ML12132A323
| ML12132A323 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/05/2012 |
| From: | David Reeser Operations Branch III |
| To: | Nelson J Exelon Generation Co |
| Shared Package | |
| ML11354A121 | List: |
| References | |
| Download: ML12132A323 (1) | |
Text
TQ-AA-151-F10 Revision 0 Page 1 of 1 SRRS: 3D.105 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-1 Class ID:
Evaluators Operators
/ crew position 11-1 (2012-301)
/ ATC
/ BOP Initial Conditions:
/ CRS Initial Power = 75%
Turnover:
Lower Reactor Power with Recirc Event No.
Malf.
No.
Event Type*
Event Description 1
NONE R
ATC RECIRC - Reactivity, Lower Power Using Recirculation Flow 2
NONE C
BOP INST AIR - Compressor, Swap Due To Oil Leak 3
SER1589 SER0710 T18 C / T BOP AUX POWER - EDG Inop Due To Cooling Water Pump Failure 4
RDFILTB C
ATC CRD - Pump, Swap Due To Suction Filter Plugging 5
B15 NVM100BP I / T ATC NBI - MR Level Inst, Fails With Partial Half Scram 6
HP6 HP7 C
BOP CIRC WATER - Pump, Trip Due To Overcurrent 7
HP5 M
TEAM Manual Scram - Loss Of Main Condenser Vacuum.
8 AT5 NVM100BP NVML29AP NVML29BP NVML112P M
TEAM FLOODING - Loss of RPV Level Indication Due To Loss of Instrument Power And Transmitter Failures.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec