| | issue date = 02/26/2013 | | | issue date = 02/26/2013 |
| | title = Request Schedule Suspension for the Safety Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) | | | title = Request Schedule Suspension for the Safety Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) |
| | author name = Lubinski J W | | | author name = Lubinski J |
| | author affiliation = NRC/NRR/DLR | | | author affiliation = NRC/NRR/DLR |
| | addressee name = Rencurrel D W | | | addressee name = Rencurrel D |
| | addressee affiliation = South Texas Project Nuclear Operating Co | | | addressee affiliation = South Texas Project Nuclear Operating Co |
| | docket = 05000498, 05000499 | | | docket = 05000498, 05000499 |
Line 14: |
Line 14: |
| | document type = Letter, Schedule and Calendars | | | document type = Letter, Schedule and Calendars |
| | page count = 5 | | | page count = 5 |
| | | project = TAC:ME4936, TAC:ME4937 |
| | | stage = Approval |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 26, 2013 Mr. D. W. Rencurrel Sr. Vice President STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483 |
| | |
| | ==SUBJECT:== |
| | REQUESTED SCHEDULE SUSPENSION FOR THE SAFETY REVIEW OF THE SOUTH TEXAS PRO ..IECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937) |
| | |
| | ==Dear Mr. Rencurrel:== |
| | |
| | By letter dated October 25,2010, South Texas Project Nuclear Operating Company (STPNOC) submitted a license renewal application (LRA) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, to renew the South Texas Project (STP), |
| | Units 1 and 2, operating licenses NPF-076 and NPF-080, respectively, for review by the U.S. |
| | Nuclear Regulatory Commission (NRC or the staff). In your letter dated December 11,2012, you requested a temporary suspension of the safety review of the LRA for calendar year 2013, except to the limited extent necessary to issue the Safety Evaluation Report (SER) with Open Items and place the work in a status that can be readily resumed in 2014 without duplicating effort. The letter also states that STPNOC desires to refocus resources to support the near-term operations of Units 1 and 2, and to work on current open issues associated with the LRA. |
| | The staff agrees with the request subject to the following observations: |
| | * The staff completed its SER with the open items as of December 2012 in order to efficiently document the status of the project to date. |
| | * The staff understands that you will continue to provide annual updates in accordance with 10 CFR 54.21 (b), and you will respond to the outstanding requests for additional information (RAls) in 2014 upon resumption of the safety review. |
| | * The staff has issued RAI B2.1.37-5, which is the RAI related to the open item on your Selective Leaching of Aluminum Bronze aging management program. |
| | * The staff understands that you intend to continue supporting the environmental review of the LRA and that no suspension of the environmental review is requested. |
| | * The staff will continue to manage the project on a minimal basis and to track the status of any developments in the selective leaching of aluminum bronze issue. |
| | |
| | D.W. Rencurrel -2 This letter and the enclosed safety review schedule update will be posted to the website reflecting the pause in activities to inform the public. If you have any questions on this course of action, please contact Mr. John Daily, project manager for the safety review of the STP, Units 1 and 2, LRA, by telephone at 301-415-3873 or bye-mail at o:. :. .;h"-,,n.:. :;.d;o: :. :.:. *~c:....:..:....::..:..o::L.::"":" |
| | --=' |
| | Docket Nos. 50-498 and 50-499 |
| | |
| | ==Enclosure:== |
| | |
| | Revised Schedule cc w/encl: Listserv |
| | |
| | SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION UPDATED SAFETY REVIEW SCHEDULE |
| | ,, |
| | ,Schedule' .' ,Actual |
| | , |
| | " " |
| | Milestone, |
| | " |
| | :' 'C' Receive license renewal application (LRA) 10/26/10 10/28/10 Publish Federal Register Notice (FRN) - LRA availability 12/09/10 12/09/10 Public Meeting - License Renewal Overview and Environmental Scoping 03/02/11 03/02/11 Deadline for filing hearing requests and petitions for intervention 03/14/11 03/14/11 Audit - Scoping & Screening Audit Methodology 05/16/11 05/20/11 Audit - Aging Management Programs 06/13/11 06/24/11 Issue safety evaluation report (SER) with open items 02/2013* 02/2013 Advisory Committee on Reactor Safeguards (ACRS) Subcommittee TBD Issue final SER TBD ACRS full committee meeting TBD Decision - Director, Office of Nuclear Reactor Regulation (if no hearing) TBD Commission decision (if hearing) TBD |
| | *Safety Review Portion of the Schedule is temporarily paused until 2014 at request of the applicant ENCLOSURE |
| | |
| | D.W. Rencurrel -2 This letter and the enclosed safety review schedule update will be posted to the website reflecting the pause in activities to inform the public. If you have any questions on this course of action, please contact Mr. John Daily, project manager for the safety review of the STP, Units 1 and 2, LRA, by telephone at 301-415-3873 or bye-mail at john.daily@nrc.gov. |
| | Sincerely, IRA! |
| | John W. Lubinski, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50:-499 |
| | |
| | ==Enclosure:== |
| | |
| | Revised Schedule cc w/encl: Listserv DISTRIBUTION: See next page ADAMS Accession No'.. ML13052A382 *concurred via email OFFICE LA:DLR/RPB1 PM:DLR/RPB1 BC:DLR/RPB2 BC:DLR/RPB1 D:DLR NAME IKing JDaily DWrona DMorey JLubinski DATE I 2/22/13 2/24/13 I 2/26/13 2/26/13 2/26/13 OFFICIAL RECORD COpy |
| | |
| | Letter to D. W. Rencurrel from J. Lubinski dated February 26,2013 |
| | |
| | ==SUBJECT:== |
| | REQUESTED SCHEDULE SUSPENSION FOR THE SAFETY REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937) |
| | DISTRIBUTION: |
| | . HARD COPY: |
| | DLRRF E-MAIL: |
| | PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran ABuford DMclntyre, OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV SGraves, RIV}} |
Letter Sequence Approval |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: ML110620203, ML11140A163, ML11224A265, ML11230A003, ML11318A121, ML11318A122, ML11318A123, ML11318A124, ML11318A125, ML11318A126, ML11318A127, ML11318A128, ML11318A129, ML11318A130, ML11318A131, ML11318A132, ML11318A133, ML11318A135, ML11318A136, ML11318A138, ML11318A139, ML11318A140, ML11318A141, ML11318A142, ML11318A143, ML11318A144, ML11318A145, ML11318A146, ML11318A147, ML11318A148, ML11318A149, ML11318A150, ML11318A151, ML11318A152, ML11318A153, ML11318A154, ML11318A155, ML11318A156, ML11318A157, ML11318A158, ML11318A159, ML11318A160, ML11318A161, ML11318A162, ML11318A163, ML11318A164, ML11318A165, ML11318A166, ML11318A167, ML11318A168... further results
|
MONTHYEARML1106202032011-03-17017 March 2011 License Renewal Application Online Reference Portal Project stage: Other ML1108907642011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application-Electrical Branch Scoping Project stage: RAI ML1108205792011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application -Section 2.4 Structural (TAC Nos. ME4936, ME4937) Project stage: RAI ML1108309782011-04-14014 April 2011 Request for Additional Information for the Review of the South Texas Project, License Renewal Application, Fire Protection and Component Integrity (TAC Nos. ME4536 ME4637 Project stage: RAI NOC-AE-11002670, Response to Request for Additional Information for License Renewal Application2011-05-0505 May 2011 Response to Request for Additional Information for License Renewal Application Project stage: Response to RAI NOC-AE-11002672, Response to Request for Additional Information for Licence Renewal Application2011-05-12012 May 2011 Response to Request for Additional Information for Licence Renewal Application Project stage: Response to RAI ML11137A0922011-05-24024 May 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application Future Consideration of Operating Experience Project stage: RAI ML11140A1632011-06-0606 June 2011 Plan for the Aging Management Program Regulatory Audit Regarding the South Texas Project, Units 1 and 2 License Renewal Application Review (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002681, Amendment 2 to the License Renewal Application2011-06-16016 June 2011 Amendment 2 to the License Renewal Application Project stage: Other NOC-AE-11002683, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-06-23023 June 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML11154A0132011-07-0606 July 2011 Summary of Telephone Conference Call Held on May 23, 2011, Between the NRC and STPNOC, Concerning Requests for Additional Information Pertaining to the South Texas Project, LRA-Future Consideration of Operating Experience Project stage: RAI ML11166A2392011-07-12012 July 2011 Letter Request for Additional Information for South Texas Project Electric Generating Station, Units 1 and 2 License Renewal Application - Scoping and Screening Balance of Plant (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11201A0552011-07-28028 July 2011 Requests for Additional Information for the Review of the South Texas Project, License Renewal Application - Scoping and Screening Audit (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002702, Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application2011-08-0909 August 2011 Response to Request for Additional Information for the Review of the South Texas Project License Renewal Application Project stage: Response to RAI ML11214A0882011-08-15015 August 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Plant Systems (TAC ME4936 and ME4937) Project stage: RAI ML11214A0052011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Structures/Electrical (TAC ME4936 and ME4937) Project stage: RAI ML11214A0272011-08-15015 August 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Programs Audit, Reactor Systems (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002716, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-18018 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML1123000162011-08-18018 August 2011 License Renewal - Errata in AMP RAI Package Project stage: RAI NOC-AE-11002714, Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937)2011-08-23023 August 2011 Response to Request for Additional Information for the South Texas Project License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) Project stage: Other NOC-AE-11002730, Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Request for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002731, Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937)2011-09-15015 September 2011 Response to Requests for Additional Information for License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Response to RAI ML1124402012011-09-21021 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 2 (TAC Nos. ME4936, ME4937) Project stage: RAI ML11250A0432011-09-22022 September 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Other ML11258A1612011-09-22022 September 2011 Request for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 3 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11272A1652011-10-0404 October 2011 Summary of Telephone Conference Call Held on September 28, 2011, Between the NRC and STP Nuclear Operating Company, Concerning Request for Additional Information Pertaining to the South Texas Project, LRA (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002732, Response to Requests for Additional Information for the License Renewal Application2011-10-10010 October 2011 Response to Requests for Additional Information for the License Renewal Application Project stage: Response to RAI ML11273A0172011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 5 (TAC Nos. ME4936 and ME4937) Project stage: RAI ML11273A0082011-10-11011 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Review, Set 4 (TAC Nos. ME4936 and ME4937) Project stage: RAI NOC-AE-11002737, Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937)2011-10-18018 October 2011 Supplement to License Renewal Application (TAC Nos. ME4936 and ME4937) Project stage: Supplement ML11277A0472011-10-18018 October 2011 Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2, License Renewal Application - Aging Management Program, Set 6 Project stage: RAI ML11305A0762011-10-25025 October 2011 Response to Requests for Additional Information for License Renewal Application (TAC ME4936 and ME4937) Project stage: Response to RAI NOC-AE-11002756, Contact Information Change, License Renewal Application (TAC ME4936 and ME4937)2011-10-26026 October 2011 Contact Information Change, License Renewal Application (TAC ME4936 and ME4937) Project stage: Other ML11318A1792011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1802011-11-0303 November 2011 Drawing No. LR-STP-WS-6R329F05048#1, Rev. 1, Piping and Instrumentation Diagram Solid Waste Processing System Project stage: Other ML11318A1762011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F05024#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1652011-11-0303 November 2011 Drawing No. LR-STP-PS9Z329Z00047#1, Rev. 1, Piping and Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1642011-11-0303 November 2011 Drawing No. LR-STP-PS-5Z329Z00045#2, Rev. 1, Piping & Instrumentation Diagram Primary Sampling System. Project stage: Other ML11318A1782011-11-0303 November 2011 Drawing No. LR-STP-WL-7R309F90021#1, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System Project stage: Other ML11318A1682011-11-0303 November 2011 Drawing No. LR-STP-RC-5R149F05004#2, Rev. 1, Piping and Instrumentation Diagram Acs Pressurizer Relief Tank. Project stage: Other ML11318A1722011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05022#2, Rev. 1, Piping and Instrumentation Diagram Liquid Waste Processing System. Project stage: Other ML11318A1702011-11-0303 November 2011 Drawing No. LR-STP-RM-5R279F05033#2, Rev. 1, Piping & Instrumentation Reactor Makeup Water System. Project stage: Other ML11318A1602011-11-0303 November 2011 Drawing No. LR-STP-IA-8Q119F05050#2, Rev. 1, Piping & Instrumentation Diagram Mechanical Aux. Building Instrument Air. Project stage: Other NOC-AE-11002749, Drawing No. LR-STP-SB-7S209F200032, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System2011-11-0303 November 2011 Drawing No. LR-STP-SB-7S209F20003#2, Rev. 0, Piping and Instrumentation Diagram Steam Generator Blowdown System Project stage: Other ML11318A1742011-11-0303 November 2011 Drawing No. LR-STP-WL-5R309F05027#2, Rev. 1, Piping & Instrumentation Diagram Auxiliary Steam and Condensate Return System (Lwps) Project stage: Other ML11318A1462011-11-0303 November 2011 Drawing LR-STP-ED-5Q069F05030 #2, Rev. 17, Piping & Instrumentation Diagram Radioactive Vent & Drain System Sump Pumps. Project stage: Other ML11318A1552011-11-0303 November 2011 Drawing No. LR-STP-FP-7Q272F00046, Rev. 1, Piping and Instrumentation Diagram Fire Protection Loop. Project stage: Other ML11318A1482011-11-0303 November 2011 Drawing No. LR-STP-ED-5Q069F90011#2, Revision 1, Piping & Instrumentation Diagram Radioactive Vent and Drain System Fuel Handling Building Gravity Drains. Project stage: Other 2011-06-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20243012024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 NOC-AE-240040, Application for Order Consenting to Direct Transfer of Licenses2024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual NOC-AE-240040, Operator Licensinq Examination Schedule Revision 32024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 NOC-AE-240040, Annual Dose Report for 20232024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Financial Assurance for Decommissioning - 2024 Update2024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) ML24017A2972024-02-15015 February 2024 Project Manager Assignment NOC-AE-240040, Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation2024-02-0808 February 2024 Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation ML24039A1112024-02-0808 February 2024 Operator Licensing Examination Schedule Revision 2 ML24039A1602024-02-0808 February 2024 Unit L & 2, Supplement to Modify the Implementation Date for License Amendment Request to Revise Alternate Source Term Dose Calculation ML24033A3002024-02-0707 February 2024 Summary of Regulatory Audit Regarding a Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML24038A3342024-02-0707 February 2024 Change to South Texas Project Electric Generating Station (Stepgs) Emergency Plan 2024-09-11
[Table view] Category:Schedule and Calendars
MONTHYEARML24039A1112024-02-0808 February 2024 Operator Licensing Examination Schedule Revision 2 ML23263B1132023-09-20020 September 2023 Operator Licensing Examination Schedule Revision 1 ML23180A2822023-06-29029 June 2023 Operator Licensing Examination Schedule ML22081A3792022-03-22022 March 2022 Operator Licensing Examination Schedule NOC-AE-14003138, Operator Licensing Examination Schedule2014-05-14014 May 2014 Operator Licensing Examination Schedule ML13198A0562013-07-26026 July 2013 STP Schedule Change_0713 NOC-AE-13003018, Operator Licensing Examination Schedule2013-07-0909 July 2013 Operator Licensing Examination Schedule ML13052A3822013-02-26026 February 2013 Request Schedule Suspension for the Safety Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) ML13011A1312013-02-11011 February 2013 Revision of Schedule for the Conduct of Environmental Review of the South Texas Project License Renewal Application (TAC Nos. ME5122, ME5123, ME4938, and ME939) ML12254A0572012-09-27027 September 2012 Schedule Revision for the Safety Review of the South Texas Project, Units 1 and 2, License Renewal Application (TAC Nos. ME4936 and ME4937) ML1103404782011-02-28028 February 2011 Schedule for the Conduct of Review of the South Texas Project, Units 1 and 2 License Renewal Application NOC-AE-10002581, Operator Licensing National Examination Schedule.2010-07-26026 July 2010 Operator Licensing National Examination Schedule. NOC-AE-07002197, Operator Licensing National Examination Schedule.2007-07-26026 July 2007 Operator Licensing National Examination Schedule. ML0721502092007-07-26026 July 2007 Project, Units 1 and 2, Operator Licensing National Examination Schedule. NOC-AE-07002120, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds - Revised2007-02-22022 February 2007 Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds - Revised NOC-AE-06002063, Operator Licensing National Examination Schedule.2006-09-11011 September 2006 Operator Licensing National Examination Schedule. 2024-02-08
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 26, 2013 Mr. D. W. Rencurrel Sr. Vice President STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
REQUESTED SCHEDULE SUSPENSION FOR THE SAFETY REVIEW OF THE SOUTH TEXAS PRO ..IECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937)
Dear Mr. Rencurrel:
By letter dated October 25,2010, South Texas Project Nuclear Operating Company (STPNOC) submitted a license renewal application (LRA) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 51 and 10 CFR Part 54, to renew the South Texas Project (STP),
Units 1 and 2, operating licenses NPF-076 and NPF-080, respectively, for review by the U.S.
Nuclear Regulatory Commission (NRC or the staff). In your letter dated December 11,2012, you requested a temporary suspension of the safety review of the LRA for calendar year 2013, except to the limited extent necessary to issue the Safety Evaluation Report (SER) with Open Items and place the work in a status that can be readily resumed in 2014 without duplicating effort. The letter also states that STPNOC desires to refocus resources to support the near-term operations of Units 1 and 2, and to work on current open issues associated with the LRA.
The staff agrees with the request subject to the following observations:
- The staff completed its SER with the open items as of December 2012 in order to efficiently document the status of the project to date.
- The staff understands that you will continue to provide annual updates in accordance with 10 CFR 54.21 (b), and you will respond to the outstanding requests for additional information (RAls) in 2014 upon resumption of the safety review.
- The staff understands that you intend to continue supporting the environmental review of the LRA and that no suspension of the environmental review is requested.
- The staff will continue to manage the project on a minimal basis and to track the status of any developments in the selective leaching of aluminum bronze issue.
D.W. Rencurrel -2 This letter and the enclosed safety review schedule update will be posted to the website reflecting the pause in activities to inform the public. If you have any questions on this course of action, please contact Mr. John Daily, project manager for the safety review of the STP, Units 1 and 2, LRA, by telephone at 301-415-3873 or bye-mail at o:. :. .;h"-,,n.:. :;.d;o: :. :.:. *~c:....:..:....::..:..o::L.::"":"
--='
Docket Nos. 50-498 and 50-499
Enclosure:
Revised Schedule cc w/encl: Listserv
SOUTH TEXAS PROJECT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION UPDATED SAFETY REVIEW SCHEDULE
,,
,Schedule' .' ,Actual
,
" "
Milestone,
"
- ' 'C' Receive license renewal application (LRA) 10/26/10 10/28/10 Publish Federal Register Notice (FRN) - LRA availability 12/09/10 12/09/10 Public Meeting - License Renewal Overview and Environmental Scoping 03/02/11 03/02/11 Deadline for filing hearing requests and petitions for intervention 03/14/11 03/14/11 Audit - Scoping & Screening Audit Methodology 05/16/11 05/20/11 Audit - Aging Management Programs 06/13/11 06/24/11 Issue safety evaluation report (SER) with open items 02/2013* 02/2013 Advisory Committee on Reactor Safeguards (ACRS) Subcommittee TBD Issue final SER TBD ACRS full committee meeting TBD Decision - Director, Office of Nuclear Reactor Regulation (if no hearing) TBD Commission decision (if hearing) TBD
- Safety Review Portion of the Schedule is temporarily paused until 2014 at request of the applicant ENCLOSURE
D.W. Rencurrel -2 This letter and the enclosed safety review schedule update will be posted to the website reflecting the pause in activities to inform the public. If you have any questions on this course of action, please contact Mr. John Daily, project manager for the safety review of the STP, Units 1 and 2, LRA, by telephone at 301-415-3873 or bye-mail at john.daily@nrc.gov.
Sincerely, IRA!
John W. Lubinski, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50:-499
Enclosure:
Revised Schedule cc w/encl: Listserv DISTRIBUTION: See next page ADAMS Accession No'.. ML13052A382 *concurred via email OFFICE LA:DLR/RPB1 PM:DLR/RPB1 BC:DLR/RPB2 BC:DLR/RPB1 D:DLR NAME IKing JDaily DWrona DMorey JLubinski DATE I 2/22/13 2/24/13 I 2/26/13 2/26/13 2/26/13 OFFICIAL RECORD COpy
Letter to D. W. Rencurrel from J. Lubinski dated February 26,2013
SUBJECT:
REQUESTED SCHEDULE SUSPENSION FOR THE SAFETY REVIEW OF THE SOUTH TEXAS PROJECT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. ME4936 AND ME4937)
DISTRIBUTION:
. HARD COPY:
DLRRF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsNrrDraApla Resource RidsOgcMailCenter JDaily TTran ABuford DMclntyre, OPA BSingal, DORL WWalker, RIV JDixon, RIV BTharakan, RIV WMaier, RIV VDricks, RIV NOKeefe, RIV AVegel, RIV SGraves, RIV