ML12284A378: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/26/2012
| issue date = 09/26/2012
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-3 Rev 1
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-3 Rev 1
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Nelson J
| addressee name = Nelson J
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generating Station            Scenario No.: ILT-N-3          Class ID: 11-1 (2012-301)
Evaluators                                          Operators          / crew position
                                                                                      / ATC
                                                                                      / BOP
                                                                                      / CRS Initial Conditions: Initial Power = 5%
Turnover:            Startup in Progress. On hold for QNE direction Event          Malf.              Event                                    Event No.          No.                Type*                                Description 1      RODK08DO            C/T      ATC    CRD - Control Rod, Drifts Out 2        RDFCFHI              C      ATC    CRD - Controller, Indication Fails Upscale 3      CSPPBBRK            C/T      BOP    CORE SPRAY - System Leak / Localized Flooding 4          H21              C      ATC    FW - Cond/Bstr Pump, Trips Due To Overcurrent Manual Scram - Loss Of All Feedwater, Due To Trip of All 5      H32/H33/H34            M      TEAM RFPs.
B12 SER1026                            ATWS - Electrical, ARI Unsuccessful / Team Inserts Rods 6                            M      TEAM SER1060                            By Pulling Scram Fuses.
AW4
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105}}

Latest revision as of 22:27, 11 November 2019

2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-3 Rev 1
ML12284A378
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: David Reeser
Operations Branch III
To: Nelson J
Exelon Generation Co
Shared Package
ML11354A121 List:
References
Download: ML12284A378 (1)


Text

TQ-AA-151-F10 Revision 0 Page 1 of 1 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-3 Class ID: 11-1 (2012-301)

Evaluators Operators / crew position

/ ATC

/ BOP

/ CRS Initial Conditions: Initial Power = 5%

Turnover: Startup in Progress. On hold for QNE direction Event Malf. Event Event No. No. Type* Description 1 RODK08DO C/T ATC CRD - Control Rod, Drifts Out 2 RDFCFHI C ATC CRD - Controller, Indication Fails Upscale 3 CSPPBBRK C/T BOP CORE SPRAY - System Leak / Localized Flooding 4 H21 C ATC FW - Cond/Bstr Pump, Trips Due To Overcurrent Manual Scram - Loss Of All Feedwater, Due To Trip of All 5 H32/H33/H34 M TEAM RFPs.

B12 SER1026 ATWS - Electrical, ARI Unsuccessful / Team Inserts Rods 6 M TEAM SER1060 By Pulling Scram Fuses.

AW4

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec SRRS: 3D.105