| title = Crystal River, Unit 3 - Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies.
| title = Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies.
| author name =  
| author name =  
| author affiliation = AREVA NP, Inc, Progress Energy Florida, Inc
| author affiliation = AREVA NP, Inc, Progress Energy Florida, Inc
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT D TECHNICAL REPORT ANP-3114(NP):
{{#Wiki_filter:FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT D TECHNICAL REPORT ANP-3114(NP):
CR-3 EPU -FEEDWATER LINE BREAK ANALYSIS SENSITIVITY STUDIES, REVISION 0 (NON-PROPRIETARY)
CR-3 EPU - FEEDWATER LINE BREAK ANALYSIS SENSITIVITY STUDIES, REVISION 0 (NON-PROPRIETARY)
 
Controfled ANP-3114(NP)
Controfled ANP-3114(NP)
Revision 0 CR-3 EPU -Feedwater Line Break Analysis Sensitivity Studies May 2012 AREVA Controlled Document ANP-3114(NP)
Revision 0 CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies May 2012 AREVA
Revision 0 May 2012 CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies Copyright  
 
© 2012 AREVA Inc.All Rights Reserved Controled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
Controlled Document ANP-3114(NP)
Revision 0 Page 3 Record of Revision Revision Pages/Sections/Paragraphs No. Changed Brief Description I Change Authorization 000 All Initial Release Controlled Document A AR EVA ANP-3114(NP)
Revision 0 May 2012 CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies Copyright © 2012 AREVA Inc.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 4 Table of Contents 1 .0 In tro d u c tio n ........................................................................................................................................
All Rights Reserved
8 2.0 Analytical M ethodology
 
............................................................................................................
Controled Document A
9 3.0 Analysis Inputs ................................................................................................................................
AREVA ANP-3114(NP)
10 4 .0 R e s u lts ............................................................................................................................................
CR-3 EPU Feedwater Line Break Analysis                                             Revision 0 Sensitivity Studies                                                                   Page 3 Record of Revision Revision     Pages/Sections/Paragraphs No.               Changed                   Brief Description I Change Authorization 000           All                         Initial Release
1 3 4.1 Base Case for Sensitivity Studies ..........................................................................................
 
13 4.2 RCS Pressure Sensitivity  
Controlled Document A
......................................................................................................
AR EVA                                                                                                                                                     ANP-3114(NP)
14 4.3 RCS Flow Sensitivity  
CR-3 EPU Feedwater Line Break Analysis                                                                                                                             Revision 0 Sensitivity Studies                                                                                                                                                   Page 4 Table of Contents 1.0     Intro d u c tio n ........................................................................................................................................         8 2.0     Analytical Methodology ............................................................................................................                                 9 3.0     Analysis Inputs ................................................................................................................................                   10 4 .0   R e s u lts ............................................................................................................................................           13 4.1     Base Case for Sensitivity Studies ..........................................................................................                                   13 4.2     RCS Pressure Sensitivity ......................................................................................................                                 14 4.3     RCS Flow Sensitivity ...................................................................................................................                       15 4.4     Power Level Sensitivity ........................................................................................................                               16 4.5     Tim e in Cycle Sensitivity .............................................................................................................                       18 4.6     Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity .............................                                                           20 4.7     Pressurizer Level Sensitivity .......................................................................................................                           24 4.8     Loss of Offsite Power ...........................................                     I..................................................................     25 4.9     Break Size Sensitivity ............................................................................................................                             26 4.10   Break Location Sensitivity Study .................................................................................................                             28 4.11   Evaluation of Continued Main Feedwater to Unaffected SG ......................................................                                                 30 4.12   Lim iting Feedw ater Line Break Conditions and Results .............................................................                                           31 5.0     References ......................................................................................................................................                 38
...................................................................................................................
 
15 4.4 Power Level Sensitivity  
Controlled Document A
........................................................................................................
AREVA ANP-3114(NP)
16 4.5 Tim e in Cycle Sensitivity  
CR-3 EPU Feedwater Line Break Analysis                                                                                                   Revision 0 Sensitivity Studies                                                                                                                         Page 5 List of Tables Table 4-1: RCS Pressure Sensitivity Results .........................................................................................           14 Table 4-2: RCS Flow Sensitivity Results ............................................................................................           15 Table 4-3: Steady-State Results for Power Level Sensitivity ...............................................................                     17 Table 4-4: Power Level Sensitivity Results ...........................................................................................         17 Table 4-5: Time in Cycle Sensitivity Results ........................................................................................           19 Table 4-6: SG Inventory Sensitivity Results .........................................................................................           21 Table 4-7: Pressurizer Level Sensitivity Results .................................................................................             24 Table 4-8: LOOP Evaluation Results ....................................................................................................         25 Table 4-9: Break Size Sensitivity Results .............................................................................................         27 Table 4-10: Break Location Sensitivity Study ............................................................................................       29 Table 4-12: Effect of Continued MFW to Unaffected SG ...........................................................................               30 Table 4-13: Sequence of Events for Limiting FWLB Transient ............................................................                         32 Table 4-14: Results for Limiting FWLB Transient .................................................................................               32
.............................................................................................................
 
18 4.6 Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity  
Controfled Document A
.............................
AR EVA                                                                                                                         ANP-3114(NP)
20 4.7 Pressurizer Level Sensitivity  
CR-3 EPU Feedwater Line Break Analysis                                                                                                 Revision 0 Sensitivity Studies                                                                                                                         Page 6 List of Figures Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory ..............................................                           22 Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory ...............................................                             23 Figure 4-3: Feedwater Line Break Locations .............................................................................................           29 Figure 4-4: FWLB RCS Peak Pressure versus Time .................................................................................                   33 Figure 4-5: FWLB RCS Temperatures versus Time ..................................................................................                   34 Figure 4-6: FWLB Pressurizer Level versus Time .....................................................................................               35 Figure 4-7: FWLB SG Pressures versus Time ..................................................................................             :........ 36 Figure 4-8: FWLB SG Levels versus Time ..........................................................................................                 37
.......................................................................................................
24 4.8 Loss of Offsite Power ...........................................
I ..................................................................
25 4.9 Break Size Sensitivity  
............................................................................................................
26 4.10 Break Location Sensitivity Study .................................................................................................
28 4.11 Evaluation of Continued M ain Feedwater to Unaffected SG ......................................................
30 4.12 Lim iting Feedw ater Line Break Conditions and Results .............................................................
31 5.0 References  
......................................................................................................................................
38 Controlled Document A AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 5 List of Tables Table 4-1: RCS Pressure Sensitivity Results .........................................................................................
14 Table 4-2: RCS Flow Sensitivity Results ............................................................................................
15 Table 4-3: Steady-State Results for Power Level Sensitivity  
...............................................................
17 Table 4-4: Power Level Sensitivity Results ...........................................................................................
17 Table 4-5: Time in Cycle Sensitivity Results ........................................................................................
19 Table 4-6: SG Inventory Sensitivity Results .........................................................................................
21 Table 4-7: Pressurizer Level Sensitivity Results .................................................................................
24 Table 4-8: LOOP Evaluation Results ....................................................................................................
25 Table 4-9: Break Size Sensitivity Results .............................................................................................
27 Table 4-10: Break Location Sensitivity Study ............................................................................................
29 Table 4-12: Effect of Continued MFW to Unaffected SG ...........................................................................
30 Table 4-13: Sequence of Events for Limiting FWLB Transient  
............................................................
32 Table 4-14: Results for Limiting FWLB Transient  
.................................................................................
32 Controfled Document A AR EVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 6 List of Figures Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory  
..............................................
22 Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory  
...............................................
23 Figure 4-3: Feedwater Line Break Locations  
.............................................................................................
29 Figure 4-4: FWLB RCS Peak Pressure versus Time .................................................................................
33 Figure 4-5: FWLB RCS Temperatures versus Time ..................................................................................
34 Figure 4-6: FWLB Pressurizer Level versus Time .....................................................................................
35 Figure 4-7: FWLB SG Pressures versus Time ..................................................................................  
: ........ 36 Figure 4-8: FWLB SG Levels versus Time ..........................................................................................
37 Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
Revision 0 Page 7 Nomenclature Acronym Definition p 3 eff Delayed Neutron Fraction BOC Beginning of Cycle CR-3 Crystal River Unit 3 DTC Doppler Temperature Coefficient EFIC Emergency Feedwater Initiation and Control EFW Emergency Feedwater EOC End of Cycle EPU Extended Power Uprate FOGG Feed Only Good Generator FWLB Feedwater Line Break HZP Hot Zero Power ICS Integrated Control System LAR Licensing Amendment Request LOCA Loss of Coolant Accident LOFW Loss of Feedwater LOOP Loss of Offsite Power MFW Main Feedwater MSSV Main Steam Safety Valves MTC Moderator Temperature Coefficient NRC Nuclear Regulatory Commission PORV Pilot Operated Relief Valve PSV Pressurizer Safety Valve RCP Reactor Coolant Pump RCS Reactor Coolant System RPS Reactor Protection System SDM Shutdown Margin SG Steam Generator SRP Standard Review Plan Tave Average RCS Temperature TSV Turbine Stop Valves ControDled Document A AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 8


==1.0 INTRODUCTION==
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                            Revision 0 Sensitivity Studies                                                  Page 7 Nomenclature Acronym      Definition p3eff                Delayed Neutron Fraction BOC                  Beginning of Cycle CR-3                Crystal River Unit 3 DTC                  Doppler Temperature Coefficient EFIC                Emergency Feedwater Initiation and Control EFW                  Emergency Feedwater EOC                  End of Cycle EPU                  Extended Power Uprate FOGG                Feed Only Good Generator FWLB                Feedwater Line Break HZP                  Hot Zero Power ICS                  Integrated Control System LAR                  Licensing Amendment Request LOCA                Loss of Coolant Accident LOFW                Loss of Feedwater LOOP                Loss of Offsite Power MFW                  Main Feedwater MSSV                Main Steam Safety Valves MTC                  Moderator Temperature Coefficient NRC                  Nuclear Regulatory Commission PORV                Pilot Operated Relief Valve PSV                  Pressurizer Safety Valve RCP                  Reactor Coolant Pump RCS                  Reactor Coolant System RPS                  Reactor Protection System SDM                  Shutdown Margin SG                  Steam Generator SRP                  Standard Review Plan Tave                Average RCS Temperature TSV                  Turbine Stop Valves


Section 2.8.5.2.4 of the Crystal River Unit 3 (CR-3) extended power uprate (EPU) licensing amendment request (LAR) describes the feedwater line break (FWLB) evaluations that were performed to support the power uprate. The evaluations that were performed are consistent with approved methodology  
ControDled Document A
[2] and the current licensing basis of the plant, except that the licensing basis is being revised for EPU to use the Standard Review Plan (SRP) Section 15.2.8 reactor coolant system (RCS) pressure limit of 120% of the design pressure, or 3000 psig. Since the CR-3 licensing basis is being revised to use the SRP pressure limit, additional sensitivity studies are performed to address requirements of SRP 15.2.8. The sensitivity studies documented in this report are for the following parameters:
AREVA ANP-3114(NP)
* Initial RCS Pressure" Initial RCS Flow* Initial Power Level* Time in Cycle* Initial RCS Average Temperature (Tave)" Initial steam generator (SG) Pressure* Initial SG Level* Initial Pressurizer Level* Loss of offsite power (LOOP)* Break Size* Break Location Controlled Document A ARE VA ANP-31 14(NP)CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 9 2.0 ANALYTICAL METHODOLOGY The thermal-hydraulic analysis of the FWLB at the CR-3 EPU power level is performed using the RELAP5/MOD2-B&W computer program (Reference  
CR-3 EPU Feedwater Line Break Analysis                                                              Revision 0 Sensitivity Studies                                                                                    Page 8
[1]). The code simulates RCS and secondary system operation.
 
The reactor core model is based on a point kinetics solution with reactivity feedback for control rod assembly insertion, fuel temperature changes, moderator temperature changes, and changes in boron concentration.
==1.0      INTRODUCTION==
The RCS model provides for heat transfer from the core, transport of the coolant to the steam generators, and heat transfer to the steam generators.
 
The secondary model includes a detailed depiction of the main steam system, including steam relief to the atmosphere through the main steam safety valves (MSSVs) and simulation of the turbine stop valves (TSVs). The secondary model also includes the delivery of feedwater, both main and emergency, to the steam generators.
Section 2.8.5.2.4 of the Crystal River Unit 3 (CR-3) extended power uprate (EPU) licensing amendment request (LAR) describes the feedwater line break (FWLB) evaluations that were performed to support the power uprate. The evaluations that were performed are consistent with approved methodology [2] and the current licensing basis of the plant, except that the licensing basis is being revised for EPU to use the Standard Review Plan (SRP) Section 15.2.8 reactor coolant system (RCS) pressure limit of 120% of the design pressure, or 3000 psig. Since the CR-3 licensing basis is being revised to use the SRP pressure limit, additional sensitivity studies are performed to address requirements of SRP 15.2.8. The sensitivity studies documented in this report are for the following parameters:
The RELAP5/MOD2-B&W code has been approved by the Nuclear Regulatory Commission (NRC) for use in non Loss of Coolant (LOCA) safety analyses (Reference  
* Initial RCS Pressure
[2]). The FWLB analysis documented in Section 2.8.5.2.4 of the CR-3 EPU LAR is consistent with Reference  
      "   Initial RCS Flow
[2]. The methodology in Reference[2] dictates the input boundary conditions for many plant parameters, such as the RCS flow, Tave, and the RCS initial pressure.
* Initial Power Level
The intent of the evaluations in this report is to determine the effect of changing initial conditions on the FWLB transient to support compliance with SRP Section 15.2.8. Therefore, the analyses in this document include input conditions that are not consistent with Reference  
* Time in Cycle
[2]. However, the conditions specified in Reference  
* Initial RCS Average Temperature (Tave)
[2] are included or bounded by the range of conditions considered in the sensitivity studies.
      "   Initial steam generator (SG) Pressure
Controfled Document A AREVA ANP-3114(NP)
* Initial SG Level
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 10 3.0 ANALYSIS INPUTS Many of the input parameters in the FWLB sensitivity studies are consistent with the FWLB analysis without pressurizer spray performed to support Section 2.8.5.2.4 of the CR-3 EPU LAR. The input parameters that are consistent are listed below:* The maximum power level considered is the targeted EPU power level of 3026.1 MWt (100.4% of 3014 MWt). A conservative reactor coolant pump (RCP) heat of 16.4 MWt is included when the RCPs are operating.
* Initial Pressurizer Level
* The nominal average RCS temperature (Tave) is 582 *F, consistent with the increase in Tave that is planned in conjunction with the EPU.* The nominal hot leg pressure is 2170 psia.* The minimum RCS flow rate considered is 374,880 gpm.* The nominal indicated pressurizer level plus uncertainty is 240 inches.* Two pressurizer safety valves (PSVs) were modeled with a nominal lift setpoint of 2500 psig, plus 3% lift tolerance, and 0% accumulation.
* Loss of offsite power (LOOP)
A blowdown of 4% was also considered.
* Break Size
* Pressurizer heaters and pressurizer spray were not modeled.* The Pilot Operated Relief Valve (PORV) was not modeled for the FWLB analysis." Reactor trip was modeled to occur based on the reactor protection system (RPS) high RCS pressure trip function.
* Break Location
The high RCS pressure trip setpoint includes the effects of elevated pressure that may exist inside containment post-FWLB.
 
Controlled Document A
ARE VA                                                                                         ANP-31 14(NP)
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                     Page 9 2.0       ANALYTICAL METHODOLOGY The thermal-hydraulic analysis of the FWLB at the CR-3 EPU power level is performed using the RELAP5/MOD2-B&W computer program (Reference [1]). The code simulates RCS and secondary system operation. The reactor core model is based on a point kinetics solution with reactivity feedback for control rod assembly insertion, fuel temperature changes, moderator temperature changes, and changes in boron concentration. The RCS model provides for heat transfer from the core, transport of the coolant to the steam generators, and heat transfer to the steam generators. The secondary model includes a detailed depiction of the main steam system, including steam relief to the atmosphere through the main steam safety valves (MSSVs) and simulation of the turbine stop valves (TSVs). The secondary model also includes the delivery of feedwater, both main and emergency, to the steam generators.
The RELAP5/MOD2-B&W code has been approved by the Nuclear Regulatory Commission (NRC) for use in non Loss of Coolant (LOCA) safety analyses (Reference [2]). The FWLB analysis documented in Section 2.8.5.2.4 of the CR-3 EPU LAR is consistent with Reference [2]. The methodology in Reference
[2] dictates the input boundary conditions for many plant parameters, such as the RCS flow, Tave, and the RCS initial pressure. The intent of the evaluations in this report is to determine the effect of changing initial conditions on the FWLB transient to support compliance with SRP Section 15.2.8. Therefore, the analyses in this document include input conditions that are not consistent with Reference [2]. However, the conditions specified in Reference [2] are included or bounded by the range of conditions considered in the sensitivity studies.
 
Controfled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                           Revision 0 Sensitivity Studies                                                                                 Page 10 3.0     ANALYSIS INPUTS Many of the input parameters in the FWLB sensitivity studies are consistent with the FWLB analysis without pressurizer spray performed to support Section 2.8.5.2.4 of the CR-3 EPU LAR. The input parameters that are consistent are listed below:
* The maximum power level considered is the targeted EPU power level of 3026.1 MWt (100.4% of 3014 MWt). A conservative reactor coolant pump (RCP) heat of 16.4 MWt is included when the RCPs are operating.
* The nominal average RCS temperature (Tave) is 582 *F, consistent with the increase in Tave that is planned in conjunction with the EPU.
* The nominal hot leg pressure is 2170 psia.
* The minimum RCS flow rate considered is 374,880 gpm.
* The nominal indicated pressurizer level plus uncertainty is 240 inches.
* Two pressurizer safety valves (PSVs) were modeled with a nominal lift setpoint of 2500 psig, plus 3% lift tolerance, and 0% accumulation. A blowdown of 4% was also considered.
* Pressurizer heaters and pressurizer spray were not modeled.
* The Pilot Operated Relief Valve (PORV) was not modeled for the FWLB analysis.
    "   Reactor trip was modeled to occur based on the reactor protection system (RPS) high RCS pressure trip function. The high RCS pressure trip setpoint includes the effects of elevated pressure that may exist inside containment post-FWLB.
* The control rod worth modeled in the analysis is the minimum rod worth that will meet the shutdown margin (SDM) requirement.
* The control rod worth modeled in the analysis is the minimum rod worth that will meet the shutdown margin (SDM) requirement.
* After reactor trip, the core heat generation rate was conservatively based on 1.0 times the ANS 1971 decay heat standard for fission plus heavy actinides." Beginning-of-cycle (BOC) typical reactivity coefficients (Doppler temperature coefficient (DTC) -1.30 x 10-5 Ak/k/OF and moderator temperature coefficient (MTC) = 0.0 x 10-4 Ak/k/°F) were evaluated.
* After reactor trip, the core heat generation rate was conservatively based on 1.0 times the ANS 1971 decay heat standard for fission plus heavy actinides.
* The MSSVs were modeled to lift at the nominal setpoints plus 3% lift tolerance and 3%accumulation.
    "   Beginning-of-cycle (BOC) typical reactivity coefficients (Doppler temperature coefficient (DTC)   -
A nominal blowdown of 5% was used." A single failure of one train of the Emergency Feedwater Initiation and Control (EFIC) system was assumed as the worse case single failure. Therefore, only one of the two emergency feedwater (EFW) pumps was assumed to be available to provide flow to the SGs. The EFW temperature was modeled as 120 *F. The EFIC system contains Feed Only Good Generator (FOGG) logic, thus all EFW was provided to the unaffected SG.* Steam generator tube plugging of 5% was modeled.
1.30 x 10-5 Ak/k/OF and moderator temperature coefficient (MTC) = 0.0 x 10-4 Ak/k/°F) were evaluated.
Controlled Document A AR EVA ANP-3114(NP)
* The MSSVs were modeled to lift at the nominal setpoints plus 3% lift tolerance and 3%
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 11* No operator actions were credited." No Integrated Control System (ICS) actions were credited.Key input parameters modeled in the sensitivity studies that are different from the FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR include:* The sensitivity studies considered power levels ranging from 60% to 100.4% of the EPU rated thermal power level (3014 MWt). The sensitivity demonstrates that the peak RCS pressure is much less at lower power levels, so evaluations below 60% were not required.* The sensitivity studies considered a Tave range of 582 +/- 3 *F, allowing for an uncertainty of up to 3 'F.* The sensitivity studies considered hot leg pressure ranging from the minimum allowed value of 2078.7 psia to a maximum value of 2244.7 psia, which is 25 psi above the setpoint for opening the pressurizer spray valves to allow for uncertainty." The sensitivity studies considered RCS flow ranging from the minimum DNB flow of 374,880 gpm to a maximum flow of 398,850 gpm. The maximum flow value is based on no tube plugging, a 2.5% uncertainty, and the conservative assumption that all of the SG tube walls are at the minimum tube wall thickness.
accumulation. A nominal blowdown of 5% was used.
    "   A single failure of one train of the Emergency Feedwater Initiation and Control (EFIC) system was assumed as the worse case single failure. Therefore, only one of the two emergency feedwater (EFW) pumps was assumed to be available to provide flow to the SGs. The EFW temperature was modeled as 120 *F. The EFIC system contains Feed Only Good Generator (FOGG) logic, thus all EFW was provided to the unaffected SG.
* Steam generator tube plugging of 5% was modeled.
 
Controlled Document A
AR EVA                                                                                         ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                               Revision 0 Sensitivity Studies                                                                                   Page 11
* No operator actions were credited.
    "   No Integrated Control System (ICS) actions were credited.
Key input parameters modeled in the sensitivity studies that are different from the FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR include:
* The sensitivity studies considered power levels ranging from 60% to 100.4% of the EPU rated thermal power level (3014 MWt). The sensitivity demonstrates that the peak RCS pressure is much less at lower power levels, so evaluations below 60% were not required.
* The sensitivity studies considered a Tave range of 582 +/- 3 *F, allowing for an uncertainty of up to 3 'F.
* The sensitivity studies considered hot leg pressure ranging from the minimum allowed value of 2078.7 psia to a maximum value of 2244.7 psia, which is 25 psi above the setpoint for opening the pressurizer spray valves to allow for uncertainty.
    "   The sensitivity studies considered RCS flow ranging from the minimum DNB flow of 374,880 gpm to a maximum flow of 398,850 gpm. The maximum flow value is based on no tube plugging, a 2.5% uncertainty, and the conservative assumption that all of the SG tube walls are at the minimum tube wall thickness.
* The sensitivity studies considered initial pressurizer level ranging from 240 inches to 290 inches, which is the maximum pressurizer level currently allowed for CR-3. A higher pressurizer level is more limiting, so levels below 240 inches were not evaluated.
* The sensitivity studies considered initial pressurizer level ranging from 240 inches to 290 inches, which is the maximum pressurizer level currently allowed for CR-3. A higher pressurizer level is more limiting, so levels below 240 inches were not evaluated.
* The sensitivity studies evaluated the effect of time in cycle on the FWLB transient including end of cycle (EOC) typical reactivity coefficients (DTC = -2.00 x 10-5 Ak/k/0 F and MTC = -4.0 x 10-4 Aklk/°F).* The sensitivity studies evaluated initial SG levels ranging from 50 %OR to 95 %OR.* The sensitivity studies evaluated initial turbine header pressures in the range of 930 +/- 50 psia.* The sensitivity studies evaluated the FWLB transient with and without a LOOP. When modeled, the LOOP occurs at the time of turbine trip because a LOOP at the start of the event is less limiting.* The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR considered a high RCS pressure reactor trip setpoint of 2445.45 psia. This trip setpoint is based on the conservative assumption that the containment pressure is at the maximum allowed pressure (55 psig) by the time the trip setpoint is reached following a FWLB. A more realistic evaluation of containment pressure following a secondary side pipe break demonstrated that the containment pressure increases by less than 29.1 psi by the time the high RCS pressure trip setpoint is reached in a FWLB transient.
* The sensitivity studies evaluated the effect of time in cycle on the FWLB 0
Therefore, the sensitivity studies are based on a high RCS pressure setpoint of 2420 psia.* The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled a 1.0 %Ak/k SDM requirement at hot zero power (HZP). The Modes 1 and 2 minimum SDM requirement is being increased to 1.3 %Aklk for the CR-3 EPU. Therefore, the sensitivity studies are based on the EPU SDM requirement of 1.3 %Ak/k at HZP.
transient including end of cycle (EOC) typical reactivity coefficients (DTC = -2.00 x 10-5 Ak/k/ F and MTC = -4.0 x 10-4 Aklk/°F).
Controfled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
* The sensitivity studies evaluated initial SG levels ranging from 50 %OR to 95 %OR.
Revision 0 Page 12 The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled the EFW flow as 550 gpm (total) occurring with a 60-second delay after the low SG level initiation setpoint.The CR-3 EPU loss of feedwater (LOFW) analysis in Section 2.8.5.2.3 of the CR-3 EPU LAR requires a minimum EFW flow of 660 gpm and a 40-second delay. Therefore, the sensitivity studies are based on a minimum EFW flow of 660 gpm and a 40-second delay after the low SG level initiation setpoint for consistency with the CR-3 EPU LOFW analyses.
* The sensitivity studies evaluated initial turbine header pressures in the range of 930 +/- 50 psia.
Controlled Document A ARE VA ANP-3114(NP)
* The sensitivity studies evaluated the FWLB transient with and without a LOOP. When modeled, the LOOP occurs at the time of turbine trip because a LOOP at the start of the event is less limiting.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 13 4.0 RESULTS 4.1 Base Case for Sensitivity Studies As identified in Section 3.0 of this report, several of the key input assumptions in the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR contained excess conservatism.
* The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR considered a high RCS pressure reactor trip setpoint of 2445.45 psia. This trip setpoint is based on the conservative assumption that the containment pressure is at the maximum allowed pressure (55 psig) by the time the trip setpoint is reached following a FWLB. A more realistic evaluation of containment pressure following a secondary side pipe break demonstrated that the containment pressure increases by less than 29.1 psi by the time the high RCS pressure trip setpoint is reached in a FWLB transient.
These assumptions, as well as some details in the model, were modified prior to performing the sensitivity studies. In particular, the following input assumptions were changed: 1. The minimum EFW flow of 550 gpm with a 60-second delay time after the low SG level initiation setpoint is reached was changed to a minimum EFW flow of 660 gpm with a 40-second minimum delay time. This change makes the FWLB analysis consistent with the requirements of the LOFW transient.
Therefore, the sensitivity studies are based on a high RCS pressure setpoint of 2420 psia.
Note that the minimum EFW flow is based on the limiting single failure assumption that only one of the two EFW pumps is available to provide flow to the SGs.2. The SDM requirement was increased from 1.0 %Ak/k to 1.3 %Ak/k at HZP with the maximum worth control rod removed from the core. The Modes 1 and 2 minimum shutdown margin requirement is being increased to 1.3 %Ak/k for the EPU.3. The RPS high RCS pressure trip setpoint was reduced from 2445.45 psia to 2420 psia.Evaluations determined that a setpoint of 2420 psia continues to conservatively account for elevated pressure that may exist inside containment post-FWLB at the time that the reactor trip setpoint is reached.4. More detailed calculations of the form loss in the pressurizer surge line as a function of surge line flow rate were incorporated into the FWLB model.5. A more detailed calculation of the reverse form loss through the MFW nozzles was performed.
* The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled a 1.0 %Ak/k SDM requirement at hot zero power (HZP). The Modes 1 and 2 minimum SDM requirement is being increased to 1.3 %Aklk for the CR-3 EPU. Therefore, the sensitivity studies are based on the EPU SDM requirement of 1.3 %Ak/k at HZP.
The results of the calculation were incorporated into the FWLB model.6. A preliminary sensitivity study of initial SG inventory determined that the peak RCS pressure is highest for an initial SG level of 80 %OR. Therefore, the initial SG level was changed to 80 %OR.The peak RCS pressure for the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR is 2896.20 psia. The FWLB transient described in Section 2.8.5.2.4 of the CR-3 EPU LAR was re-evaluated with the changes described above. The resulting peak RCS pressure was 2829.42 psia. Unless otherwise stated, the model resulting in a peak RCS pressure of 2829.42 psia is used as the base case for sensitivity studies described in this report. The base case targets the following initial conditions:
 
* 2170 psia hot leg pressure* Minimum RCS flow of 374,880 gpm* 100.4% of 3014 MWt 0 Beginning of cycle typical parameters (MTC = 0.0 x 10-4 Ak/k/OF, DTC = -1.30 x 10-5 Ak/k/OF, Peff = 0.0070, Fuel Temperature  
Controfled Document A
-1400 OF)* Taveof582  
AREVA ANP-3114(NP)
°F* Pressurizer indicated level of 240 inches* SG level of 80 %OR a No LOOP* Double-ended guillotine break in the main feedwater line shortly before the line splits into two smaller branches that feed the SG (see Figure 4-3).
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                 Page 12 The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled the EFW flow as 550 gpm (total) occurring with a 60-second delay after the low SG level initiation setpoint.
Controfled Document A AREVA ANP-3114(NP)
The CR-3 EPU loss of feedwater (LOFW) analysis in Section 2.8.5.2.3 of the CR-3 EPU LAR requires a minimum EFW flow of 660 gpm and a 40-second delay. Therefore, the sensitivity studies are based on a minimum EFW flow of 660 gpm and a 40-second delay after the low SG level initiation setpoint for consistency with the CR-3 EPU LOFW analyses.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 14 4.2 RCS Pressure Sensitivity This section presents the results of the RCS pressure sensitivity study. The RCS pressure sensitivity starts from the base case (nominal RCS pressure) and changes the initial hot leg pressure.
 
The peak RCS pressure and reactor trip times from the RCS pressure sensitivity study are presented in Table 4-1.The RCS pressure sensitivity study demonstrates that the time of reactor trip during a FWLB transient is directly affected by the initial RCS pressure.
Controlled Document A
For cases evaluated near the nominal hot leg pressure (i.e.2170 psia +/- 30 psia), the change in the time of reactor trip does not significantly affect the increase in RCS pressure that occurs after reactor trip. Consequently, the peak RCS pressure for each case analyzed near the nominal hot leg pressure is within 5 psi of the other cases.In cases that are initialized further away from the nominal hot leg pressure (i.e. 2078.7 psia and 2244.7 psia), the change in the time of reactor trip is more significant.
ARE VA                                                                                         ANP-3114(NP)
The transient progression during the time leading up to reactor trip for these cases leads to a lower peak RCS pressure than the case evaluated at the nominal hot leg pressure.Based on the RCS pressure sensitivity study, setting the initial RCS pressure to the nominal value is appropriate for evaluating the FWLB transient.
CR-3 EPU Feedwater Line Break Analysis                                                               Revision 0 Sensitivity Studies                                                                                   Page 13 4.0       RESULTS 4.1           Base Case for Sensitivity Studies As identified in Section 3.0 of this report, several of the key input assumptions in the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR contained excess conservatism. These assumptions, as well as some details in the model, were modified prior to performing the sensitivity studies. In particular, the following input assumptions were changed:
Table 4-1: RCS Pressure Sensitivity Results Controlled Document A AREVA ANP-3114(NP)
: 1. The minimum EFW flow of 550 gpm with a 60-second delay time after the low SG level initiation setpoint is reached was changed to a minimum EFW flow of 660 gpm with a 40-second minimum delay time. This change makes the FWLB analysis consistent with the requirements of the LOFW transient. Note that the minimum EFW flow is based on the limiting single failure assumption that only one of the two EFW pumps is available to provide flow to the SGs.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 15 4.3 RCS Flow Sensitivity This section presents the results of the RCS flow sensitivity study. The RCS flow sensitivity starts from the base case (minimum RCS flow) and changes the initial RCS flow to the maximum value. Establishing steady-state conditions at higher RCS flow will result in a change in Tave, the SG pressure, the SG inventory, or a combination of these parameters.
: 2. The SDM requirement was increased from 1.0 %Ak/k to 1.3 %Ak/k at HZP with the maximum worth control rod removed from the core. The Modes 1 and 2 minimum shutdown margin requirement is being increased to 1.3 %Ak/k for the EPU.
The RCS flow sensitivity maintains a consistent SG inventory for all cases and evaluates one case where only Tave changes and one case where only the SG pressure changes. The peak RCS pressure and reactor trip times from the RCS flow sensitivity study are presented in Table 4-2.The RCS flow sensitivity study shows that the RCS flow does not significantly change the hot leg pressure during the transient, and therefore does not affect the time of reactor trip. However, since the hot leg pressure is the same and the RCS flow is higher, the AP from the hot leg to the location of the peak RCS pressure (i.e. at the bottom of the reactor vessel) increases.
: 3. The RPS high RCS pressure trip setpoint was reduced from 2445.45 psia to 2420 psia.
Consequently, the peak RCS pressure is [ ] higher for cases evaluated at the maximum RCS flow.Based on the RCS flow sensitivity study, the peak RCS pressure for a FWLB transient should be evaluated assuming maximum RCS flow. This would not be conservative for evaluating departure from nucleate boiling (DNB). However, as explained in Section 2.8.5.2.4.2 of the CR-3 EPU LAR, since the reactor coolant pumps (RCPs) remain operating, the RCS fluid remains subcooled, and the core power remains less than 112% throughout the FWLB analysis, it is concluded that the minimum DNB ratio would remain above the applicable correlation limit without performing an explicit analysis for FWLB. Therefore, the RCS flow for the FWLB transient should be biased to challenge the peak RCS pressure acceptance criteria.Table 4-2: RCS Flow Sensitivity Results Controled Document A AREVA ANP-3114(NP)
Evaluations determined that a setpoint of 2420 psia continues to conservatively account for elevated pressure that may exist inside containment post-FWLB at the time that the reactor trip setpoint is reached.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 16 4.4 Power Level Sensitivity This section presents the results of the power level sensitivity study. The base case is evaluated at 100.4% of the proposed EPU power level. The power level sensitivity study compares the base case to evaluations performed at 95.4 %FP, 80 %FP, and 60 %FP. Table 4-3 documents the steady-state conditions achieved for each power level. The peak RCS pressure and reactor trip times from the FWLB power level sensitivity study are presented in Table 4-4.The FWLB results show that as the power level decreases, the lower initial SG inventory results in an earlier reactor trip. The earlier reactor trip in conjunction with a lower initial core power level causes the peak RCS pressure to be significantly lower as the power level decreases.
: 4. More detailed calculations of the form loss in the pressurizer surge line as a function of surge line flow rate were incorporated into the FWLB model.
The peak RCS pressure is less than 110% of the RCS design pressure (< 2764.7 psia) for initial power levels of 80 %FP and below.Given the significant reduction in peak RCS pressure observed at 80 and 60 %FP, it was concluded that power levels <60 %FP did not need to be evaluated.
: 5. A more detailed calculation of the reverse form loss through the MFW nozzles was performed.
CR-3 is allowed to operate with a positive MTC at lower power levels. As discussed in Section 2.8.5.4.1.2 of the CR-3 EPU LAR, the most positive MTC that will be allowed for EPU core designs is +7.5 x 10-5 Ak/k/&deg;F. The FWLB power level sensitivity study included evaluations at 95.4 %FP, 80 %FP, and 60 %FP with an MTC of +7.5 x 10`5 Ak/k/&deg;F. A positive MTC resulted in a higher peak RCS pressure for each power level analyzed; however, the base case (100.4 %FP, 0.0 x 10-5 Aklk/&deg;F) remained the limiting case.Based on the power level sensitivity study, the FWLB transient should be evaluated at 100.4 %FP.
The results of the calculation were incorporated into the FWLB model.
Controfled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivitv Studies ANP-3114(NP)
: 6. A preliminary sensitivity study of initial SG inventory determined that the peak RCS pressure is highest for an initial SG level of 80 %OR. Therefore, the initial SG level was changed to 80 %OR.
Revision 0 Page 17 Table 4-3: Steady-State Results for Power Level Sensitivity Table 4-4: Power Level Sensitivity Results Controfled Document A ARN EVA ANP-3114(NP)
The peak RCS pressure for the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR is 2896.20 psia. The FWLB transient described in Section 2.8.5.2.4 of the CR-3 EPU LAR was re-evaluated with the changes described above. The resulting peak RCS pressure was 2829.42 psia. Unless otherwise stated, the model resulting in a peak RCS pressure of 2829.42 psia is used as the base case for sensitivity studies described in this report. The base case targets the following initial conditions:
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 18 4.5 Time in Cycle Sensitivity This section presents the results of the time in cycle sensitivity study. The base case is evaluated at conservative BOC conditions.
* 2170 psia hot leg pressure
The MTC (a constant 0.0 x 10-5 Ak/k/OF) is the most positive MTC allowed at full power. The DTC is a value (-1.3 x 10-5 Ak/k/&deg;F) that is more positive than expected for EPU fuel cycle designs (see Table 2.8.2-2 of the CR-3 EPU LAR). The fuel temperature  
* Minimum RCS flow of 374,880 gpm
(-1400 OF) is representative of BOC conditions at the EPU power level. Finally, the effective delayed neutron fraction (Peff) is a BOC typical value (0.0070).
* 100.4% of 3014 MWt 0   Beginning of cycle typical parameters (MTC = 0.0 x 10-4 Ak/k/OF, DTC = -1.30 x 10-5 Ak/k/OF, Peff = 0.0070, Fuel Temperature - 1400 OF)
The rod worth used in the base case is determined to be the minimum required rod worth needed to meet the SDM definition for the modeled MTC, DTC, and fuel temperature.
* Taveof582 &deg;F
The time in cycle sensitivity study evaluates the effects of changing MTC, DTC, fuel temperature, and P3eff on the FWLB transient.
* Pressurizer indicated level of 240 inches
Table 4-5 presents the key results from the FWLB time in cycle sensitivity study.The base case utilizes an MTC that does not change with moderator temperature or density. Therefore, the time in cycle sensitivity analysis compared the base case to cases using constant MTC values of-10.0 x 10-5 Ak/k/&deg;F and -20.0 x 10-5 Ak/k/&deg;F. When a constant MTC is used, the thermal power level of the core does not change significantly prior to reactor trip. Consequently, the time of reactor trip is approximately the same for all three cases evaluated with a constant MTC. Although the pre-trip transient behavior is approximately the same in all three cases, the results show that a more negative MTC resulted in a lower peak RCS pressure.
* SG level of 80 %OR a   No LOOP
This occurs because a more negative MTC requires more rod worth in order for the SDM requirement to be met. The additional rod worth results in a faster reduction in the core thermal power shortly after trip, which in turn reduces the peak RCS pressure.
* Double-ended guillotine break in the main feedwater line shortly before the line splits into two smaller branches that feed the SG (see Figure 4-3).
The trend versus MTC is clear, so evaluations were not performed for constant MTCs that are more negative than -20.0 x 10-5 Ak/k/&deg;F.The time in cycle sensitivity study also includes cases that allow the moderator reactivity feedback to change with moderator density. The sensitivity study considered five reactivity versus moderator density curves. The MTCs from the curves at initial hot full power conditions are 0.0 x 10.5 Ak/k/0 F, -10.0 x 10-5 Ak/k/0 F, -20.0 x 10-5 Ak/k/0 F, -30.0 x 10-5 Ak/k/&deg;F, and -40.0 x 10.5 Ak/k/&deg;F. Table 2.8.2-2 of the CR-3 EPU LAR lists the expected EPU most negative MTC limit as -37.5 x 10-5 Ak/k/&deg;F, so a -40 x 10.5 Ak/k/&deg;F MTC bounds typical EPU cycles. The sensitivity study performed using different reactivity versus moderator density curves demonstrates that as the MTC becomes more negative, the peak thermal power increases and the time to reactor trip decreases.
 
However, in all of the cases the peak thermal power remained well below 112 %FP. The increase in thermal power that occurs prior to reactor trip is more than offset by the increased rod worth that is needed to meet the SDM definition at more negative MTCs. Therefore, as the MTC becomes more negative the peak RCS pressure decreases.
Controfled Document A
The time in cycle sensitivity study included a case to evaluate the effect of DTC. The case is evaluated with an MTC that is representative of EOC (i.e. -40 x 10-5 Ak/k/&deg;F).
AREVA ANP-3114(NP)
The DTC sensitivity study considers values of -1.30 x 10.5 Ak/k/&deg;F and -2.00 x 10.' Ak/k/IF, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The DTC comparison shows that a more negative DTC causes the maximum thermal power to decrease because of the additional negative reactivity feedback.Furthermore, the more negative DTC requires more rod worth to meet the minimum SDM requirement.
CR-3 EPU Feedwater Line Break Analysis                                                               Revision 0 Sensitivity Studies                                                                                   Page 14 4.2           RCS Pressure Sensitivity This section presents the results of the RCS pressure sensitivity study. The RCS pressure sensitivity starts from the base case (nominal RCS pressure) and changes the initial hot leg pressure. The peak RCS pressure and reactor trip times from the RCS pressure sensitivity study are presented in Table 4-1.
These two factors result in a lower peak RCS pressure for the case evaluated with a more negative DTC.The effect of fuel temperature is evaluated with reactivity coefficients that are representative of EOC. The fuel temperature sensitivity reduces the BOC typical fuel temperature  
The RCS pressure sensitivity study demonstrates that the time of reactor trip during a FWLB transient is directly affected by the initial RCS pressure. For cases evaluated near the nominal hot leg pressure (i.e.
(-1400 OF) to a fuel temperature that is representative of EOC conditions  
2170 psia +/- 30 psia), the change in the time of reactor trip does not significantly affect the increase in RCS pressure that occurs after reactor trip. Consequently, the peak RCS pressure for each case analyzed near the nominal hot leg pressure is within 5 psi of the other cases.
(-1080 OF). The fuel temperature is changed by increasing the fuel gap thermal conductance.
In cases that are initialized further away from the nominal hot leg pressure (i.e. 2078.7 psia and 2244.7 psia), the change in the time of reactor trip is more significant. The transient progression during the time leading up to reactor trip for these cases leads to a lower peak RCS pressure than the case evaluated at the nominal hot leg pressure.
The fuel temperature comparison demonstrates that the increased fuel gap thermal conductance associated with EOC fuel temperatures results in a slightly higher peak thermal Controlled Document A AR EVA ANP-3114(NP)
Based on the RCS pressure sensitivity study, setting the initial RCS pressure to the nominal value is appropriate for evaluating the FWLB transient.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 19 power. In addition, a lower initial fuel temperature means that less rod worth is needed to meet the minimum SDM requirement because the initial fuel temperature is closer to the HZP temperature.
Table 4-1: RCS Pressure Sensitivity Results
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                 Page 15 4.3         RCS Flow Sensitivity This section presents the results of the RCS flow sensitivity study. The RCS flow sensitivity starts from the base case (minimum RCS flow) and changes the initial RCS flow to the maximum value. Establishing steady-state conditions at higher RCS flow will result in a change in Tave, the SG pressure, the SG inventory, or a combination of these parameters. The RCS flow sensitivity maintains a consistent SG inventory for all cases and evaluates one case where only Tave changes and one case where only the SG pressure changes. The peak RCS pressure and reactor trip times from the RCS flow sensitivity study are presented in Table 4-2.
The RCS flow sensitivity study shows that the RCS flow does not significantly change the hot leg pressure during the transient, and therefore does not affect the time of reactor trip. However, since the hot leg pressure is the same and the RCS flow is higher, the AP from the hot leg to the location of the peak RCS pressure (i.e. at the bottom of the reactor vessel) increases. Consequently, the peak RCS pressure is [         ] higher for cases evaluated at the maximum RCS flow.
Based on the RCS flow sensitivity study, the peak RCS pressure for a FWLB transient should be evaluated assuming maximum RCS flow. This would not be conservative for evaluating departure from nucleate boiling (DNB). However, as explained in Section 2.8.5.2.4.2 of the CR-3 EPU LAR, since the reactor coolant pumps (RCPs) remain operating, the RCS fluid remains subcooled, and the core power remains less than 112% throughout the FWLB analysis, it is concluded that the minimum DNB ratio would remain above the applicable correlation limit without performing an explicit analysis for FWLB. Therefore, the RCS flow for the FWLB transient should be biased to challenge the peak RCS pressure acceptance criteria.
Table 4-2: RCS Flow Sensitivity Results
 
Controled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                                 Revision 0 Sensitivity Studies                                                                                     Page 16 4.4           Power Level Sensitivity This section presents the results of the power level sensitivity study. The base case is evaluated at 100.4% of the proposed EPU power level. The power level sensitivity study compares the base case to evaluations performed at 95.4 %FP, 80 %FP, and 60 %FP. Table 4-3 documents the steady-state conditions achieved for each power level. The peak RCS pressure and reactor trip times from the FWLB power level sensitivity study are presented in Table 4-4.
The FWLB results show that as the power level decreases, the lower initial SG inventory results in an earlier reactor trip. The earlier reactor trip in conjunction with a lower initial core power level causes the peak RCS pressure to be significantly lower as the power level decreases. The peak RCS pressure is less than 110% of the RCS design pressure (< 2764.7 psia) for initial power levels of 80 %FP and below.
Given the significant reduction in peak RCS pressure observed at 80 and 60 %FP, it was concluded that power levels <60 %FP did not need to be evaluated.
CR-3 is allowed to operate with a positive MTC at lower power levels. As discussed in Section 2.8.5.4.1.2 of the CR-3 EPU LAR, the most positive MTC that will be allowed for EPU core designs is +7.5 x 10-5 Ak/k/&deg;F. The FWLB power level sensitivity study included evaluations at 95.4 %FP, 80 %FP, and 60 %FP with an MTC of +7.5 x 10`5 Ak/k/&deg;F. A positive MTC resulted in a higher peak RCS pressure for each power level analyzed; however, the base case (100.4 %FP, 0.0 x 10-5 Aklk/&deg;F) remained the limiting case.
Based on the power level sensitivity study, the FWLB transient should be evaluated at 100.4 %FP.
 
Controfled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                       Revision 0 Sensitivitv Studies                                                             Page 17 Table 4-3: Steady-State Results for Power Level Sensitivity Table 4-4: Power Level Sensitivity Results
 
Controfled Document A
ARN EVA                                                                                         ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                               Revision 0 Sensitivity Studies                                                                                     Page 18 4.5           Time in Cycle Sensitivity This section presents the results of the time in cycle sensitivity study. The base case is evaluated at conservative BOC conditions. The MTC (a constant 0.0 x 10-5 Ak/k/OF) is the most positive MTC allowed at full power. The DTC is a value (-1.3 x 10-5 Ak/k/&deg;F) that is more positive than expected for EPU fuel cycle designs (see Table 2.8.2-2 of the CR-3 EPU LAR). The fuel temperature (-1400 OF) is representative of BOC conditions at the EPU power level. Finally, the effective delayed neutron fraction (Peff) is a BOC typical value (0.0070). The rod worth used in the base case is determined to be the minimum required rod worth needed to meet the SDM definition for the modeled MTC, DTC, and fuel temperature. The time in cycle sensitivity study evaluates the effects of changing MTC, DTC, fuel temperature, and P3eff on the FWLB transient. Table 4-5 presents the key results from the FWLB time in cycle sensitivity study.
The base case utilizes an MTC that does not change with moderator temperature or density. Therefore, the time in cycle sensitivity analysis compared the base case to cases using constant MTC values of
-10.0 x 10-5 Ak/k/&deg;F and -20.0 x 10-5 Ak/k/&deg;F. When a constant MTC is used, the thermal power level of the core does not change significantly prior to reactor trip. Consequently, the time of reactor trip is approximately the same for all three cases evaluated with a constant MTC. Although the pre-trip transient behavior is approximately the same in all three cases, the results show that a more negative MTC resulted in a lower peak RCS pressure. This occurs because a more negative MTC requires more rod worth in order for the SDM requirement to be met. The additional rod worth results in a faster reduction in the core thermal power shortly after trip, which in turn reduces the peak RCS pressure. The trend versus MTC is clear, so evaluations were not performed for constant MTCs that are more negative than -20.0 x 10-5 Ak/k/&deg;F.
The time in cycle sensitivity study also includes cases that allow the moderator reactivity feedback to change with moderator density. The sensitivity study considered five reactivity versus moderator 0        density curves. The MTCs from the curves at initial hot full power conditions are 0.0 x 10.5 Ak/k/ F, -10.0 x 10-5 Ak/k/0 F, -20.0 x 10-5 Ak/k/ 0F, -30.0 x 10-5 Ak/k/&deg;F, and -40.0 x 10.5 Ak/k/&deg;F. Table 2.8.2-2 of the CR-3 EPU LAR lists the expected EPU most negative MTC limit as -37.5 x 10-5 Ak/k/&deg;F, so a -40 x 10.5 Ak/k/&deg;F MTC bounds typical EPU cycles. The sensitivity study performed using different reactivity versus moderator density curves demonstrates that as the MTC becomes more negative, the peak thermal power increases and the time to reactor trip decreases. However, in all of the cases the peak thermal power remained well below 112 %FP. The increase in thermal power that occurs prior to reactor trip is more than offset by the increased rod worth that is needed to meet the SDM definition at more negative MTCs. Therefore, as the MTC becomes more negative the peak RCS pressure decreases.
The time in cycle sensitivity study included a case to evaluate the effect of DTC. The case is evaluated with an MTC that is representative of EOC (i.e. -40 x 10-5 Ak/k/&deg;F). The DTC sensitivity study considers values of -1.30 x 10.5 Ak/k/&deg;F and -2.00 x 10.' Ak/k/IF, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The DTC comparison shows that a more negative DTC causes the maximum thermal power to decrease because of the additional negative reactivity feedback.
Furthermore, the more negative DTC requires more rod worth to meet the minimum SDM requirement.
These two factors result in a lower peak RCS pressure for the case evaluated with a more negative DTC.
The effect of fuel temperature is evaluated with reactivity coefficients that are representative of EOC. The fuel temperature sensitivity reduces the BOC typical fuel temperature (-1400 OF) to a fuel temperature that is representative of EOC conditions (-1080 OF). The fuel temperature is changed by increasing the fuel gap thermal conductance. The fuel temperature comparison demonstrates that the increased fuel gap thermal conductance associated with EOC fuel temperatures results in a slightly higher peak thermal
 
Controlled Document A
AR EVA                                                                                         ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                               Revision 0 Sensitivity Studies                                                                                   Page 19 power. In addition, a lower initial fuel temperature means that less rod worth is needed to meet the minimum SDM requirement because the initial fuel temperature is closer to the HZP temperature.
However, the lower initial fuel temperature also results in less heat stored in the fuel that must be removed following reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical fuel temperatures.
However, the lower initial fuel temperature also results in less heat stored in the fuel that must be removed following reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical fuel temperatures.
The effect of P3eff is evaluated with an MTC, DTC, and fuel temperature that are representative of EOC.The P3eff sensitivity study considers values of 0.0045 and 0.0070, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The P3eff comparison shows that smaller values of 3eff result in a faster positive reactivity response prior to trip, which increases the maximum thermal power. However, smaller values of 13eff also result in a faster negative reactivity response as the control rods are inserted.The effect of P3eff on the post-trip portion of the transient has more effect on the peak RCS pressure,, which occurs a few seconds after reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical values of P3eff.The sensitivity studies on time in cycle demonstrated that the peak RCS pressure in a FWLB transient is higher when BOC typical values are modeled for MTC, DTC, fuel temperature, and Peff.Table 4-5: Time in Cycle Sensitivity Results Controled Document A AR EVA ANP-3114(NP)
The effect of P3eff is evaluated with an MTC, DTC, and fuel temperature that are representative of EOC.
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 20 4.6 Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity This section presents the results of the SG inventory sensitivity study, which varies RCS Tave, SG pressure, and SG level to achieve different initial SG inventories.
The P3eff sensitivity study considers values of 0.0045 and 0.0070, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The P3eff comparison shows that smaller values of 3eff result in a faster positive reactivity response prior to trip, which increases the maximum thermal power. However, smaller values of 13eff also result in a faster negative reactivity response as the control rods are inserted.
The SG inventory sensitivity study starts from the base case. The RCS flow is set to a maximum value because the evaluations summarized in Section 4.3 determined that a maximum RCS flow results in a higher peak RCS pressure than a case at a minimum DNB flow. The initial RCS pressure, initial power level, and time in cycle evaluated in the SG inventory sensitivity study match the base case because the values used in the base case were shown to be the limiting conditions.
The effect of P3eff on the post-trip portion of the transient has more effect on the peak RCS pressure,,
The RCS Tave, SG pressure, and SG level are varied within the following spectrum of initial conditions: " RCS Tave in the range of 582 'F +/- 3 *F" Turbine header pressure in the range of 930 psia +/- 50 psi" SG level ranging from 50 %OR to 95 %OR Although the above ranges are considered, every possible combination cannot realistically be achieved.For a given Tave, the minimum level that can be achieved in the SG is affected by the orifice plate in the SG downcomer and the initial SG pressure.
which occurs a few seconds after reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical values of P3eff.
Therefore, the minimum SG levels considered for a given RCS Tave and SG pressure combination is either 50 %OR or the minimum level when the orifice plate is fully opened. Similarly, the maximum SG pressure that can be modeled for a given RCS Tave is the pressure that results in a SG level of 95 %OR when the orifice plate is fully open.Table 4-6 summarizes the steady-state SG inventory and the key FWLB transient results for each of the 34 cases that were evaluated to consider the effects of RCS Tave, SG pressure, and SG level on the FWLB transient.
The sensitivity studies on time in cycle demonstrated that the peak RCS pressure in a FWLB transient is higher when BOC typical values are modeled for MTC, DTC, fuel temperature, and Peff.
The results clearly show that as the SG inventory increases, the time to reactor trip increases.
Table 4-5: Time in Cycle Sensitivity Results
This is demonstrated by Figure 4-1. The longer time to reactor trip means that cases starting with more initial SG inventory also discharge more inventory out of the break by the time reactor trip is reached. This behavior leads to relatively small differences in the affected SG inventory when reactor trip occurs. Since each case has approximately the same inventory in the affected SG at the time of reactor trip, the RCS pressure increase shortly after reactor trip is close to the same for each case considered.
 
Furthermore, since the reactor trip is initiated by a high RCS pressure trip function, each case is at the same hot leg pressure when the reactor trip occurs. Consequently, the peak RCS pressure in a FWLB transient is not sensitive to RCS Tave, SG pressure, SG level, or SG inventory.
Controled Document A
This is demonstrated by the similarity in the peak RCS pressure results in Table 4-6 and Figure 4-2. The highest peak RCS pressure for any of the cases considered is 2842.15 psia at an RCS Tave of 585 'F, a turbine header pressure of 940 psia, and a SG level of 80 %OR.Although the peak RCS pressure is not sensitive to changes in RCS Tave, SG pressure, SG level, or SG inventory, these parameters will affect the mass and energy released to containment.
AR EVA ANP-3114(NP)
Cases with higher initial SG inventory would release more mass from the SG side of the break and would delay reactor trip allowing more mass from the MFW side of the break to reach containment.
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                 Page 20 4.6           Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity This section presents the results of the SG inventory sensitivity study, which varies RCS Tave, SG pressure, and SG level to achieve different initial SG inventories. The SG inventory sensitivity study starts from the base case. The RCS flow is set to a maximum value because the evaluations summarized in Section 4.3 determined that a maximum RCS flow results in a higher peak RCS pressure than a case at a minimum DNB flow. The initial RCS pressure, initial power level, and time in cycle evaluated in the SG inventory sensitivity study match the base case because the values used in the base case were shown to be the limiting conditions. The RCS Tave, SG pressure, and SG level are varied within the following spectrum of initial conditions:
Conversely, minimizing the initial SG inventory will minimize the mass and energy released to containment.
      "   RCS Tave in the range of 582 'F +/- 3 *F
Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
      "   Turbine header pressure in the range of 930 psia +/- 50 psi
Revision 0 Page 21 Table 4-6: SG Inventory Sensitivity Results Controled Document A AR EVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
      "   SG level ranging from 50 %OR to 95 %OR Although the above ranges are considered, every possible combination cannot realistically be achieved.
Revision 0 Page 22 Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
For a given Tave, the minimum level that can be achieved in the SG is affected by the orifice plate in the SG downcomer and the initial SG pressure. Therefore, the minimum SG levels considered for a given RCS Tave and SG pressure combination is either 50 %OR or the minimum level when the orifice plate is fully opened. Similarly, the maximum SG pressure that can be modeled for a given RCS Tave is the pressure that results in a SG level of 95 %OR when the orifice plate is fully open.
Revision 0 Page 23-Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory Controled Document A AR EVA ANP-31 14(NP)CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 24 4.7 Pressurizer Level Sensitivity This section presents the results of the pressurizer level sensitivity study. The evaluations summarized in Sections 4.1 through 4.6 are based on an indicated pressurizer level of 240 inches, which is the nominal pressurizer level of 220 inches plus 20 inches for uncertainty.
Table 4-6 summarizes the steady-state SG inventory and the key FWLB transient results for each of the 34 cases that were evaluated to consider the effects of RCS Tave, SG pressure, and SG level on the FWLB transient. The results clearly show that as the SG inventory increases, the time to reactor trip increases. This is demonstrated by Figure 4-1. The longer time to reactor trip means that cases starting with more initial SG inventory also discharge more inventory out of the break by the time reactor trip is reached. This behavior leads to relatively small differences in the affected SG inventory when reactor trip occurs. Since each case has approximately the same inventory in the affected SG at the time of reactor trip, the RCS pressure increase shortly after reactor trip is close to the same for each case considered.
The pressurizer level sensitivity study evaluates pressurizer levels as high as 290 inches, which is the maximum pressurizer level currently allowed for CR-3.Six of the cases evaluated in Section 4.6 were selected for evaluation in the pressurizer level sensitivity study. The cases chosen were selected to span the ranges of conditions evaluated in Section 4.6. The cases chosen also include the cases in Table 4-6 that had the highest peak RCS pressure.
Furthermore, since the reactor trip is initiated by a high RCS pressure trip function, each case is at the same hot leg pressure when the reactor trip occurs. Consequently, the peak RCS pressure in a FWLB transient is not sensitive to RCS Tave, SG pressure, SG level, or SG inventory. This is demonstrated by the similarity in the peak RCS pressure results in Table 4-6 and Figure 4-2. The highest peak RCS pressure for any of the cases considered is 2842.15 psia at an RCS Tave of 585 'F, a turbine header pressure of 940 psia, and a SG level of 80 %OR.
The peak RCS pressure and reactor trip times from the pressurizer level sensitivity study are presented in Table 4-7.The pressurizer level sensitivity study demonstrated that for each case, a higher initial pressurizer level causes the RCS pressure to respond more quickly to changes in the RCS temperatures because of the smaller available steam space. Consequently, the reactor trip occurs sooner and the peak RCS pressure is higher when the initial pressurizer level is higher. The highest peak RCS pressure for any of the cases considered with a pressurizer level of 290 inches is 2861.20 psia.In addition to evaluating the peak RCS pressure, the pressurizer level sensitivity study also evaluated the temperature of liquid in the pressurizer for those cases that predicted liquid relief out of the PSVs. The pressurizer sensitivity study verified that if liquid is passed by the PSVs, the liquid remains above 600 OF.The sensitivity study on pressurizer level demonstrated that a higher initial pressurizer level is more limiting for the FWLB transient.
Although the peak RCS pressure is not sensitive to changes in RCS Tave, SG pressure, SG level, or SG inventory, these parameters will affect the mass and energy released to containment. Cases with higher initial SG inventory would release more mass from the SG side of the break and would delay reactor trip allowing more mass from the MFW side of the break to reach containment. Conversely, minimizing the initial SG inventory will minimize the mass and energy released to containment.
Table 4-7: Pressurizer Level Sensitivity Results ControDled Document A AREVA ANP-3114(NP)
 
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 25 4.8 Loss of Offsite Power This section presents the results of the LOOP sensitivity study. The evaluations in Sections 4.1 through 4.7 are based on offsite power remaining available throughout the FWLB transient.
Controlled Document A
The LOOP evaluation determines if the FWLB transient results are more limiting if offsite power is lost during the transient.
AREVA ANP-3114(NP)
If the LOOP occurs at the time that the break opens, the loss of offsite power will result in a reactor scram, which would reduce the energy added to the RCS by the core. Therefore, a LOOP at event initiation is less limiting than if a LOOP does not occur. On the other hand, if the LOOP is modeled to occur at the time of turbine trip, which is modeled to occur coincident with reactor trip, the LOOP will not affect the energy added to the RCS by the core. Furthermore, a LOOP at turbine trip causes the RCS flow to decrease just as the RCS pressure is approaching the maximum value. Therefore, a LOOP at turbine trip is evaluated as the limiting time for a LOOP to occur.The LOOP evaluation considers the six cases from Section 4.7, but with a LOOP modeled at turbine trip.The results with and without LOOP for each of the six cases are summarized in Table 4-8.The LOOP evaluation demonstrates that in each case, the peak RCS pressure is higher when a LOOP occurs at turbine trip. The highest peak RCS pressure (2878.38 psia) continues to occur at the same conditions as the case with no LOOP (Tave of 585 OF, a turbine header pressure of 940 psia, and a SG level of 80 %OR). The LOOP evaluation also confirmed that liquid passed by the PSVs remains above 600 OF.Based on the LOOP evaluation, the FWLB transient should be evaluated with a LOOP occurring at the time of turbine trip.Table 4-8: LOOP Evaluation Results Controlled Document A AR EVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                             Revision 0 Sensitivity Studies                                                   Page 21 Table 4-6: SG Inventory Sensitivity Results
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 26 4.9 Break Size Sensitivity This section presents the results of the break size sensitivity study. The evaluations in Sections 4.1 through 4.8 are based on a double-ended guillotine break of the largest main feedwater (MFW) pipe near the junction where the largest pipe splits into two smaller pipes that continue to the SG (see Figure 4-3).The break size sensitivity study evaluates the effect of smaller break sizes at the same location.
 
The break size sensitivity study did not change the area of the MFW side of the break. Therefore, all MFW is lost to the affected SG. Only the area on the SG side of the break was reduced to determine the break size sensitivity.
Controled Document A
The break size sensitivity study was performed at the same conditions as the limiting case identified in Section 4.8, namely: 0 Nominal RCS Pressure* Maximum RCS Flow a 100.4 %FP* BOC a 585 'F RCSTave* 940 psia Turbine Header Pressure& 80%ORSG Level* 290 Inch Indicated Pressurizer Level* LOOP occurring at Turbine Trip The model was updated to include a detailed MFW system model from the booster pumps to the SGs.The MFW system model was set to isolate MFW to the unaffected steam generator at the start of the transient for consistency with previous FWLB evaluations.
AR EVA ANP-3114(NP)
Overall, the model with a simplified MFW system and the model with a detailed MFW system produced equivalent FWLB transient results for the same break size. Incorporating the detailed MFW system resulted in a slightly different peak RCS pressure (2875.31 psia versus 2878.38 psia).The CR-3 MFW system has three pipe sizes between the isolation check valve and the SGs. The largest main feedwater pipe is 18" SCH 80 (1.418 ft 2). The largest main feedwater pipe branches into two 14" SCH 80 (0.8522 ft 2) pipes. The two 14" SCH 80 pipes then feed into a total of 32 riser pipes, each of which are 3" SCH 80 (0.04587 ft?). These three pipe areas are considered as the area of the SG side of the break along with arbitrarily selected pipe areas to fully capture the behavior of peak RCS pressure versus break size. The results of the break size sensitivity study are shown in Table 4-9.The break size sensitivity study demonstrates that the peak RCS pressure is effectively the same for break sizes ranging from 0.8522 ft 2 (the area of the 14" SCH 80 pipes in the MFW system) to 1.418 ft 2 (the area of the 18" SCH 80 pipe in the MFW system). For break sizes less than 0.8522 ft 2 , the peak RCS pressure steadily decreases.
CR-3 EPU Feedwater Line Break Analysis                                     Revision 0 Sensitivity Studies                                                         Page 22 Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory     *m
Note that the highest peak RCS pressure was calculated for a 1.100 ft 2 break, but the difference in peak RCS pressure between a 1.418 ft 2 break and a 1.100 ft 2 break is only 2.6 psi. Furthermore, the CR-3 MFW system does not actually have a pipe with a 1.100 ft2 area between the isolation check valves and the SG. Therefore, evaluations based on the maximum pipe area of 1.418 ft 2 represent the limiting break area.Based on the break size sensitivity study, the limiting break area for evaluating peak RCS pressure is the full area of the largest pipe in the CR-3 MFW system between the isolation check valves and the SGs (1.418 ft 2).
 
Controled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivitv Studies ANP-3114(NP)
Controlled Document A
Revision 0 Page 27 Table 4-9: Break Size Sensitivity Results Controlled Document A AR EVA ANP-3114(NP)
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 28 4.10 Break Location Sensitivity Study This section presents the results of the break location sensitivity study. This break location sensitivity study evaluates the effects of moving the double ended guillotine break to different pipe locations.
CR-3 EPU Feedwater Line Break Analysis                                   Revision 0 Sensitivity Studies                                                         Page 23
The following locations were considered (see Figure 4-3): " The limiting break from Section 4.9, which is a break in the main feedwater pipe in SG B. The break is located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches." A break in the same location as the limiting case from Section 4.9, but occurring on SG A instead of SG B.* A break in the same pipe as the limiting case from Section 4.9, but occurring immediately after the isolation check valve.* A break in one of the side branches of SG B at the tee that connects the main feedwater line to the side branches.
-       Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory
The break is modeled as a double-ended guillotine break of a pipe with a 1.418 ft2 area.* A break in one of the side branches of SG B near the entrance to the SGs. The break is modeled as a double-ended guillotine break of a pipe with a 0.8522 ft 2 area.The peak RCS pressure and reactor trip times for each of the identified break locations are summarized in Table 4-10.The results in Table 4-10 show that a break in SG B is clearly more limiting than a break in SG A.The peak RCS pressure for the four break locations in SG B all result in effectively the same peak RCS pressure, but different times for reactor trip. The reactor trip time indicates how quickly the affected SG discharges inventory out of the break. The earliest reactor trip time occurs when the break is in the branch side of the tee connecting the main feedwater line to the side braches. This location allows the SG inventory to reach both sides of the 1.418 ft 2 double-ended guillotine break. Since the total effective break area is larger, the reduction in inventory occurs more quickly. However, as mentioned above, the peak RCS pressure is effectively the same as the peak RCS pressure when the break is located in the main feedwater line before the tee. Furthermore, for both break locations all of the affected SG inventory will be discharged to containment by 60 seconds and the RCS conditions at that time are approximately the same. Therefore, the FWLB transient results are effectively the same for both break locations.
 
A break in one of the side branches near the SG also allows the SG inventory to reach both sides of the double-ended guillotine break, but the break area in both directions is only 0.8522 ft 2.The net effect is that the reactor trip time is slightly (0.188 sec) longer than the case with a break in the main feed line before the tee. The calculated peak RCS pressure in both cases differs by only 0.10 psi, which is an insignificant difference.
Controled Document A
A break in the main feed line just downstream of the isolation check valves requires the longest time to reach the reactor trip setpoint.
AR EVA                                                                                         ANP-31 14(NP)
The peak RCS pressure is slightly less than the case with the break in the main feedwater line right before the tee, but the difference is negligible (2.12 psi).The break location sensitivity study confirms that the limiting break location for evaluating peak RCS pressure is a double-ended break in the main feedwater pipe in SG B, located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches.
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                   Page 24 4.7           Pressurizer Level Sensitivity This section presents the results of the pressurizer level sensitivity study. The evaluations summarized in Sections 4.1 through 4.6 are based on an indicated pressurizer level of 240 inches, which is the nominal pressurizer level of 220 inches plus 20 inches for uncertainty. The pressurizer level sensitivity study evaluates pressurizer levels as high as 290 inches, which is the maximum pressurizer level currently allowed for CR-3.
Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
Six of the cases evaluated in Section 4.6 were selected for evaluation in the pressurizer level sensitivity study. The cases chosen were selected to span the ranges of conditions evaluated in Section 4.6. The cases chosen also include the cases in Table 4-6 that had the highest peak RCS pressure. The peak RCS pressure and reactor trip times from the pressurizer level sensitivity study are presented in Table 4-7.
Revision 0 Page 29 Figure 4-3: Feedwater Line Break Locations Isolation Check Valve 18" 14" 14" SG Table 4-10: Break Location Sensitivity Study Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
The pressurizer level sensitivity study demonstrated that for each case, a higher initial pressurizer level causes the RCS pressure to respond more quickly to changes in the RCS temperatures because of the smaller available steam space. Consequently, the reactor trip occurs sooner and the peak RCS pressure is higher when the initial pressurizer level is higher. The highest peak RCS pressure for any of the cases considered with a pressurizer level of 290 inches is 2861.20 psia.
Revision 0 Page 30-4.11 Evaluation of Continued Main Feedwater to Unaffected SG The CR-3 EPU FWLB evaluations conservatively model all feedwater to the unaffected SG as being lost at the start of the event. This conservative approach simplifies the analysis because the effect of control systems on the main feedwater pump speed during the transient can be ignored. This section presents an evaluation that demonstrates the conservatism added to the analysis by not crediting feedwater.
In addition to evaluating the peak RCS pressure, the pressurizer level sensitivity study also evaluated the temperature of liquid in the pressurizer for those cases that predicted liquid relief out of the PSVs. The pressurizer sensitivity study verified that if liquid is passed by the PSVs, the liquid remains above 600 OF.
The evaluations with continued feedwater assume that the main feedwater pump speed is maintained at the initial condition value. EFIC actuation isolates feedwater or main feedwater is runback following a reactor trip. Once main feedwater is isolated or runback is.started, the analysis conservatively assumes that all main feedwater is stopped to the unaffected SG in 3.2 seconds for consistency with the LOFW analysis (Section 2.8.5.2.3.2 of the CR-3 EPU LAR).The detailed feedwater model includes the cross connect piping that exists between the booster pumps and the main feedwater pumps. Therefore, the evaluations with continued feedwater allow flow from the booster pump in loop A to feed the main feedwater pump on the broken loop if the transient predicts this behavior.
The sensitivity study on pressurizer level demonstrated that a higher initial pressurizer level is more limiting for the FWLB transient.
During normal operation, the CR-3 main feedwater system does not have a cross connect between the loops downstream of the main feedwater pumps.The FWLB evaluations with continued feedwater were performed for several break sizes. The peak RCS pressure and time of reactor trip are summarized in Table 4-11. Table 4-11 also contains the equivalent results when no credit is taken for continued MFW to the unaffected SG.Table 4-12: Effect of Continued MFW to Unaffected SG The results show that for each break size, the time to reactor trip is longer and the peak RCS pressure is lower when MFW is modeled to reach the unaffected SG. For the limiting break size, the peak RCS pressure is 2875.31 -2828.24 = 47.07 psi lower when MFW is allowed to reach the unaffected SG. The effect is less at smaller break sizes, but the reduction in peak RCS pressure is still significant.
Table 4-7: Pressurizer Level Sensitivity Results
The above evaluations demonstrate that significant conservatism is included in the FWLB evaluations because of the assumption that all feedwater is lost to the unaffected SG at the start of the event. The margins calculated above do not consider the effect of control systems changing the main feedwater pump speed during the transient.
 
Nevertheless, any flow reaching the unaffected SG would be a benefit.
ControDled Document A
Controfled Document A AR EVA ANP-3114(NP)
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 31 4.12 Limiting Feedwater Line Break Conditions and Results The following targeted conditions were found to result in the highest peak RCS pressure during a FWLB transient.
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                   Page 25 4.8           Loss of Offsite Power This section presents the results of the LOOP sensitivity study. The evaluations in Sections 4.1 through 4.7 are based on offsite power remaining available throughout the FWLB transient. The LOOP evaluation determines if the FWLB transient results are more limiting if offsite power is lost during the transient.
* Nominal RCS pressure (2170 psia hot leg pressure)* Maximum RCS flow (398,850 gpm)a 100.4 %FP* BOC (0.0 x 10- MTC, -1.3 x 10" Ak/k/&deg;F DTC, -1400 'F, 0.0070 Peff)* 585 'F RCSTave* 940 psia turbine header pressure a 80 %OR SG level* 290 inch indicated pressurizer level* LOOP occurring at turbine trip 0 Double ended guillotine break located in the main feedwater line of SG B right before the tee connecting to the two side branches.The sequence of events from this case is presented in Table 4-13. The results for the limiting case are presented in Table 4-14. Figures 4-4 through 4-8 plot key transient results for the limiting case.
If the LOOP occurs at the time that the break opens, the loss of offsite power will result in a reactor scram, which would reduce the energy added to the RCS by the core. Therefore, a LOOP at event initiation is less limiting than if a LOOP does not occur. On the other hand, if the LOOP is modeled to occur at the time of turbine trip, which is modeled to occur coincident with reactor trip, the LOOP will not affect the energy added to the RCS by the core. Furthermore, a LOOP at turbine trip causes the RCS flow to decrease just as the RCS pressure is approaching the maximum value. Therefore, a LOOP at turbine trip is evaluated as the limiting time for a LOOP to occur.
Controfled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
The LOOP evaluation considers the six cases from Section 4.7, but with a LOOP modeled at turbine trip.
Revision 0 Page 32 Table 4-13: Sequence of Events for Limiting FWLB Transient Event Time (sec)Transient initiated 0.0 MFW to both SGs interrupted 1.OE-6 Pressurizer spray begins N/A Peak thermal power occurs 7.9 RPS high RCS pressure trip actuated 10.0 Control rods begin to insert 10.6 Turbine stop valves (TSVs) begin to close LOOP EFIC actuated on low SG-B level 11.5 Initial PSV lift occurs -12.5 Peak RCS pressure occurs 14.7 EFW flow begins 51.5 Affected SG depressurization complete -55.0 Final PSV closure occurs -200.0 Peak Tave occurs -390.0 Transient terminated 600.0 Table 4-14: Results for Limiting FWLB Transient Parameter Value Peak RCS Pressure (psia) 2878.38 Peak thermal power (%RTP) 100.50 Peak Tave (&deg;F) 616.27 Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
The results with and without LOOP for each of the six cases are summarized in Table 4-8.
Revision 0 Page 33 Figure 4-4: FWLB RCS Peak Pressure versus Time 0 U.P4.3000 2900 2800 2700 2600 2500 2400 2300 2200 2100 2000 Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
The LOOP evaluation demonstrates that in each case, the peak RCS pressure is higher when a LOOP occurs at turbine trip. The highest peak RCS pressure (2878.38 psia) continues to occur at the same conditions as the case with no LOOP (Tave of 585 OF, a turbine header pressure of 940 psia, and a SG level of 80 %OR). The LOOP evaluation also confirmed that liquid passed by the PSVs remains above 600 OF.
Revision 0 Page 34 Figure 4-5: FWLB RCS Temperatures versus Time 650 640 630 620 610 600 2 0 590.-o.580 570 560 550 540 530 100 200 300 400 Time (s)500 600 700 800 Controiled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivitv Studies ANP-3114(NP)
Based on the LOOP evaluation, the FWLB transient should be evaluated with a LOOP occurring at the time of turbine trip.
Revision 0 Page 35 Figure 4-6: FWLB Pressurizer Level versus Time 44 42 40 0 0.r E 0 0)N 38 36 34 32 30 28 26 24 400 Time (s)
Table 4-8: LOOP Evaluation Results
Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
 
Revision 0 Page 36 Figure 4-7: FWLB SG Pressures versus Time I-0 0.400 Time (s)
Controlled Document A
Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
AR EVA                                                                                       ANP-3114(NP)
Revision 0 Page 37 Figure 4-8: FWLB SG Levels versus Time U-(-)Time (s)
CR-3 EPU Feedwater Line Break Analysis                                                           Revision 0 Sensitivity Studies                                                                                 Page 26 4.9           Break Size Sensitivity This section presents the results of the break size sensitivity study. The evaluations in Sections 4.1 through 4.8 are based on a double-ended guillotine break of the largest main feedwater (MFW) pipe near the junction where the largest pipe splits into two smaller pipes that continue to the SG (see Figure 4-3).
Controlled Document A AREVA CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies ANP-3114(NP)
The break size sensitivity study evaluates the effect of smaller break sizes at the same location. The break size sensitivity study did not change the area of the MFW side of the break. Therefore, all MFW is lost to the affected SG. Only the area on the SG side of the break was reduced to determine the break size sensitivity.
Revision 0 Page 38  
The break size sensitivity study was performed at the same conditions as the limiting case identified in Section 4.8, namely:
0 Nominal RCS Pressure
* Maximum RCS Flow a   100.4 %FP
* BOC a   585 'F RCSTave
* 940 psia Turbine Header Pressure
      &   80%ORSG Level
* 290 Inch Indicated Pressurizer Level
* LOOP occurring at Turbine Trip The model was updated to include a detailed MFW system model from the booster pumps to the SGs.
The MFW system model was set to isolate MFW to the unaffected steam generator at the start of the transient for consistency with previous FWLB evaluations. Overall, the model with a simplified MFW system and the model with a detailed MFW system produced equivalent FWLB transient results for the same break size. Incorporating the detailed MFW system resulted in a slightly different peak RCS pressure (2875.31 psia versus 2878.38 psia).
The CR-3 MFW system has three pipe sizes between the isolation check valve and the SGs. The largest main feedwater pipe is 18" SCH 80 (1.418 ft 2). The largest main feedwater pipe branches into two 14" SCH 80 (0.8522 ft2 ) pipes. The two 14" SCH 80 pipes then feed into a total of 32 riser pipes, each of which are 3" SCH 80 (0.04587 ft?). These three pipe areas are considered as the area of the SG side of the break along with arbitrarily selected pipe areas to fully capture the behavior of peak RCS pressure versus break size. The results of the break size sensitivity study are shown in Table 4-9.
The break size sensitivity study demonstrates that the peak RCS pressure is effectively the same for 2 break sizes ranging from 0.8522 ft (the area of the 14" SCH 80 pipes in the MFW system) to 1.418 ft 2
(the area of the 18" SCH 80 pipe in the MFW system). For break sizes less than 0.8522 ft2, the peak RCS pressure steadily decreases. Note that the highest peak RCS pressure was calculated for a 1.100 ft 2 break, but the difference in peak RCS pressure between a 1.418 ft2 break and a 1.100 ft2 break is only 2.6 psi. Furthermore, the CR-3 MFW system does not actually have a pipe with a 1.100 ft2 area between the isolation check valves and the SG. Therefore, evaluations based on the maximum pipe area of 1.418 ft 2 represent the limiting break area.
Based on the break size sensitivity study, the limiting break area for evaluating peak RCS pressure is the full area of the largest pipe in the CR-3 MFW system between the isolation check valves and the SGs (1.418 ft2).
 
Controled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                             Revision 0 Sensitivitv Studies                                                   Page 27 Table 4-9: Break Size Sensitivity Results
 
Controlled Document A
AR EVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                   Page 28 4.10         Break Location Sensitivity Study This section presents the results of the break location sensitivity study. This break location sensitivity study evaluates the effects of moving the double ended guillotine break to different pipe locations. The following locations were considered (see Figure 4-3):
    "   The limiting break from Section 4.9, which is a break in the main feedwater pipe in SG B. The break is located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches.
    "   A break in the same location as the limiting case from Section 4.9, but occurring on SG A instead of SG B.
* A break in the same pipe as the limiting case from Section 4.9, but occurring immediately after the isolation check valve.
* A break in one of the side branches of SG B at the tee that connects the main feedwater line to the side branches. The break is modeled as a double-ended guillotine break of a pipe with a 1.418 ft2 area.
* A break in one of the side branches of SG B near the entrance     to the SGs. The break is modeled as a double-ended guillotine break of a pipe with a 0.8522 ft 2 area.
The peak RCS pressure and reactor trip times for each of the identified break locations are summarized in Table 4-10.
The results in Table 4-10 show that a break in SG B is clearly more limiting than a break in SG A.
The peak RCS pressure for the four break locations in SG B all result in effectively the same peak RCS pressure, but different times for reactor trip. The reactor trip time indicates how quickly the affected SG discharges inventory out of the break. The earliest reactor trip time occurs when the break is in the branch side of the tee connecting the main feedwater line to the side braches. This location allows the SG inventory to reach both sides of the 1.418 ft 2 double-ended guillotine break. Since the total effective break area is larger, the reduction in inventory occurs more quickly. However, as mentioned above, the peak RCS pressure is effectively the same as the peak RCS pressure when the break is located in the main feedwater line before the tee. Furthermore, for both break locations all of the affected SG inventory will be discharged to containment by 60 seconds and the RCS conditions at that time are approximately the same. Therefore, the FWLB transient results are effectively the same for both break locations.
A break in one of the side branches near the SG also allows the SG inventory to reach both sides of the double-ended guillotine break, but the break area in both directions is only 0.8522 ft 2. The net effect is that the reactor trip time is slightly (0.188 sec) longer than the case with a break in the main feed line before the tee. The calculated peak RCS pressure in both cases differs by only 0.10 psi, which is an insignificant difference.
A break in the main feed line just downstream of the isolation check valves requires the longest time to reach the reactor trip setpoint. The peak RCS pressure is slightly less than the case with the break in the main feedwater line right before the tee, but the difference is negligible (2.12 psi).
The break location sensitivity study confirms that the limiting break location for evaluating peak RCS pressure is a double-ended break in the main feedwater pipe in SG B, located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches.
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                             Revision 0 Sensitivity Studies                                                   Page 29 Figure 4-3: Feedwater Line Break Locations Isolation Check Valve 18" 14"                           14" SG Table 4-10: Break Location Sensitivity Study
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                 Page 30-4.11           Evaluation of Continued Main Feedwater to Unaffected SG The CR-3 EPU FWLB evaluations conservatively model all feedwater to the unaffected SG as being lost at the start of the event. This conservative approach simplifies the analysis because the effect of control systems on the main feedwater pump speed during the transient can be ignored. This section presents an evaluation that demonstrates the conservatism added to the analysis by not crediting feedwater.
The evaluations with continued feedwater assume that the main feedwater pump speed is maintained at the initial condition value. EFIC actuation isolates feedwater or main feedwater is runback following a reactor trip. Once main feedwater is isolated or runback is.started, the analysis conservatively assumes that all main feedwater is stopped to the unaffected SG in 3.2 seconds for consistency with the LOFW analysis (Section 2.8.5.2.3.2 of the CR-3 EPU LAR).
The detailed feedwater model includes the cross connect piping that exists between the booster pumps and the main feedwater pumps. Therefore, the evaluations with continued feedwater allow flow from the booster pump in loop A to feed the main feedwater pump on the broken loop ifthe transient predicts this behavior. During normal operation, the CR-3 main feedwater system does not have a cross connect between the loops downstream of the main feedwater pumps.
The FWLB evaluations with continued feedwater were performed for several break sizes. The peak RCS pressure and time of reactor trip are summarized in Table 4-11. Table 4-11 also contains the equivalent results when no credit is taken for continued MFW to the unaffected SG.
Table 4-12: Effect of Continued MFW to Unaffected SG The results show that for each break size, the time to reactor trip is longer and the peak RCS pressure is lower when MFW is modeled to reach the unaffected SG. For the limiting break size, the peak RCS pressure is 2875.31 - 2828.24 = 47.07 psi lower when MFW is allowed to reach the unaffected SG. The effect is less at smaller break sizes, but the reduction in peak RCS pressure is still significant.
The above evaluations demonstrate that significant conservatism is included in the FWLB evaluations because of the assumption that all feedwater is lost to the unaffected SG at the start of the event. The margins calculated above do not consider the effect of control systems changing the main feedwater pump speed during the transient. Nevertheless, any flow reaching the unaffected SG would be a benefit.
 
Controfled Document A
AR EVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                                             Revision 0 Sensitivity Studies                                                                                 Page 31 4.12         Limiting Feedwater Line Break Conditions and Results The following targeted conditions were found to result in the highest peak RCS pressure during a FWLB transient.
* Nominal RCS pressure (2170 psia hot leg pressure)
* Maximum RCS flow (398,850 gpm) a   100.4 %FP
* BOC (0.0 x 10- *Ak/k/&deg;F MTC, -1.3 x 10" Ak/k/&deg;F DTC, -1400 'F, 0.0070 Peff)
* 585 'F RCSTave
* 940 psia turbine header pressure a   80 %OR SG level
* 290 inch indicated pressurizer level
* LOOP occurring at turbine trip 0   Double ended guillotine break located in the main feedwater line of SG B right before the tee connecting to the two side branches.
The sequence of events from this case is presented in Table 4-13. The results for the limiting case are presented in Table 4-14. Figures 4-4 through 4-8 plot key transient results for the limiting case.
 
Controfled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                   Revision 0 Sensitivity Studies                                                         Page 32 Table 4-13: Sequence of Events for Limiting FWLB Transient Event                     Time (sec)
Transient initiated               0.0 MFW to both SGs interrupted           1.OE-6 Pressurizer spray begins             N/A Peak thermal power occurs               7.9 RPS high RCS pressure trip actuated         10.0 Control rods begin to insert           10.6 Turbine stop valves (TSVs) begin to close LOOP EFIC actuated on low SG-B level           11.5 Initial PSV lift occurs           -12.5 Peak RCS pressure occurs               14.7 EFW flow begins                 51.5 Affected SG depressurization complete       -55.0 Final PSV closure occurs           -200.0 Peak Tave occurs               -390.0 Transient terminated               600.0 Table 4-14: Results for Limiting FWLB Transient Parameter                 Value Peak RCS Pressure (psia)           2878.38 Peak thermal power (%RTP)             100.50 Peak Tave (&deg;F)               616.27
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                               Revision 0 Sensitivity Studies                                                     Page 33 Figure 4-4: FWLB RCS Peak Pressure versus Time 3000 2900 2800 2700 2600 0
2500 U. 2400 P4.
2300 2200 2100 2000
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                 Revision 0 Sensitivity Studies                                                     Page 34 Figure 4-5: FWLB RCS Temperatures versus Time 650 640 630 620 610 600 2
0   590 o.-
  . 580 570 560 550 540 530 100       200     300   400     500      600  700          800 Time (s)
 
Controiled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                               Revision 0 Sensitivitv Studies                                                     Page 35 Figure 4-6: FWLB Pressurizer Level versus Time 44 42 40 38 0
0
.r E
36 0
0) 34 N 32 30 28 26 24 400 Time (s)
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                           Revision 0 Sensitivity Studies                                               Page 36 Figure 4-7: FWLB SG Pressures versus Time I-0 0.
400 Time (s)
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                           Revision 0 Sensitivity Studies                                               Page 37 Figure 4-8: FWLB SG Levels versus Time U-(-)
Time (s)
 
Controlled Document A
AREVA ANP-3114(NP)
CR-3 EPU Feedwater Line Break Analysis                                             Revision 0 Sensitivity Studies                                                                   Page 38


==5.0 REFERENCES==
==5.0     REFERENCES==
: 1. BAW-10164PA-06, "RELAP5/MOD2-B&W-An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis." 2. BAW-1 01 93PA-00, "RELAP5/MOD2-B&W for Safety Analysis of B&W-Designed Pressurizer Water Reactors."}}
: 1. BAW-10164PA-06, "RELAP5/MOD2-B&W- An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis."
: 2. BAW-1 01 93PA-00, "RELAP5/MOD2-B&W for Safety Analysis of B&W-Designed Pressurizer Water Reactors."}}

Latest revision as of 01:40, 12 November 2019

Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies.
ML12205A358
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/2012
From:
AREVA NP, Progress Energy Florida
To:
Office of Nuclear Reactor Regulation
References
TAC ME6527, 3F0712-03 ANP-3114(NP), Rev. 0
Download: ML12205A358 (39)


Text

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 ATTACHMENT D TECHNICAL REPORT ANP-3114(NP):

CR-3 EPU - FEEDWATER LINE BREAK ANALYSIS SENSITIVITY STUDIES, REVISION 0 (NON-PROPRIETARY)

Controfled ANP-3114(NP)

Revision 0 CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies May 2012 AREVA

Controlled Document ANP-3114(NP)

Revision 0 May 2012 CR-3 EPU Feedwater Line Break Analysis Sensitivity Studies Copyright © 2012 AREVA Inc.

All Rights Reserved

Controled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 3 Record of Revision Revision Pages/Sections/Paragraphs No. Changed Brief Description I Change Authorization 000 All Initial Release

Controlled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 4 Table of Contents 1.0 Intro d u c tio n ........................................................................................................................................ 8 2.0 Analytical Methodology ............................................................................................................ 9 3.0 Analysis Inputs ................................................................................................................................ 10 4 .0 R e s u lts ............................................................................................................................................ 13 4.1 Base Case for Sensitivity Studies .......................................................................................... 13 4.2 RCS Pressure Sensitivity ...................................................................................................... 14 4.3 RCS Flow Sensitivity ................................................................................................................... 15 4.4 Power Level Sensitivity ........................................................................................................ 16 4.5 Tim e in Cycle Sensitivity ............................................................................................................. 18 4.6 Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity ............................. 20 4.7 Pressurizer Level Sensitivity ....................................................................................................... 24 4.8 Loss of Offsite Power ........................................... I.................................................................. 25 4.9 Break Size Sensitivity ............................................................................................................ 26 4.10 Break Location Sensitivity Study ................................................................................................. 28 4.11 Evaluation of Continued Main Feedwater to Unaffected SG ...................................................... 30 4.12 Lim iting Feedw ater Line Break Conditions and Results ............................................................. 31 5.0 References ...................................................................................................................................... 38

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 5 List of Tables Table 4-1: RCS Pressure Sensitivity Results ......................................................................................... 14 Table 4-2: RCS Flow Sensitivity Results ............................................................................................ 15 Table 4-3: Steady-State Results for Power Level Sensitivity ............................................................... 17 Table 4-4: Power Level Sensitivity Results ........................................................................................... 17 Table 4-5: Time in Cycle Sensitivity Results ........................................................................................ 19 Table 4-6: SG Inventory Sensitivity Results ......................................................................................... 21 Table 4-7: Pressurizer Level Sensitivity Results ................................................................................. 24 Table 4-8: LOOP Evaluation Results .................................................................................................... 25 Table 4-9: Break Size Sensitivity Results ............................................................................................. 27 Table 4-10: Break Location Sensitivity Study ............................................................................................ 29 Table 4-12: Effect of Continued MFW to Unaffected SG ........................................................................... 30 Table 4-13: Sequence of Events for Limiting FWLB Transient ............................................................ 32 Table 4-14: Results for Limiting FWLB Transient ................................................................................. 32

Controfled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 6 List of Figures Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory .............................................. 22 Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory ............................................... 23 Figure 4-3: Feedwater Line Break Locations ............................................................................................. 29 Figure 4-4: FWLB RCS Peak Pressure versus Time ................................................................................. 33 Figure 4-5: FWLB RCS Temperatures versus Time .................................................................................. 34 Figure 4-6: FWLB Pressurizer Level versus Time ..................................................................................... 35 Figure 4-7: FWLB SG Pressures versus Time ..................................................................................  :........ 36 Figure 4-8: FWLB SG Levels versus Time .......................................................................................... 37

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 7 Nomenclature Acronym Definition p3eff Delayed Neutron Fraction BOC Beginning of Cycle CR-3 Crystal River Unit 3 DTC Doppler Temperature Coefficient EFIC Emergency Feedwater Initiation and Control EFW Emergency Feedwater EOC End of Cycle EPU Extended Power Uprate FOGG Feed Only Good Generator FWLB Feedwater Line Break HZP Hot Zero Power ICS Integrated Control System LAR Licensing Amendment Request LOCA Loss of Coolant Accident LOFW Loss of Feedwater LOOP Loss of Offsite Power MFW Main Feedwater MSSV Main Steam Safety Valves MTC Moderator Temperature Coefficient NRC Nuclear Regulatory Commission PORV Pilot Operated Relief Valve PSV Pressurizer Safety Valve RCP Reactor Coolant Pump RCS Reactor Coolant System RPS Reactor Protection System SDM Shutdown Margin SG Steam Generator SRP Standard Review Plan Tave Average RCS Temperature TSV Turbine Stop Valves

ControDled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 8

1.0 INTRODUCTION

Section 2.8.5.2.4 of the Crystal River Unit 3 (CR-3) extended power uprate (EPU) licensing amendment request (LAR) describes the feedwater line break (FWLB) evaluations that were performed to support the power uprate. The evaluations that were performed are consistent with approved methodology [2] and the current licensing basis of the plant, except that the licensing basis is being revised for EPU to use the Standard Review Plan (SRP) Section 15.2.8 reactor coolant system (RCS) pressure limit of 120% of the design pressure, or 3000 psig. Since the CR-3 licensing basis is being revised to use the SRP pressure limit, additional sensitivity studies are performed to address requirements of SRP 15.2.8. The sensitivity studies documented in this report are for the following parameters:

  • Initial RCS Pressure

" Initial RCS Flow

  • Initial Power Level
  • Time in Cycle
  • Initial RCS Average Temperature (Tave)

" Initial steam generator (SG) Pressure

  • Initial SG Level
  • Initial Pressurizer Level
  • Loss of offsite power (LOOP)
  • Break Size
  • Break Location

Controlled Document A

ARE VA ANP-31 14(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 9 2.0 ANALYTICAL METHODOLOGY The thermal-hydraulic analysis of the FWLB at the CR-3 EPU power level is performed using the RELAP5/MOD2-B&W computer program (Reference [1]). The code simulates RCS and secondary system operation. The reactor core model is based on a point kinetics solution with reactivity feedback for control rod assembly insertion, fuel temperature changes, moderator temperature changes, and changes in boron concentration. The RCS model provides for heat transfer from the core, transport of the coolant to the steam generators, and heat transfer to the steam generators. The secondary model includes a detailed depiction of the main steam system, including steam relief to the atmosphere through the main steam safety valves (MSSVs) and simulation of the turbine stop valves (TSVs). The secondary model also includes the delivery of feedwater, both main and emergency, to the steam generators.

The RELAP5/MOD2-B&W code has been approved by the Nuclear Regulatory Commission (NRC) for use in non Loss of Coolant (LOCA) safety analyses (Reference [2]). The FWLB analysis documented in Section 2.8.5.2.4 of the CR-3 EPU LAR is consistent with Reference [2]. The methodology in Reference

[2] dictates the input boundary conditions for many plant parameters, such as the RCS flow, Tave, and the RCS initial pressure. The intent of the evaluations in this report is to determine the effect of changing initial conditions on the FWLB transient to support compliance with SRP Section 15.2.8. Therefore, the analyses in this document include input conditions that are not consistent with Reference [2]. However, the conditions specified in Reference [2] are included or bounded by the range of conditions considered in the sensitivity studies.

Controfled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 10 3.0 ANALYSIS INPUTS Many of the input parameters in the FWLB sensitivity studies are consistent with the FWLB analysis without pressurizer spray performed to support Section 2.8.5.2.4 of the CR-3 EPU LAR. The input parameters that are consistent are listed below:

  • The maximum power level considered is the targeted EPU power level of 3026.1 MWt (100.4% of 3014 MWt). A conservative reactor coolant pump (RCP) heat of 16.4 MWt is included when the RCPs are operating.
  • The nominal average RCS temperature (Tave) is 582 *F, consistent with the increase in Tave that is planned in conjunction with the EPU.
  • The nominal hot leg pressure is 2170 psia.
  • The minimum RCS flow rate considered is 374,880 gpm.
  • The nominal indicated pressurizer level plus uncertainty is 240 inches.
  • Two pressurizer safety valves (PSVs) were modeled with a nominal lift setpoint of 2500 psig, plus 3% lift tolerance, and 0% accumulation. A blowdown of 4% was also considered.
  • Pressurizer heaters and pressurizer spray were not modeled.
  • The Pilot Operated Relief Valve (PORV) was not modeled for the FWLB analysis.

" Reactor trip was modeled to occur based on the reactor protection system (RPS) high RCS pressure trip function. The high RCS pressure trip setpoint includes the effects of elevated pressure that may exist inside containment post-FWLB.

  • After reactor trip, the core heat generation rate was conservatively based on 1.0 times the ANS 1971 decay heat standard for fission plus heavy actinides.

" Beginning-of-cycle (BOC) typical reactivity coefficients (Doppler temperature coefficient (DTC) -

1.30 x 10-5 Ak/k/OF and moderator temperature coefficient (MTC) = 0.0 x 10-4 Ak/k/°F) were evaluated.

  • The MSSVs were modeled to lift at the nominal setpoints plus 3% lift tolerance and 3%

accumulation. A nominal blowdown of 5% was used.

" A single failure of one train of the Emergency Feedwater Initiation and Control (EFIC) system was assumed as the worse case single failure. Therefore, only one of the two emergency feedwater (EFW) pumps was assumed to be available to provide flow to the SGs. The EFW temperature was modeled as 120 *F. The EFIC system contains Feed Only Good Generator (FOGG) logic, thus all EFW was provided to the unaffected SG.

Controlled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 11

  • No operator actions were credited.

" No Integrated Control System (ICS) actions were credited.

Key input parameters modeled in the sensitivity studies that are different from the FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR include:

  • The sensitivity studies considered power levels ranging from 60% to 100.4% of the EPU rated thermal power level (3014 MWt). The sensitivity demonstrates that the peak RCS pressure is much less at lower power levels, so evaluations below 60% were not required.
  • The sensitivity studies considered a Tave range of 582 +/- 3 *F, allowing for an uncertainty of up to 3 'F.
  • The sensitivity studies considered hot leg pressure ranging from the minimum allowed value of 2078.7 psia to a maximum value of 2244.7 psia, which is 25 psi above the setpoint for opening the pressurizer spray valves to allow for uncertainty.

" The sensitivity studies considered RCS flow ranging from the minimum DNB flow of 374,880 gpm to a maximum flow of 398,850 gpm. The maximum flow value is based on no tube plugging, a 2.5% uncertainty, and the conservative assumption that all of the SG tube walls are at the minimum tube wall thickness.

  • The sensitivity studies considered initial pressurizer level ranging from 240 inches to 290 inches, which is the maximum pressurizer level currently allowed for CR-3. A higher pressurizer level is more limiting, so levels below 240 inches were not evaluated.
  • The sensitivity studies evaluated the effect of time in cycle on the FWLB 0

transient including end of cycle (EOC) typical reactivity coefficients (DTC = -2.00 x 10-5 Ak/k/ F and MTC = -4.0 x 10-4 Aklk/°F).

  • The sensitivity studies evaluated initial SG levels ranging from 50 %OR to 95 %OR.
  • The sensitivity studies evaluated initial turbine header pressures in the range of 930 +/- 50 psia.
  • The sensitivity studies evaluated the FWLB transient with and without a LOOP. When modeled, the LOOP occurs at the time of turbine trip because a LOOP at the start of the event is less limiting.
  • The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR considered a high RCS pressure reactor trip setpoint of 2445.45 psia. This trip setpoint is based on the conservative assumption that the containment pressure is at the maximum allowed pressure (55 psig) by the time the trip setpoint is reached following a FWLB. A more realistic evaluation of containment pressure following a secondary side pipe break demonstrated that the containment pressure increases by less than 29.1 psi by the time the high RCS pressure trip setpoint is reached in a FWLB transient.

Therefore, the sensitivity studies are based on a high RCS pressure setpoint of 2420 psia.

  • The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled a 1.0 %Ak/k SDM requirement at hot zero power (HZP). The Modes 1 and 2 minimum SDM requirement is being increased to 1.3 %Aklk for the CR-3 EPU. Therefore, the sensitivity studies are based on the EPU SDM requirement of 1.3 %Ak/k at HZP.

Controfled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 12 The FWLB analyses in Section 2.8.5.2.4 of the CR-3 EPU LAR conservatively modeled the EFW flow as 550 gpm (total) occurring with a 60-second delay after the low SG level initiation setpoint.

The CR-3 EPU loss of feedwater (LOFW) analysis in Section 2.8.5.2.3 of the CR-3 EPU LAR requires a minimum EFW flow of 660 gpm and a 40-second delay. Therefore, the sensitivity studies are based on a minimum EFW flow of 660 gpm and a 40-second delay after the low SG level initiation setpoint for consistency with the CR-3 EPU LOFW analyses.

Controlled Document A

ARE VA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 13 4.0 RESULTS 4.1 Base Case for Sensitivity Studies As identified in Section 3.0 of this report, several of the key input assumptions in the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR contained excess conservatism. These assumptions, as well as some details in the model, were modified prior to performing the sensitivity studies. In particular, the following input assumptions were changed:

1. The minimum EFW flow of 550 gpm with a 60-second delay time after the low SG level initiation setpoint is reached was changed to a minimum EFW flow of 660 gpm with a 40-second minimum delay time. This change makes the FWLB analysis consistent with the requirements of the LOFW transient. Note that the minimum EFW flow is based on the limiting single failure assumption that only one of the two EFW pumps is available to provide flow to the SGs.
2. The SDM requirement was increased from 1.0 %Ak/k to 1.3 %Ak/k at HZP with the maximum worth control rod removed from the core. The Modes 1 and 2 minimum shutdown margin requirement is being increased to 1.3 %Ak/k for the EPU.
3. The RPS high RCS pressure trip setpoint was reduced from 2445.45 psia to 2420 psia.

Evaluations determined that a setpoint of 2420 psia continues to conservatively account for elevated pressure that may exist inside containment post-FWLB at the time that the reactor trip setpoint is reached.

4. More detailed calculations of the form loss in the pressurizer surge line as a function of surge line flow rate were incorporated into the FWLB model.
5. A more detailed calculation of the reverse form loss through the MFW nozzles was performed.

The results of the calculation were incorporated into the FWLB model.

6. A preliminary sensitivity study of initial SG inventory determined that the peak RCS pressure is highest for an initial SG level of 80 %OR. Therefore, the initial SG level was changed to 80 %OR.

The peak RCS pressure for the FWLB analysis in Section 2.8.5.2.4 of the CR-3 EPU LAR is 2896.20 psia. The FWLB transient described in Section 2.8.5.2.4 of the CR-3 EPU LAR was re-evaluated with the changes described above. The resulting peak RCS pressure was 2829.42 psia. Unless otherwise stated, the model resulting in a peak RCS pressure of 2829.42 psia is used as the base case for sensitivity studies described in this report. The base case targets the following initial conditions:

  • 2170 psia hot leg pressure
  • Minimum RCS flow of 374,880 gpm
  • 100.4% of 3014 MWt 0 Beginning of cycle typical parameters (MTC = 0.0 x 10-4 Ak/k/OF, DTC = -1.30 x 10-5 Ak/k/OF, Peff = 0.0070, Fuel Temperature - 1400 OF)
  • Taveof582 °F
  • Pressurizer indicated level of 240 inches
  • Double-ended guillotine break in the main feedwater line shortly before the line splits into two smaller branches that feed the SG (see Figure 4-3).

Controfled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 14 4.2 RCS Pressure Sensitivity This section presents the results of the RCS pressure sensitivity study. The RCS pressure sensitivity starts from the base case (nominal RCS pressure) and changes the initial hot leg pressure. The peak RCS pressure and reactor trip times from the RCS pressure sensitivity study are presented in Table 4-1.

The RCS pressure sensitivity study demonstrates that the time of reactor trip during a FWLB transient is directly affected by the initial RCS pressure. For cases evaluated near the nominal hot leg pressure (i.e.

2170 psia +/- 30 psia), the change in the time of reactor trip does not significantly affect the increase in RCS pressure that occurs after reactor trip. Consequently, the peak RCS pressure for each case analyzed near the nominal hot leg pressure is within 5 psi of the other cases.

In cases that are initialized further away from the nominal hot leg pressure (i.e. 2078.7 psia and 2244.7 psia), the change in the time of reactor trip is more significant. The transient progression during the time leading up to reactor trip for these cases leads to a lower peak RCS pressure than the case evaluated at the nominal hot leg pressure.

Based on the RCS pressure sensitivity study, setting the initial RCS pressure to the nominal value is appropriate for evaluating the FWLB transient.

Table 4-1: RCS Pressure Sensitivity Results

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 15 4.3 RCS Flow Sensitivity This section presents the results of the RCS flow sensitivity study. The RCS flow sensitivity starts from the base case (minimum RCS flow) and changes the initial RCS flow to the maximum value. Establishing steady-state conditions at higher RCS flow will result in a change in Tave, the SG pressure, the SG inventory, or a combination of these parameters. The RCS flow sensitivity maintains a consistent SG inventory for all cases and evaluates one case where only Tave changes and one case where only the SG pressure changes. The peak RCS pressure and reactor trip times from the RCS flow sensitivity study are presented in Table 4-2.

The RCS flow sensitivity study shows that the RCS flow does not significantly change the hot leg pressure during the transient, and therefore does not affect the time of reactor trip. However, since the hot leg pressure is the same and the RCS flow is higher, the AP from the hot leg to the location of the peak RCS pressure (i.e. at the bottom of the reactor vessel) increases. Consequently, the peak RCS pressure is [ ] higher for cases evaluated at the maximum RCS flow.

Based on the RCS flow sensitivity study, the peak RCS pressure for a FWLB transient should be evaluated assuming maximum RCS flow. This would not be conservative for evaluating departure from nucleate boiling (DNB). However, as explained in Section 2.8.5.2.4.2 of the CR-3 EPU LAR, since the reactor coolant pumps (RCPs) remain operating, the RCS fluid remains subcooled, and the core power remains less than 112% throughout the FWLB analysis, it is concluded that the minimum DNB ratio would remain above the applicable correlation limit without performing an explicit analysis for FWLB. Therefore, the RCS flow for the FWLB transient should be biased to challenge the peak RCS pressure acceptance criteria.

Table 4-2: RCS Flow Sensitivity Results

Controled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 16 4.4 Power Level Sensitivity This section presents the results of the power level sensitivity study. The base case is evaluated at 100.4% of the proposed EPU power level. The power level sensitivity study compares the base case to evaluations performed at 95.4 %FP, 80 %FP, and 60 %FP. Table 4-3 documents the steady-state conditions achieved for each power level. The peak RCS pressure and reactor trip times from the FWLB power level sensitivity study are presented in Table 4-4.

The FWLB results show that as the power level decreases, the lower initial SG inventory results in an earlier reactor trip. The earlier reactor trip in conjunction with a lower initial core power level causes the peak RCS pressure to be significantly lower as the power level decreases. The peak RCS pressure is less than 110% of the RCS design pressure (< 2764.7 psia) for initial power levels of 80 %FP and below.

Given the significant reduction in peak RCS pressure observed at 80 and 60 %FP, it was concluded that power levels <60 %FP did not need to be evaluated.

CR-3 is allowed to operate with a positive MTC at lower power levels. As discussed in Section 2.8.5.4.1.2 of the CR-3 EPU LAR, the most positive MTC that will be allowed for EPU core designs is +7.5 x 10-5 Ak/k/°F. The FWLB power level sensitivity study included evaluations at 95.4 %FP, 80 %FP, and 60 %FP with an MTC of +7.5 x 10`5 Ak/k/°F. A positive MTC resulted in a higher peak RCS pressure for each power level analyzed; however, the base case (100.4 %FP, 0.0 x 10-5 Aklk/°F) remained the limiting case.

Based on the power level sensitivity study, the FWLB transient should be evaluated at 100.4 %FP.

Controfled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivitv Studies Page 17 Table 4-3: Steady-State Results for Power Level Sensitivity Table 4-4: Power Level Sensitivity Results

Controfled Document A

ARN EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 18 4.5 Time in Cycle Sensitivity This section presents the results of the time in cycle sensitivity study. The base case is evaluated at conservative BOC conditions. The MTC (a constant 0.0 x 10-5 Ak/k/OF) is the most positive MTC allowed at full power. The DTC is a value (-1.3 x 10-5 Ak/k/°F) that is more positive than expected for EPU fuel cycle designs (see Table 2.8.2-2 of the CR-3 EPU LAR). The fuel temperature (-1400 OF) is representative of BOC conditions at the EPU power level. Finally, the effective delayed neutron fraction (Peff) is a BOC typical value (0.0070). The rod worth used in the base case is determined to be the minimum required rod worth needed to meet the SDM definition for the modeled MTC, DTC, and fuel temperature. The time in cycle sensitivity study evaluates the effects of changing MTC, DTC, fuel temperature, and P3eff on the FWLB transient. Table 4-5 presents the key results from the FWLB time in cycle sensitivity study.

The base case utilizes an MTC that does not change with moderator temperature or density. Therefore, the time in cycle sensitivity analysis compared the base case to cases using constant MTC values of

-10.0 x 10-5 Ak/k/°F and -20.0 x 10-5 Ak/k/°F. When a constant MTC is used, the thermal power level of the core does not change significantly prior to reactor trip. Consequently, the time of reactor trip is approximately the same for all three cases evaluated with a constant MTC. Although the pre-trip transient behavior is approximately the same in all three cases, the results show that a more negative MTC resulted in a lower peak RCS pressure. This occurs because a more negative MTC requires more rod worth in order for the SDM requirement to be met. The additional rod worth results in a faster reduction in the core thermal power shortly after trip, which in turn reduces the peak RCS pressure. The trend versus MTC is clear, so evaluations were not performed for constant MTCs that are more negative than -20.0 x 10-5 Ak/k/°F.

The time in cycle sensitivity study also includes cases that allow the moderator reactivity feedback to change with moderator density. The sensitivity study considered five reactivity versus moderator 0 density curves. The MTCs from the curves at initial hot full power conditions are 0.0 x 10.5 Ak/k/ F, -10.0 x 10-5 Ak/k/0 F, -20.0 x 10-5 Ak/k/ 0F, -30.0 x 10-5 Ak/k/°F, and -40.0 x 10.5 Ak/k/°F. Table 2.8.2-2 of the CR-3 EPU LAR lists the expected EPU most negative MTC limit as -37.5 x 10-5 Ak/k/°F, so a -40 x 10.5 Ak/k/°F MTC bounds typical EPU cycles. The sensitivity study performed using different reactivity versus moderator density curves demonstrates that as the MTC becomes more negative, the peak thermal power increases and the time to reactor trip decreases. However, in all of the cases the peak thermal power remained well below 112 %FP. The increase in thermal power that occurs prior to reactor trip is more than offset by the increased rod worth that is needed to meet the SDM definition at more negative MTCs. Therefore, as the MTC becomes more negative the peak RCS pressure decreases.

The time in cycle sensitivity study included a case to evaluate the effect of DTC. The case is evaluated with an MTC that is representative of EOC (i.e. -40 x 10-5 Ak/k/°F). The DTC sensitivity study considers values of -1.30 x 10.5 Ak/k/°F and -2.00 x 10.' Ak/k/IF, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The DTC comparison shows that a more negative DTC causes the maximum thermal power to decrease because of the additional negative reactivity feedback.

Furthermore, the more negative DTC requires more rod worth to meet the minimum SDM requirement.

These two factors result in a lower peak RCS pressure for the case evaluated with a more negative DTC.

The effect of fuel temperature is evaluated with reactivity coefficients that are representative of EOC. The fuel temperature sensitivity reduces the BOC typical fuel temperature (-1400 OF) to a fuel temperature that is representative of EOC conditions (-1080 OF). The fuel temperature is changed by increasing the fuel gap thermal conductance. The fuel temperature comparison demonstrates that the increased fuel gap thermal conductance associated with EOC fuel temperatures results in a slightly higher peak thermal

Controlled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 19 power. In addition, a lower initial fuel temperature means that less rod worth is needed to meet the minimum SDM requirement because the initial fuel temperature is closer to the HZP temperature.

However, the lower initial fuel temperature also results in less heat stored in the fuel that must be removed following reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical fuel temperatures.

The effect of P3eff is evaluated with an MTC, DTC, and fuel temperature that are representative of EOC.

The P3eff sensitivity study considers values of 0.0045 and 0.0070, which bound the typical EPU values in Table 2.8.2.2 of the CR-3 EPU LAR. The P3eff comparison shows that smaller values of 3eff result in a faster positive reactivity response prior to trip, which increases the maximum thermal power. However, smaller values of 13eff also result in a faster negative reactivity response as the control rods are inserted.

The effect of P3eff on the post-trip portion of the transient has more effect on the peak RCS pressure,,

which occurs a few seconds after reactor trip. Consequently, the peak RCS pressure is significantly less for cases evaluated at EOC typical values of P3eff.

The sensitivity studies on time in cycle demonstrated that the peak RCS pressure in a FWLB transient is higher when BOC typical values are modeled for MTC, DTC, fuel temperature, and Peff.

Table 4-5: Time in Cycle Sensitivity Results

Controled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 20 4.6 Steam Generator Inventory (Tave, SG Pressure, and SG Level) Sensitivity This section presents the results of the SG inventory sensitivity study, which varies RCS Tave, SG pressure, and SG level to achieve different initial SG inventories. The SG inventory sensitivity study starts from the base case. The RCS flow is set to a maximum value because the evaluations summarized in Section 4.3 determined that a maximum RCS flow results in a higher peak RCS pressure than a case at a minimum DNB flow. The initial RCS pressure, initial power level, and time in cycle evaluated in the SG inventory sensitivity study match the base case because the values used in the base case were shown to be the limiting conditions. The RCS Tave, SG pressure, and SG level are varied within the following spectrum of initial conditions:

" RCS Tave in the range of 582 'F +/- 3 *F

" Turbine header pressure in the range of 930 psia +/- 50 psi

" SG level ranging from 50 %OR to 95 %OR Although the above ranges are considered, every possible combination cannot realistically be achieved.

For a given Tave, the minimum level that can be achieved in the SG is affected by the orifice plate in the SG downcomer and the initial SG pressure. Therefore, the minimum SG levels considered for a given RCS Tave and SG pressure combination is either 50 %OR or the minimum level when the orifice plate is fully opened. Similarly, the maximum SG pressure that can be modeled for a given RCS Tave is the pressure that results in a SG level of 95 %OR when the orifice plate is fully open.

Table 4-6 summarizes the steady-state SG inventory and the key FWLB transient results for each of the 34 cases that were evaluated to consider the effects of RCS Tave, SG pressure, and SG level on the FWLB transient. The results clearly show that as the SG inventory increases, the time to reactor trip increases. This is demonstrated by Figure 4-1. The longer time to reactor trip means that cases starting with more initial SG inventory also discharge more inventory out of the break by the time reactor trip is reached. This behavior leads to relatively small differences in the affected SG inventory when reactor trip occurs. Since each case has approximately the same inventory in the affected SG at the time of reactor trip, the RCS pressure increase shortly after reactor trip is close to the same for each case considered.

Furthermore, since the reactor trip is initiated by a high RCS pressure trip function, each case is at the same hot leg pressure when the reactor trip occurs. Consequently, the peak RCS pressure in a FWLB transient is not sensitive to RCS Tave, SG pressure, SG level, or SG inventory. This is demonstrated by the similarity in the peak RCS pressure results in Table 4-6 and Figure 4-2. The highest peak RCS pressure for any of the cases considered is 2842.15 psia at an RCS Tave of 585 'F, a turbine header pressure of 940 psia, and a SG level of 80 %OR.

Although the peak RCS pressure is not sensitive to changes in RCS Tave, SG pressure, SG level, or SG inventory, these parameters will affect the mass and energy released to containment. Cases with higher initial SG inventory would release more mass from the SG side of the break and would delay reactor trip allowing more mass from the MFW side of the break to reach containment. Conversely, minimizing the initial SG inventory will minimize the mass and energy released to containment.

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 21 Table 4-6: SG Inventory Sensitivity Results

Controled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 22 Figure 4-1: Time to Reactor Trip versus Initial Steam Generator Inventory *m

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 23

- Figure 4-2: Peak RCS Pressure versus Initial Steam Generator Inventory

Controled Document A

AR EVA ANP-31 14(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 24 4.7 Pressurizer Level Sensitivity This section presents the results of the pressurizer level sensitivity study. The evaluations summarized in Sections 4.1 through 4.6 are based on an indicated pressurizer level of 240 inches, which is the nominal pressurizer level of 220 inches plus 20 inches for uncertainty. The pressurizer level sensitivity study evaluates pressurizer levels as high as 290 inches, which is the maximum pressurizer level currently allowed for CR-3.

Six of the cases evaluated in Section 4.6 were selected for evaluation in the pressurizer level sensitivity study. The cases chosen were selected to span the ranges of conditions evaluated in Section 4.6. The cases chosen also include the cases in Table 4-6 that had the highest peak RCS pressure. The peak RCS pressure and reactor trip times from the pressurizer level sensitivity study are presented in Table 4-7.

The pressurizer level sensitivity study demonstrated that for each case, a higher initial pressurizer level causes the RCS pressure to respond more quickly to changes in the RCS temperatures because of the smaller available steam space. Consequently, the reactor trip occurs sooner and the peak RCS pressure is higher when the initial pressurizer level is higher. The highest peak RCS pressure for any of the cases considered with a pressurizer level of 290 inches is 2861.20 psia.

In addition to evaluating the peak RCS pressure, the pressurizer level sensitivity study also evaluated the temperature of liquid in the pressurizer for those cases that predicted liquid relief out of the PSVs. The pressurizer sensitivity study verified that if liquid is passed by the PSVs, the liquid remains above 600 OF.

The sensitivity study on pressurizer level demonstrated that a higher initial pressurizer level is more limiting for the FWLB transient.

Table 4-7: Pressurizer Level Sensitivity Results

ControDled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 25 4.8 Loss of Offsite Power This section presents the results of the LOOP sensitivity study. The evaluations in Sections 4.1 through 4.7 are based on offsite power remaining available throughout the FWLB transient. The LOOP evaluation determines if the FWLB transient results are more limiting if offsite power is lost during the transient.

If the LOOP occurs at the time that the break opens, the loss of offsite power will result in a reactor scram, which would reduce the energy added to the RCS by the core. Therefore, a LOOP at event initiation is less limiting than if a LOOP does not occur. On the other hand, if the LOOP is modeled to occur at the time of turbine trip, which is modeled to occur coincident with reactor trip, the LOOP will not affect the energy added to the RCS by the core. Furthermore, a LOOP at turbine trip causes the RCS flow to decrease just as the RCS pressure is approaching the maximum value. Therefore, a LOOP at turbine trip is evaluated as the limiting time for a LOOP to occur.

The LOOP evaluation considers the six cases from Section 4.7, but with a LOOP modeled at turbine trip.

The results with and without LOOP for each of the six cases are summarized in Table 4-8.

The LOOP evaluation demonstrates that in each case, the peak RCS pressure is higher when a LOOP occurs at turbine trip. The highest peak RCS pressure (2878.38 psia) continues to occur at the same conditions as the case with no LOOP (Tave of 585 OF, a turbine header pressure of 940 psia, and a SG level of 80 %OR). The LOOP evaluation also confirmed that liquid passed by the PSVs remains above 600 OF.

Based on the LOOP evaluation, the FWLB transient should be evaluated with a LOOP occurring at the time of turbine trip.

Table 4-8: LOOP Evaluation Results

Controlled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 26 4.9 Break Size Sensitivity This section presents the results of the break size sensitivity study. The evaluations in Sections 4.1 through 4.8 are based on a double-ended guillotine break of the largest main feedwater (MFW) pipe near the junction where the largest pipe splits into two smaller pipes that continue to the SG (see Figure 4-3).

The break size sensitivity study evaluates the effect of smaller break sizes at the same location. The break size sensitivity study did not change the area of the MFW side of the break. Therefore, all MFW is lost to the affected SG. Only the area on the SG side of the break was reduced to determine the break size sensitivity.

The break size sensitivity study was performed at the same conditions as the limiting case identified in Section 4.8, namely:

0 Nominal RCS Pressure

  • Maximum RCS Flow a 100.4 %FP
  • BOC a 585 'F RCSTave
  • 940 psia Turbine Header Pressure

& 80%ORSG Level

  • 290 Inch Indicated Pressurizer Level
  • LOOP occurring at Turbine Trip The model was updated to include a detailed MFW system model from the booster pumps to the SGs.

The MFW system model was set to isolate MFW to the unaffected steam generator at the start of the transient for consistency with previous FWLB evaluations. Overall, the model with a simplified MFW system and the model with a detailed MFW system produced equivalent FWLB transient results for the same break size. Incorporating the detailed MFW system resulted in a slightly different peak RCS pressure (2875.31 psia versus 2878.38 psia).

The CR-3 MFW system has three pipe sizes between the isolation check valve and the SGs. The largest main feedwater pipe is 18" SCH 80 (1.418 ft 2). The largest main feedwater pipe branches into two 14" SCH 80 (0.8522 ft2 ) pipes. The two 14" SCH 80 pipes then feed into a total of 32 riser pipes, each of which are 3" SCH 80 (0.04587 ft?). These three pipe areas are considered as the area of the SG side of the break along with arbitrarily selected pipe areas to fully capture the behavior of peak RCS pressure versus break size. The results of the break size sensitivity study are shown in Table 4-9.

The break size sensitivity study demonstrates that the peak RCS pressure is effectively the same for 2 break sizes ranging from 0.8522 ft (the area of the 14" SCH 80 pipes in the MFW system) to 1.418 ft 2

(the area of the 18" SCH 80 pipe in the MFW system). For break sizes less than 0.8522 ft2, the peak RCS pressure steadily decreases. Note that the highest peak RCS pressure was calculated for a 1.100 ft 2 break, but the difference in peak RCS pressure between a 1.418 ft2 break and a 1.100 ft2 break is only 2.6 psi. Furthermore, the CR-3 MFW system does not actually have a pipe with a 1.100 ft2 area between the isolation check valves and the SG. Therefore, evaluations based on the maximum pipe area of 1.418 ft 2 represent the limiting break area.

Based on the break size sensitivity study, the limiting break area for evaluating peak RCS pressure is the full area of the largest pipe in the CR-3 MFW system between the isolation check valves and the SGs (1.418 ft2).

Controled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivitv Studies Page 27 Table 4-9: Break Size Sensitivity Results

Controlled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 28 4.10 Break Location Sensitivity Study This section presents the results of the break location sensitivity study. This break location sensitivity study evaluates the effects of moving the double ended guillotine break to different pipe locations. The following locations were considered (see Figure 4-3):

" The limiting break from Section 4.9, which is a break in the main feedwater pipe in SG B. The break is located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches.

" A break in the same location as the limiting case from Section 4.9, but occurring on SG A instead of SG B.

  • A break in the same pipe as the limiting case from Section 4.9, but occurring immediately after the isolation check valve.
  • A break in one of the side branches of SG B at the tee that connects the main feedwater line to the side branches. The break is modeled as a double-ended guillotine break of a pipe with a 1.418 ft2 area.
  • A break in one of the side branches of SG B near the entrance to the SGs. The break is modeled as a double-ended guillotine break of a pipe with a 0.8522 ft 2 area.

The peak RCS pressure and reactor trip times for each of the identified break locations are summarized in Table 4-10.

The results in Table 4-10 show that a break in SG B is clearly more limiting than a break in SG A.

The peak RCS pressure for the four break locations in SG B all result in effectively the same peak RCS pressure, but different times for reactor trip. The reactor trip time indicates how quickly the affected SG discharges inventory out of the break. The earliest reactor trip time occurs when the break is in the branch side of the tee connecting the main feedwater line to the side braches. This location allows the SG inventory to reach both sides of the 1.418 ft 2 double-ended guillotine break. Since the total effective break area is larger, the reduction in inventory occurs more quickly. However, as mentioned above, the peak RCS pressure is effectively the same as the peak RCS pressure when the break is located in the main feedwater line before the tee. Furthermore, for both break locations all of the affected SG inventory will be discharged to containment by 60 seconds and the RCS conditions at that time are approximately the same. Therefore, the FWLB transient results are effectively the same for both break locations.

A break in one of the side branches near the SG also allows the SG inventory to reach both sides of the double-ended guillotine break, but the break area in both directions is only 0.8522 ft 2. The net effect is that the reactor trip time is slightly (0.188 sec) longer than the case with a break in the main feed line before the tee. The calculated peak RCS pressure in both cases differs by only 0.10 psi, which is an insignificant difference.

A break in the main feed line just downstream of the isolation check valves requires the longest time to reach the reactor trip setpoint. The peak RCS pressure is slightly less than the case with the break in the main feedwater line right before the tee, but the difference is negligible (2.12 psi).

The break location sensitivity study confirms that the limiting break location for evaluating peak RCS pressure is a double-ended break in the main feedwater pipe in SG B, located shortly before the tee connecting the 18" main feedwater line to the two 14" side branches.

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 29 Figure 4-3: Feedwater Line Break Locations Isolation Check Valve 18" 14" 14" SG Table 4-10: Break Location Sensitivity Study

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 30-4.11 Evaluation of Continued Main Feedwater to Unaffected SG The CR-3 EPU FWLB evaluations conservatively model all feedwater to the unaffected SG as being lost at the start of the event. This conservative approach simplifies the analysis because the effect of control systems on the main feedwater pump speed during the transient can be ignored. This section presents an evaluation that demonstrates the conservatism added to the analysis by not crediting feedwater.

The evaluations with continued feedwater assume that the main feedwater pump speed is maintained at the initial condition value. EFIC actuation isolates feedwater or main feedwater is runback following a reactor trip. Once main feedwater is isolated or runback is.started, the analysis conservatively assumes that all main feedwater is stopped to the unaffected SG in 3.2 seconds for consistency with the LOFW analysis (Section 2.8.5.2.3.2 of the CR-3 EPU LAR).

The detailed feedwater model includes the cross connect piping that exists between the booster pumps and the main feedwater pumps. Therefore, the evaluations with continued feedwater allow flow from the booster pump in loop A to feed the main feedwater pump on the broken loop ifthe transient predicts this behavior. During normal operation, the CR-3 main feedwater system does not have a cross connect between the loops downstream of the main feedwater pumps.

The FWLB evaluations with continued feedwater were performed for several break sizes. The peak RCS pressure and time of reactor trip are summarized in Table 4-11. Table 4-11 also contains the equivalent results when no credit is taken for continued MFW to the unaffected SG.

Table 4-12: Effect of Continued MFW to Unaffected SG The results show that for each break size, the time to reactor trip is longer and the peak RCS pressure is lower when MFW is modeled to reach the unaffected SG. For the limiting break size, the peak RCS pressure is 2875.31 - 2828.24 = 47.07 psi lower when MFW is allowed to reach the unaffected SG. The effect is less at smaller break sizes, but the reduction in peak RCS pressure is still significant.

The above evaluations demonstrate that significant conservatism is included in the FWLB evaluations because of the assumption that all feedwater is lost to the unaffected SG at the start of the event. The margins calculated above do not consider the effect of control systems changing the main feedwater pump speed during the transient. Nevertheless, any flow reaching the unaffected SG would be a benefit.

Controfled Document A

AR EVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 31 4.12 Limiting Feedwater Line Break Conditions and Results The following targeted conditions were found to result in the highest peak RCS pressure during a FWLB transient.

  • Nominal RCS pressure (2170 psia hot leg pressure)
  • Maximum RCS flow (398,850 gpm) a 100.4 %FP
  • BOC (0.0 x 10- *Ak/k/°F MTC, -1.3 x 10" Ak/k/°F DTC, -1400 'F, 0.0070 Peff)
  • 585 'F RCSTave
  • 940 psia turbine header pressure a 80 %OR SG level
  • 290 inch indicated pressurizer level
  • LOOP occurring at turbine trip 0 Double ended guillotine break located in the main feedwater line of SG B right before the tee connecting to the two side branches.

The sequence of events from this case is presented in Table 4-13. The results for the limiting case are presented in Table 4-14. Figures 4-4 through 4-8 plot key transient results for the limiting case.

Controfled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 32 Table 4-13: Sequence of Events for Limiting FWLB Transient Event Time (sec)

Transient initiated 0.0 MFW to both SGs interrupted 1.OE-6 Pressurizer spray begins N/A Peak thermal power occurs 7.9 RPS high RCS pressure trip actuated 10.0 Control rods begin to insert 10.6 Turbine stop valves (TSVs) begin to close LOOP EFIC actuated on low SG-B level 11.5 Initial PSV lift occurs -12.5 Peak RCS pressure occurs 14.7 EFW flow begins 51.5 Affected SG depressurization complete -55.0 Final PSV closure occurs -200.0 Peak Tave occurs -390.0 Transient terminated 600.0 Table 4-14: Results for Limiting FWLB Transient Parameter Value Peak RCS Pressure (psia) 2878.38 Peak thermal power (%RTP) 100.50 Peak Tave (°F) 616.27

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 33 Figure 4-4: FWLB RCS Peak Pressure versus Time 3000 2900 2800 2700 2600 0

2500 U. 2400 P4.

2300 2200 2100 2000

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 34 Figure 4-5: FWLB RCS Temperatures versus Time 650 640 630 620 610 600 2

0 590 o.-

. 580 570 560 550 540 530 100 200 300 400 500 600 700 800 Time (s)

Controiled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivitv Studies Page 35 Figure 4-6: FWLB Pressurizer Level versus Time 44 42 40 38 0

0

.r E

36 0

0) 34 N 32 30 28 26 24 400 Time (s)

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 36 Figure 4-7: FWLB SG Pressures versus Time I-0 0.

400 Time (s)

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 37 Figure 4-8: FWLB SG Levels versus Time U-(-)

Time (s)

Controlled Document A

AREVA ANP-3114(NP)

CR-3 EPU Feedwater Line Break Analysis Revision 0 Sensitivity Studies Page 38

5.0 REFERENCES

1. BAW-10164PA-06, "RELAP5/MOD2-B&W- An Advanced Computer Program for Light Water Reactor LOCA and Non-LOCA Transient Analysis."
2. BAW-1 01 93PA-00, "RELAP5/MOD2-B&W for Safety Analysis of B&W-Designed Pressurizer Water Reactors."