ML12284A378

From kanterella
Jump to navigation Jump to search
2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-3 Rev 1
ML12284A378
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/26/2012
From: David Reeser
Operations Branch III
To: Nelson J
Exelon Generation Co
Shared Package
ML11354A121 List:
References
Download: ML12284A378 (1)


Text

TQ-AA-151-F10 Revision 0 Page 1 of 1 SRRS: 3D.105 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-3 Class ID:

Evaluators Operators

/ crew position 11-1 (2012-301)

/ ATC

/ BOP Initial Conditions:

/ CRS Initial Power = 5%

Turnover:

Startup in Progress. On hold for QNE direction Event No.

Malf.

No.

Event Type*

Event Description 1

RODK08DO C / T ATC CRD - Control Rod, Drifts Out 2

RDFCFHI C

ATC CRD - Controller, Indication Fails Upscale 3

CSPPBBRK C / T BOP CORE SPRAY - System Leak / Localized Flooding 4

H21 C

ATC FW - Cond/Bstr Pump, Trips Due To Overcurrent 5

H32/H33/H34 M

TEAM Manual Scram - Loss Of All Feedwater, Due To Trip of All RFPs.

6 B12 SER1026 SER1060 AW4 M

TEAM ATWS - Electrical, ARI Unsuccessful / Team Inserts Rods By Pulling Scram Fuses.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec