Letter Sequence Draft RAI |
---|
TAC:ME9085, Allowed Outage Time - Ultimate Heat Sink (Approved, Closed) TAC:ME9086, Allowed Outage Time - Ultimate Heat Sink (Approved, Closed) |
|
MONTHYEARML12200A3882012-07-18018 July 2012 Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature Project stage: Request ML1222203522012-08-0909 August 2012 Acceptance Review for TACs ME9085 and ME9086 - Peach Bottom Units 2 and 3 - Normal Heat Sink Operability Requirements Project stage: Acceptance Review ML12310A4882012-11-0505 November 2012 Draft Request for Additional Information Project stage: Draft RAI ML13018A2252013-01-17017 January 2013 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature Project stage: Response to RAI ML13070A3442013-03-0808 March 2013 Draft Request for Additional Information Project stage: Draft RAI ML14056A1152014-02-24024 February 2014 Draft Request for Additional Information Project stage: Draft RAI ML14099A5372014-04-0808 April 2014 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature Project stage: Response to RAI ML14119A3032014-04-28028 April 2014 Response to Request for Additional Information - Revision of Normal Heat Sink Technical Specification to Remove the 24-Hour Average Temperature Limit with No Change to the Peak Maximum Temperature Project stage: Response to RAI ML14136A4852014-06-0505 June 2014 Issuance of Amendments Revise Normal Heat Sink Operability Requirements Project stage: Approval 2013-03-08
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24185A1772024-07-0303 July 2024 Request for Additional Information IR 05000277/20244012023-10-0505 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2024401 and 05000278/2024401 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 IR 05000277/20224032022-01-21021 January 2022 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000277/2022403 and 05000278/2022403 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21035A2222021-02-0404 February 2021 Notification of Conduct of a Fire Protection Team Inspection ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML19303D1662019-10-31031 October 2019 Requests for Additional Information for the Environmental Review of the Peach Bottom Subsequent License Renewal Application - Set 2 (EPID No. L-2018-RNW-0013)- RAIs ML19232A1752019-08-20020 August 2019 Request for Additional Information - TSTF-500 Implementation LAR ML19140A2832019-05-15015 May 2019 Email - Peach Bottom Atomic Power Station, Units 2 and 3 Second Round RAI Request - Set 1 ML19140A2822019-05-15015 May 2019 027 Pb FU RAI Subsequent to Clarification Call - Cu Greater than 15 Zn Holston (Jg) ML19253D2932019-05-0707 May 2019 002 Attachment 4D Confirmation Water Chemistry Chereskin Revised (002) ML19249C7252019-05-0303 May 2019 SLRA Requests for Additional Information - Set 2 May 3, 2019 ML19108A4282019-04-10010 April 2019 RAIs SLRA Set 1_ERO(Rev 1) ML19079A0232019-03-19019 March 2019 Licensed Operator Positive Fitness-For-Duty Test ML19058A2902019-02-27027 February 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML19037A4832019-02-0606 February 2019 NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Peach Bottom Seismic Probabilistic Risk Assessment Report Dated August 28, 2018 ML19028A0062019-01-25025 January 2019 Secondary Containment LAR Requests for Additional Information ML19017A0472019-01-16016 January 2019 Request for Additional Information - High Pressure Service Water One Time TS Change ML18348B0292018-12-13013 December 2018 Subsequent License Renewal Severe Accident Mitigation Alternatives Requests for Additional Information ML19010A3832018-12-0707 December 2018 Additional Documents Needed for Peach Bottom SLR Environmental Review ML18324A6742018-11-15015 November 2018 Request for Additional Information (FINAL)- LAR to Allow 2SRV/SVs OOS at High Pressure ML18312A4072018-11-0808 November 2018 Request for Additional Information (Public) - LAR to Allow 2SRV/SVs OOS at High Pressure ML18276A0202018-10-0202 October 2018 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Amendment Request to Revise Emergency Plan for Limerick and Peach Bottom ML18240A1742018-08-28028 August 2018 Request for Additional Information (Final) - Adopt TSTF-500 Battery TS Changes LAR ML18239A1322018-08-27027 August 2018 Request for Additional Information Final - Relief Request I5R-04 ML18228A6762018-08-14014 August 2018 Request for Additional Information - Adopt TSTF-500 Battery TS Changes LAR ML18226A2012018-08-14014 August 2018 Request for Additional Information - Relief Request I5R-05 ML18214A2812018-08-0202 August 2018 Request for Additional Information Draft - Relief Request I5R-02 ML18200A2742018-07-17017 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18192A1192018-07-10010 July 2018 Request for Additional Information 2nd Round (Final) - Adopt 50.69 License Amendment ML18178A4772018-06-27027 June 2018 Request for Additional Information 2nd Round - Adopt 50.69 License Amendment ML18096B5062018-04-0606 April 2018 Request for Additional Information Exelon Generation Company, LLC Requested Amendment to Adopt 10 CFR 50.69 for Risk-informed Categorization and Treatment of Structures, Systems and Components ML18094B0832018-04-0505 April 2018 Enclosurequest for Additional Information (Letter to P. Duke RAI Regarding Entergy Operations, Inc.'S Decommissioning Funding Plan Update for Salem and Hope Creek, and Peach Bottom ISFSIs Docket Nos. 72-48 and 72-29) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17317B5502017-11-0909 November 2017 Licensed Operator Positive Fitness-For-Duty Test 2024-07-03
[Table view] |
Text
March 8, 2013 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
ME9085 AND ME9086)
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
Docket Nos. 50-277 and 50-278
Attachment:
Draft RAI
March 8, 2013 MEMORANDUM TO: Meena K. Khanna, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Richard B. Ennis, Senior Project Manager /ra/
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NOS.
ME9085 AND ME9086)
The attached draft request for additional information (RAI) was transmitted on March 8, 2013, to Mr. Thomas Loomis of Exelon Generation Company, LLC (Exelon, the licensee). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, dated July 18, 2012, as supplemented on January 17, 2013. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 °F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
The draft RAI was sent to Exelon to ensure that the questions are understandable, the regulatory basis for the questions is clear, and to determine if the information was previously docketed. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.
Docket Nos. 50-277 and 50-278
Attachment:
Draft RAI DISTRIBUTION PUBLIC ASallman, SCVB LPL1-2 R/F CRoque Cruz, SBPB RidsNrrDorlLpl1-2 Resource MHamm, STSB RidsNrrDorlDpr Resource SSun, SRXB RidsNrrPMPeachBottom Resource ACCESSION NO.: ML13070A344 OFFICE LPL1-2/PM NAME REnnis DATE 03/08/2013
OFFICIAL RECORD COPY DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT REVISE NORMAL HEAT SINK OPERABILITY REQUIREMENTS PEACH BOTTOM ATOMIC POWER STATION - UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278 By letter to the Nuclear Regulatory Commission (NRC) dated July 18, 2012, as supplemented on January 17, 2013 (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML12200A388 and ML13018A225, respectively), Exelon Generation Company, LLC (Exelon, the licensee), submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed amendment would revise the Technical Specifications (TSs) to change the operability requirements for the normal heat sink (NHS). The NHS for PBAPS is the Susquehanna River. Currently, the NHS is considered operable with a maximum water temperature of 90 °F. However, the PBAPS TSs currently allow plant operation to continue if the NHS water temperature exceeds the 90 °F limit, provided that: (1) the NHS water temperature, averaged over the previous 24-hour hour period, is verified at least once per hour to be less than or equal to 90 °F and; (2) the NHS water temperature does not exceed 92 F. The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F.
The NRC staff has reviewed the information the licensee provided that supports the proposed amendment and would like to discuss the following issues to clarify the submittal.
SBPB RAI-1
Background
TS 3.7.2, Emergency Service Water (ESW) System and Normal Heat Sink, Limiting Condition for Operation (LCO) Required Action B.1 currently requires that the licensee verify that the water temperature of the NHS is 90 °F, averaged over the previous 24-hour period, if the water temperature of the NHS is > 90 °F and 92 °F. The completion time for this action is once per hour. The TS Bases for TS 3.7.2 Required Action B.1 state, in part, that:
With water temperature of the normal heat sink > 90 °F and 92 °F, the design basis assumptions associated with the initial normal heat sink temperature are bounded provided the temperature of the normal heat sink when averaged over the previous 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period is 92 °F. To ensure that the 90 °F normal heat sink temperature limit is not exceeded, Required Action B.1 is provided to more frequently monitor the temperature of the normal heat sink. The Unit 2 normal heat sink temperature is measured from the Unit 2 intake canal. The once per hour completion time takes into consideration normal heat sink temperature variations and the increased monitoring frequency needed to ensure design basis assumptions and equipment limitations are not exceeded in this condition. [emphasis added]
Attachment
Surveillance Requirement (SR) 3.7.2.2 currently requires the licensee to verify that the average water temperature of the NHS is 90 °F. The SR frequency is in accordance with the Surveillance Frequency Control Program. In accordance with TS 5.5.14, Surveillance Frequency Control Program, the program shall ensure that SRs specified in the TSs are performed at intervals sufficient to assure the associated LCOs are met. PBAPS Surveillance Test procedure ST-0-098-01N-2, Daily Surveillance Log Mode 1, 2, 3 currently requires that the licensee verify and document the NHS temperature once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as long as NHS temperature is not above 90 °F.
Issue The proposed amendment would delete the LCO actions associated with verifying the NHS water temperature on an hourly basis when the temperature approaches the operability limit.
As currently proposed, assuming no changes to the Surveillance Frequency Control Program, the NHS water temperature would be verified only once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Due to temperature variations over this time period, this 24-hour surveillance frequency may not be sufficient to provide reasonable assurance that design basis assumptions will be met.
Request Please provide additional justification to provide assurance that the frequency of surveillance is sufficient to assure that design basis assumptions will continue to be met.
SBPB RAI-2
Background
The proposed amendment would change the NHS water temperature limit such that the NHS would be considerable operable as long as the maximum water temperature was less than or equal to 92 °F. The application dated July 18, 2012, states that [a]ll design basis analyses use 92 °F or greater as an input or determine that the maximum allowable NHS temperature is greater than or equal to 92 °F. The supplement dated January 17, 2013, states that the temperature elements used to measure the NHS water temperature have an accuracy of
+/- 0.28 °F.
Issue In order to ensure that the plant is maintained within the bounds of various analyses, instrument uncertainties and other uncertainties need to be accounted for in the TS limit, plant procedures or in the analyses. It is not clear that instrument uncertainties and other potential uncertainties have been taken into consideration.
Request Please provide additional justification to provide assurance that instrument uncertainties and other potential uncertainties have been accounted for to assure that design basis assumptions will continue to be met.