{{#Wiki_filter:The US NRC's  Power Reactor Decommissioning Process Bruce A. Watson, CHPDivision Waste Management and EnvironmentalProtection Environmental Protection Office of Federal and State Material Safety and Environmental Management ProgramsU.S. Nuclear Regulatory Commission NRC Regulations*10 CFR Part 20 Subpart E "License Termination Rule  was implemented in 1997*10 CFR Part 50 -Operating License*10 CFR Part 72  -Independent Spent Fuel Storage Installation License (ISFSI) 2 Reactor  Decommissioning Options*DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release*SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subse q uentl y decontaminated to levels that qypermits release
{{#Wiki_filter:The US NRCs Power Reactor Decommissioning Process Bruce A. Watson, CHP Division Waste Management and Environmental Protection Office of Federal and State Material Safety and Environmental Management Programs U.S. Nuclear Regulatory Commission
*ENTOMB:Plantisencasedinastructurallylong
-livedsubstanceto ENTOMB: Plant is encased in a structurally long lived substance to allow decay until levels permit unrestricted release (not currently


available) 3 US NRC Decommissioning 12 8 10 12 4 6 0 2199819992000200120022003200420052006200220032004200520062007200820092010201120122013Power ReactorsRTRsMaterials Sites 4
NRC Regulations
Power Reactor Decommissioning Decommissioning Process*Licenseenotifies(certifies)NRCwithin30daysofpermanently
* 10 CFR Part 20 Subpart E License Termination Rule was implemented in 1997
*Licensee notifies (certifies)
* 10 CFR Part 50 - Operating License
NRC within 30 days of permanently ceasing operationsCtifitilidthflhbtl
* 10 CFR Part 72 - Independent Spent Fuel Storage Installation License (ISFSI) 2
*C er tifi ca ti on a l so requ i re d once th e f ue l h as b een permanen tl y removed from the reactor vessel*Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5
 
Power Reactor Decommissioning Decommissioning Process*Licenseeperformssitedecommissioning Licensee performs site decommissioning*NRC continues to conduct on-site inspections*Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination*NRC notices LTP in the Federal Register*NRC holds a Public Meeting to discuss LTP 6
Reactor Decommissioning Options
License Termination PlanContents Plan Contents*Site characterization information*Identification of remaining dismantlement activities
* DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release
*Plansforsiteremediation Plans for site remediation*Detailed plans for the final radiation survey*Updated site-specific cost estimate*Supplemental environmental report, if any changes 7
* SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subsequently q    y decontaminated to levels that permits release
Power Reactor Decommissioning Decommissioning ProcessNRC review of the LTP*Acceptance review*Technical reviewAdditiliftiif
* ENTOMB: Plant is encased in a structurally long-lived long lived substance to allow decay until levels permit unrestricted release (not currently available) 3
*Additi ona l i n f orma ti on, if necessary*Public Meetings/Opportunity for Hearing 8
 
Power Reactor Decommissioning Decommissioning Process*NRC a pproves LTP b y amendin g the licenseppyg*Licensee performs remaining decommissioning activities*NRC performs in-process inspections
US NRC Decommissioning 12 10 8
*Decommissioningmustbecompletedwithin60years Decommissioning must be completed within 60 years 9 Power Reactor Decommissioning Decommissioning Process*LicenseesubmitsFinalStatusSurveyReport(FSSR)
6 4
Licensee submits Final Status Survey Report (FSSR)*NRC Reviews/approves FSSR*NRC performs confirmatory surveys, if needed
2 0
*NRCterminateslicense
1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Power Reactors                                                  2012 2013 RTRs Materials Sites 4
*NRC terminates license 10 Power Reactor CurrentStatus Current Status*10 licenses Terminated, 7 under the License Termination Rule*4 Units in active DECON (decommissioning) without an a pproved License Termination Plan pp*8 Units in SAFSTOR, principally at multi-unit operating sites 11 12 Power Reactors in SAFSTOR*Dresden 1*Fermi 1*GEVallecitios*Indian Point 1*Millstone 1
 
*PeachBottom1 GE Vallecitios*NS Savannah
Power Reactor Decommissioning Process
*Three Mile Island Unit 2*  
* Licensee notifies (certifies) NRC within 30 days of permanently ceasing operations
*Peach Bottom 1*San Onofre 1 13 Fermi 1 BackinSAFSTOR2013 Back in SAFSTOR 2013 14 San Onofre 1 -PartialSiteRelease "SAFSTOR"Partial Site Release SAFSTOR 15 Power Reactors Decommissioned2005
* Certification C   tifi ti also l required i d once the th ffuell h has b been permanently tl removed from the reactor vessel
-2010 Decommissioned 2005 2010*Trojan -2005*Maine Yankee -2005*Big Rock Point -2007*Pathfinder -2007
* Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5
*Yankee Rowe -2007
 
*ConnecticutYankee 2007*Connecticut Yankee -2007*Rancho Seco -2009 16 Maine Yankee -2005 17 Yankee Rowe -2007 18 Big Rock Point -2007 19 Thank You!Please visit our public website for additional information:
Power Reactor Decommissioning Process
http://www.nrc.gov/Click on "About NRC"Click on "How We Regulate"Click on "Decommissioning" in the text 20}}
* Licensee performs site decommissioning
* NRC continues to conduct on-site inspections
* Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination
* NRC notices LTP in the Federal Register
* NRC holds a Public Meeting to discuss LTP 6
 
License Termination Plan Contents
* Site characterization information
* Identification of remaining dismantlement activities
* Plans for site remediation
* Detailed plans for the final radiation survey
* Updated site-specific cost estimate
* Supplemental environmental report, if any changes 7
 
Power Reactor Decommissioning Process NRC review of the LTP
* Acceptance review
* Technical review
* Additi Additional l information, i f   ti   if necessary
* Public Meetings/Opportunity for Hearing 8
 
Power Reactor Decommissioning Process
* NRC approves pp      LTP by y amendingg the license
* Licensee performs remaining decommissioning activities
* NRC performs in-process inspections
* Decommissioning must be completed within 60 years 9
 
Power Reactor Decommissioning Process
* Licensee submits Final Status Survey Report (FSSR)
* NRC Reviews/approves FSSR
* NRC performs confirmatory surveys, if needed
* NRC terminates license 10
 
Power Reactor Current Status
* 10 licenses Terminated, 7 under the License Termination Rule
* 4 Units in active DECON (decommissioning) without an approved pp        License Termination Plan
* 8 Units in SAFSTOR, principally at multi-unit operating sites 11
 
12 Power Reactors in SAFSTOR
* Dresden 1
* Fermi 1
* GE Vallecitios
* Indian Point 1
* NS Savannah
* Millstone 1
* Three Mile Island Unit 2*
* Peach Bottom 1
* San Onofre 1 13
 
Fermi 1 Back in SAFSTOR 2013 14
 
San Onofre 1 -
Partial Site Release SAFSTOR SAFSTOR 15
 
Power Reactors Decommissioned 2005-2010 2005 2010
* Trojan - 2005
* Maine Yankee - 2005
* Big Rock Point - 2007
* Pathfinder - 2007
* Yankee Rowe - 2007
* Connecticut Yankee - 2007
* Rancho Seco - 2009 16
 
Maine Yankee - 2005 17
 
Yankee Rowe - 2007 18
 
Big Rock Point - 2007 19
 
Thank You!
Please visit our public website for additional information:
http://www.nrc.gov/
Click on About NRC Click on How We Regulate Click on Decommissioning in the text 20}}

Latest revision as of 17:09, 4 November 2019

F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg
ML13191B263
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/24/2013
From: Bruce Watson
NRC/FSME/DWMEP/DURLD/RDB
To:
Feintuch K
Shared Package
ML13168A570 List:
References
TAC MF1045
Download: ML13191B263 (20)


Text

The US NRCs Power Reactor Decommissioning Process Bruce A. Watson, CHP Division Waste Management and Environmental Protection Office of Federal and State Material Safety and Environmental Management Programs U.S. Nuclear Regulatory Commission

NRC Regulations

  • 10 CFR Part 20 Subpart E License Termination Rule was implemented in 1997

Reactor Decommissioning Options

  • DECON: Equipment, structures, etc. removed or decontaminated to a level that permits release
  • SAFSTOR: Plant placed in a safe, stable condition and maintained in that state until it is subsequently q y decontaminated to levels that permits release
  • ENTOMB: Plant is encased in a structurally long-lived long lived substance to allow decay until levels permit unrestricted release (not currently available) 3

US NRC Decommissioning 12 10 8

6 4

2 0

1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Power Reactors 2012 2013 RTRs Materials Sites 4

Power Reactor Decommissioning Process

  • Licensee notifies (certifies) NRC within 30 days of permanently ceasing operations
  • Certification C tifi ti also l required i d once the th ffuell h has b been permanently tl removed from the reactor vessel
  • Licensee submits Post Shutdown Decommissioning Activities Report (PSDAR) prior to or within 2 years of cessation of operations 5

Power Reactor Decommissioning Process

  • Licensee performs site decommissioning
  • NRC continues to conduct on-site inspections
  • Licensee submits License Termination Plan (LTP) at least 2 years prior to requesting license termination
  • NRC notices LTP in the Federal Register
  • NRC holds a Public Meeting to discuss LTP 6

License Termination Plan Contents

  • Site characterization information
  • Identification of remaining dismantlement activities
  • Plans for site remediation
  • Detailed plans for the final radiation survey
  • Updated site-specific cost estimate
  • Supplemental environmental report, if any changes 7

Power Reactor Decommissioning Process NRC review of the LTP

  • Technical review
  • Additi Additional l information, i f ti if necessary
  • Public Meetings/Opportunity for Hearing 8

Power Reactor Decommissioning Process

  • NRC approves pp LTP by y amendingg the license
  • Licensee performs remaining decommissioning activities
  • NRC performs in-process inspections
  • Decommissioning must be completed within 60 years 9

Power Reactor Decommissioning Process

  • Licensee submits Final Status Survey Report (FSSR)
  • NRC Reviews/approves FSSR
  • NRC performs confirmatory surveys, if needed
  • NRC terminates license 10

Power Reactor Current Status

  • 10 licenses Terminated, 7 under the License Termination Rule
  • 4 Units in active DECON (decommissioning) without an approved pp License Termination Plan
  • 8 Units in SAFSTOR, principally at multi-unit operating sites 11

12 Power Reactors in SAFSTOR

  • Dresden 1
  • Fermi 1
  • GE Vallecitios
  • Indian Point 1
  • NS Savannah
  • Millstone 1
  • Three Mile Island Unit 2*
  • Peach Bottom 1
  • San Onofre 1 13

Fermi 1 Back in SAFSTOR 2013 14

San Onofre 1 -

Partial Site Release SAFSTOR SAFSTOR 15

Power Reactors Decommissioned 2005-2010 2005 2010

  • Trojan - 2005
  • Big Rock Point - 2007
  • Pathfinder - 2007
  • Yankee Rowe - 2007
  • Rancho Seco - 2009 16

Maine Yankee - 2005 17

Yankee Rowe - 2007 18

Big Rock Point - 2007 19

Thank You!

Please visit our public website for additional information:

http://www.nrc.gov/

Click on About NRC Click on How We Regulate Click on Decommissioning in the text 20