ML12284A378
| ML12284A378 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 09/26/2012 |
| From: | David Reeser Operations Branch III |
| To: | Nelson J Exelon Generation Co |
| Shared Package | |
| ML11354A121 | List: |
| References | |
| Download: ML12284A378 (1) | |
Text
TQ-AA-151-F10 Revision 0 Page 1 of 1 SRRS: 3D.105 Scenario Outline Station: Dresden Generating Station Scenario No.: ILT-N-3 Class ID:
Evaluators Operators
/ crew position 11-1 (2012-301)
/ ATC
/ BOP Initial Conditions:
/ CRS Initial Power = 5%
Turnover:
Startup in Progress. On hold for QNE direction Event No.
Malf.
No.
Event Type*
Event Description 1
RODK08DO C / T ATC CRD - Control Rod, Drifts Out 2
RDFCFHI C
ATC CRD - Controller, Indication Fails Upscale 3
CSPPBBRK C / T BOP CORE SPRAY - System Leak / Localized Flooding 4
H21 C
ATC FW - Cond/Bstr Pump, Trips Due To Overcurrent 5
H32/H33/H34 M
TEAM Manual Scram - Loss Of All Feedwater, Due To Trip of All RFPs.
6 B12 SER1026 SER1060 AW4 M
TEAM ATWS - Electrical, ARI Unsuccessful / Team Inserts Rods By Pulling Scram Fuses.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec