ML13070A344: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 8, 2013  
{{#Wiki_filter:March 8, 2013 MEMORANDUM TO:           Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                     Richard B. Ennis, Senior Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation FROM:   Richard B. Ennis, Senior Project Manager  
/ra/ Plant Licensing Branch I-2  
 
Division of Operating Reactor Licensing  
 
Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.  
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
 
ME9085 AND ME9086)
ME9085 AND ME9086)  
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to  
Docket Nos. 50-277 and 50-278
 
Mr. Thomas Loomis of Exelon Generation Com pany, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the  
 
licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal  
 
heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is  
 
considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs  
 
currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water  
 
temperature does not exceed 92 °F. The proposed amendment would change the NHS water  
 
temperature limit such that the NHS would be considerable operable as long as the maximum  
 
water temperature was less than or equal to 92 °F.  
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the  
 
regulatory basis for the questions is clear, and to determine if the information was previously  
 
docketed. This memorandum and the attachment do not convey or represent an NRC staff  
 
position regarding the licensee's request.  
 
Docket Nos. 50-277 and 50-278  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI
 
March 8, 2013
 
MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2
 
Division of Operating Reactor Licensing
 
Office of Nuclear Reactor Regulation FROM:  Richard B. Ennis, Senior Project Manager
/ra/ Plant Licensing Branch I-2
 
Division of Operating Reactor Licensing


Office of Nuclear Reactor Regulation  
March 8, 2013 MEMORANDUM TO:            Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                    Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.  
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
 
ME9085 AND ME9086)
ME9085 AND ME9086)  
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to  
Docket Nos. 50-277 and 50-278
 
Mr. Thomas Loomis of Exelon Generation Com pany, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the  
 
licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal  
 
heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is  
 
considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs  
 
currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water  
 
temperature does not exceed 92 °F. The proposed amendment would change the NHS water  
 
temperature limit such that the NHS would be considerable operable as long as the maximum  
 
water temperature was less than or equal to 92 °F.  
 
The draft RAI was sent to Exelon to ensure that the questions are understandable, the  
 
regulatory basis for the questions is clear, and to determine if the information was previously  
 
docketed. This memorandum and the attachment do not convey or represent an NRC staff  
 
position regarding the licensee's request.  
 
Docket Nos. 50-277 and 50-278  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI DISTRIBUTION PUBLIC                                             ASallman, SCVB LPL1-2 R/F                                         CRoque Cruz, SBPB RidsNrrDorlLpl1-2 Resource                         MHamm, STSB RidsNrrDorlDpr Resource                           SSun, SRXB RidsNrrPMPeachBottom Resource ACCESSION NO.: ML13070A344 OFFICE       LPL1-2/PM NAME         REnnis DATE         03/08/2013
 
DISTRIBUTION PUBLIC ASallman, SCVB LPL1-2 R/F CRoque Cruz, SBPB RidsNrrDorlLpl1-2 Resource MHamm, STSB RidsNrrDorlDpr Resource SSun, SRXB RidsNrrPMPeachBottom Resource ACCESSION NO.: ML13070A344 OFFICE LPL1-2/PM NAME REnnis DATE 03/08/2013 OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISE NORMAL HEAT SINK OPERABILITY REQUIREMENTS PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278
 
By letter to the Nuclear Regulatory Commission (NRC) dated July 18, 2012, as supplemented
 
on January 17, 2013 (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML12200A388 and ML13018A225, res pectively), Exelon Generation Company, LLC (Exelon, the licensee), submitted a licens e amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would revise the Technical
 
Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The


NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a  
OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISE NORMAL HEAT SINK OPERABILITY REQUIREMENTS PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated July 18, 2012, as supplemented on January 17, 2013 (Agencywide Documents Access and Management System (ADAMS)
 
Accession Nos. ML12200A388 and ML13018A225, respectively), Exelon Generation Company, LLC (Exelon, the licensee), submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation  
The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal.
 
SBPB RAI-1
to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS  
 
water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed  
 
92 F. The proposed amendment would change the NHS water temperature limit such that the  
 
NHS would be considerable operable as long as the maximum water temperature was less than  
 
or equal to 92 °F.  
 
The NRC staff has reviewed the information the licensee provided that supports the proposed  
 
amendment and would like to discuss the following issues to clarify the submittal.
SBPB RAI-1  


===Background===
===Background===
TS 3.7.2, Emergency Service Water (ESW) System and Normal Heat Sink, Limiting Condition for Operation (LCO) Required Action B.1 currently requires that the licensee verify that the water temperature of the NHS is  90 °F, averaged over the previous 24-hour period, if the water temperature of the NHS is > 90 °F and  92 °F. The completion time for this action is once per hour. The TS Bases for TS 3.7.2 Required Action B.1 state, in part, that:
With water temperature of the normal heat sink > 90 °F and  92 °F, the design basis assumptions associated with the initial normal heat sink temperature are bounded provided the temperature of the normal heat sink when averaged over the previous 24 hour period is  92 °F. To ensure that the 90 °F normal heat sink temperature limit is not exceeded, Required Action B.1 is provided to more frequently monitor the temperature of the normal heat sink. The Unit 2 normal heat sink temperature is measured from the Unit 2 intake canal. The once per hour completion time takes into consideration normal heat sink temperature variations and the increased monitoring frequency needed to ensure design basis assumptions and equipment limitations are not exceeded in this condition. [emphasis added]
Attachment


TS 3.7.2, "Emergency Service Water (ESW)
Surveillance Requirement (SR) 3.7.2.2 currently requires the licensee to verify that the average water temperature of the NHS is  90 °F. The SR frequency is in accordance with the Surveillance Frequency Control Program. In accordance with TS 5.5.14, Surveillance Frequency Control Program, the program shall ensure that SRs specified in the TSs are performed at intervals sufficient to assure the associated LCOs are met. PBAPS Surveillance Test procedure ST-0-098-01N-2, Daily Surveillance Log Mode 1, 2, 3 currently requires that the licensee verify and document the NHS temperature once every 24 hours as long as NHS temperature is not above 90 °F.
System and Normal Heat Sink," Limiting Condition for Operation (LCO) Required Action B.1 currently requires that the licensee verify that the water temperature of the NHS is  90 °F, averaged over the previous 24-hour period, if the water temperature of the NHS is > 90 °F and  92 °F. The completion time for this action is once per hour. The TS Bases for TS 3.7.2 Required Action B.1 state, in part, that:
Issue The proposed amendment would delete the LCO actions associated with verifying the NHS water temperature on an hourly basis when the temperature approaches the operability limit.
 
As currently proposed, assuming no changes to the Surveillance Frequency Control Program, the NHS water temperature would be verified only once per 24 hours. Due to temperature variations over this time period, this 24-hour surveillance frequency may not be sufficient to provide reasonable assurance that design basis assumptions will be met.
With water temperature of the normal heat sink > 90 °F and  92 °F, the design basis assumptions associated with the initial normal heat sink temperature are
Request Please provide additional justification to provide assurance that the frequency of surveillance is sufficient to assure that design basis assumptions will continue to be met.
 
SBPB RAI-2
bounded provided the temperature of the normal heat sink when averaged over the previous 24 hour period is  92 °F. To ensure that the 90 °F normal heat sink temperature limit is not exceeded, Required Action B.1 is provided to more frequently monitor the temperature of the normal heat sink.
The Unit 2 normal heat sink temperature is meas ured from the Unit 2 intake canal.
The once per hour completion time takes into consideration normal heat sink temperature variations and the increased monitoring frequency needed to
 
ensure design basis assumptions and equipment limitations are not
 
exceeded in this condition. [emphasis added]
Attachment 
 
Surveillance Requirement (SR) 3.7.2.2 currently r equires the licensee to verify that the average water temperature of the NHS is  90 °F. The SR frequency is in accordance with the Surveillance Frequency Control Program. In accordance with TS 5.5.14, "Surveillance  
 
Frequency Control Program," the program shall ensure that SRs specified in the TSs are performed at intervals sufficient to assure the associated LCOs are met. PBAPS Surveillance  
 
Test procedure ST-0-098-01N-2, "Daily Surveillance Log Mode 1, 2, 3" currently requires that the licensee verify and document the NHS temperature once every 24 hours as long as NHS  
 
temperature is not above 90 °F.  
 
Issue The proposed amendment would delete the LCO actions associated with verifying the NHS  
 
water temperature on an hourly basis when t he temperature approaches the operability limit.
As currently proposed, assuming no changes to the Surveillance Frequency Control Program, the NHS water temperature would be verified only once per 24 hours. Due to temperature  
 
variations over this time period, this 24-hour surveillance frequency may not be sufficient to  
 
provide reasonable assurance that design basis assumptions will be met.  
 
Request Please provide additional justification to provide a ssurance that the frequency of surveillance is sufficient to assure that design basis assumptions will continue to be met.  
 
SBPB RAI-2  


===Background===
===Background===
 
The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F. The application dated July 18, 2012, states that [a]ll design basis analyses use 92 °F or greater as an input or determine that the maximum allowable NHS temperature is greater than or equal to 92 °F. The supplement dated January 17, 2013, states that the temperature elements used to measure the NHS water temperature have an accuracy of
The proposed amendment would change the NHS water temperature limit such that the NHS  
+/- 0.28 °F.
 
Issue In order to ensure that the plant is maintained within the bounds of various analyses, instrument uncertainties and other uncertainties need to be accounted for in the TS limit, plant procedures or in the analyses. It is not clear that instrument uncertainties and other potential uncertainties have been taken into consideration.
would be considerable operable as long as the maximum water temperature was less than or  
Request Please provide additional justification to provide assurance that instrument uncertainties and other potential uncertainties have been accounted for to assure that design basis assumptions will continue to be met.}}
 
equal to 92 °F. The application dated July 18, 2012, states that "[a]ll design basis analyses use  
 
92 °F or greater as an input or determine that the maximum allowable NHS temperature is  
 
greater than or equal to 92 °F. The supplement dated January 17, 2013, states that the  
 
temperature elements used to measure the NHS water temperature have an accuracy of
+/- 0.28 °F.  
 
Issue In order to ensure that the plant is maintained within the bounds of various analyses, instrument uncertainties and other uncertainties need to be accounted for in the TS limit, plant procedures  
 
or in the analyses. It is not clear that instr ument uncertainties and other potential uncertainties have been taken into consideration.
 
Request Please provide additional justification to provide a ssurance that instrument uncertainties and other potential uncertainties have been accounted for to assure that design basis assumptions  
 
will continue to be met.}}

Revision as of 20:58, 4 November 2019

Draft Request for Additional Information (TAC ME9085 and ME9086)
ML13070A344
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/08/2013
From: Richard Ennis
Plant Licensing Branch 1
To: Meena Khanna
Plant Licensing Branch 1
Ennis R
References
TAC ME9085, TAC ME9086
Download: ML13070A344 (4)


Text

March 8, 2013 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.

ME9085 AND ME9086)

The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.

The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.

Docket Nos. 50-277 and 50-278

Attachment:

Draft RAI

March 8, 2013 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.

ME9085 AND ME9086)

The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.

The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.

Docket Nos. 50-277 and 50-278

Attachment:

Draft RAI DISTRIBUTION PUBLIC ASallman, SCVB LPL1-2 R/F CRoque Cruz, SBPB RidsNrrDorlLpl1-2 Resource MHamm, STSB RidsNrrDorlDpr Resource SSun, SRXB RidsNrrPMPeachBottom Resource ACCESSION NO.: ML13070A344 OFFICE LPL1-2/PM NAME REnnis DATE 03/08/2013

OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISE NORMAL HEAT SINK OPERABILITY REQUIREMENTS PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated July 18, 2012, as supplemented on January 17, 2013 (Agencywide Documents Access and Management System (ADAMS)

Accession Nos. ML12200A388 and ML13018A225, respectively), Exelon Generation Company, LLC (Exelon, the licensee), submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.

The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal.

SBPB RAI-1

Background

TS 3.7.2, Emergency Service Water (ESW) System and Normal Heat Sink, Limiting Condition for Operation (LCO) Required Action B.1 currently requires that the licensee verify that the water temperature of the NHS is 90 °F, averaged over the previous 24-hour period, if the water temperature of the NHS is > 90 °F and 92 °F. The completion time for this action is once per hour. The TS Bases for TS 3.7.2 Required Action B.1 state, in part, that:

With water temperature of the normal heat sink > 90 °F and 92 °F, the design basis assumptions associated with the initial normal heat sink temperature are bounded provided the temperature of the normal heat sink when averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is 92 °F. To ensure that the 90 °F normal heat sink temperature limit is not exceeded, Required Action B.1 is provided to more frequently monitor the temperature of the normal heat sink. The Unit 2 normal heat sink temperature is measured from the Unit 2 intake canal. The once per hour completion time takes into consideration normal heat sink temperature variations and the increased monitoring frequency needed to ensure design basis assumptions and equipment limitations are not exceeded in this condition. [emphasis added]

Attachment

Surveillance Requirement (SR) 3.7.2.2 currently requires the licensee to verify that the average water temperature of the NHS is 90 °F. The SR frequency is in accordance with the Surveillance Frequency Control Program. In accordance with TS 5.5.14, Surveillance Frequency Control Program, the program shall ensure that SRs specified in the TSs are performed at intervals sufficient to assure the associated LCOs are met. PBAPS Surveillance Test procedure ST-0-098-01N-2, Daily Surveillance Log Mode 1, 2, 3 currently requires that the licensee verify and document the NHS temperature once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as long as NHS temperature is not above 90 °F.

Issue The proposed amendment would delete the LCO actions associated with verifying the NHS water temperature on an hourly basis when the temperature approaches the operability limit.

As currently proposed, assuming no changes to the Surveillance Frequency Control Program, the NHS water temperature would be verified only once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Due to temperature variations over this time period, this 24-hour surveillance frequency may not be sufficient to provide reasonable assurance that design basis assumptions will be met.

Request Please provide additional justification to provide assurance that the frequency of surveillance is sufficient to assure that design basis assumptions will continue to be met.

SBPB RAI-2

Background

The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F. The application dated July 18, 2012, states that [a]ll design basis analyses use 92 °F or greater as an input or determine that the maximum allowable NHS temperature is greater than or equal to 92 °F. The supplement dated January 17, 2013, states that the temperature elements used to measure the NHS water temperature have an accuracy of

+/- 0.28 °F.

Issue In order to ensure that the plant is maintained within the bounds of various analyses, instrument uncertainties and other uncertainties need to be accounted for in the TS limit, plant procedures or in the analyses. It is not clear that instrument uncertainties and other potential uncertainties have been taken into consideration.

Request Please provide additional justification to provide assurance that instrument uncertainties and other potential uncertainties have been accounted for to assure that design basis assumptions will continue to be met.