia Generating Station, requested the U.S. Nuclear Regulatory Commission (NRC) staffs approval of amendment to Technical Specifications (TS) for Facility Operating License No. NPF-21.

The amendment would revise the TS for power distribution limits, control rod block instrumentation, Oscillation Power Range Monitor (OPRM) instrumentation, recirculation loop operating, shutdown margin test-refueling, and the Core Operating Limits Report (COLR). The proposed amendment would also provide expanded operating domain resulting from the implementation of Average Power Range Monitor/Rod Block Monitor/ Technical Specifications//Maximum Extended Load Line Limit analysis (ARTS/MELLA).

The purpose of this letter is to provide the results of the NRC staff=s acceptance review of the amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1476 or email mohan.thadani@n.

Best Regards, Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov Mohan C Thadani Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov