|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2014 MEETING | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2014 MEETING |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
|
| |
|
| LICENSEE: NextEra Energy, Seabrook, LLC | | LICENSEE: NextEra Energy, Seabrook, LLC FACILITY: Seabrook Station, Unit 1 |
| | |
| FACILITY: Seabrook Station, Unit 1 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Summary of Annual Assessment Meeting regarding Seabrook Station | | Summary of Annual Assessment Meeting regarding Seabrook Station On June 24, 2014, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at Best Western Inn and Conference Center in Hampton, NH. The NRC conducted the open house to discuss its assessment of the safety performance at Seabrook Station. The open house was followed by a public meeting from 6:30 - 8:30 pm. |
| | | A notice of the open house and public meeting was issued on June 5, 2014, and was posted on the NRCs external (public) web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. |
| On June 24, 2014, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at Best Western Inn and Conference Center in Hampton, NH. The NRC conducted the open house to discuss its assessment of the safety performance at Seabrook Station. The open house was followed by a public meeting from 6:30 - 8:30 pm. | | ML14156A255. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. |
| | | The NRC presented poster boards and was available to discuss its assessment of the safety performance of Seabrook for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014, ADAMS Accession No. ML14062A021. |
| A notice of the open house and public meeting was issued on June 5, 2014, and was posted on the NRC's external (public) web page. | | The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html. |
| The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14156A255. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC presented poster boards and was available to discuss its assessment of the safety performance of Seabrook for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014, ADAMS Accession No. ML14062A021. | | Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC. |
| The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRC's Annual | | Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel. |
| | | /RA/ |
| Assessment Process and the safety performance of Seabrook can be found on the NRC's website at: www.nrc.gov/nrr/oversight/assess/index.html. Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC. | | Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects |
| Statements and question were received regarding Seabrook's performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel. | |
| | |
| /RA/ Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects
| |
| | |
| ML14062A021. The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Seabrook can be found on the NRC's website at: www.nrc.gov/nrr/oversight/assess/index.html. Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC. Statements and question were received regarding Seabrook's performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.
| |
| | |
| /RA/ Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution
| |
| : G. Dentel, DRP P. Cataldo, DRP, SRI R. Barkley, DRP C. Newport, DRP, RI M. Draxton, DRP A. Cass, DRP, AA
| |
|
| |
|
| DOC NAME: G:\DRP\BRANCH3\COMMUNICATIONS\PUBLIC MEETINGS\2014 ANNUAL ASSESSMENT MEETING\ SB\MEETING | | ML14062A021. The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html. |
| | Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC. |
| | Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel. |
| | /RA/ |
| | Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution: |
| | G. Dentel, DRP P. Cataldo, DRP, SRI R. Barkley, DRP C. Newport, DRP, RI M. Draxton, DRP A. Cass, DRP, AA DOC NAME: G:\DRP\BRANCH3\COMMUNICATIONS\PUBLIC MEETINGS\2014 ANNUAL ASSESSMENT MEETING\ |
| | SB\MEETING |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
Line 48: |
Line 44: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| 2014.DOCX ADAMS Accession No.: ML14190B013 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RSB/ RSB GTD/ GTD DATE 07/ 09 /14 07/09/14}} | | 2014.DOCX ADAMS Accession No.: ML14190B013 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RSB/ RSB GTD/ GTD DATE 07/ 09 /14 07/09/14}} |
|
---|
Category:Meeting Summary
MONTHYEARML24177A1482024-06-25025 June 2024 5/29/2024 Summary of Public Meeting to Discuss NRCs Annual Assessment of the Safety Performance at Seabrook Station ML24128A1412024-05-30030 May 2024 Summary of April 30, 2024, Pre-Application Teleconference with Nextera Energy Seabrook, LLC, to Discuss License Amendment Request Related to Offsite AC Source ML24127A2272024-05-30030 May 2024 Summary of April 30, 2024, Pre-Application Teleconference with Nextera Energy Seabrook, LLC, to Discuss License Amendment Request (LAR) Related to Seabrooks Planned Fall 2024 Outage ML24247A1122023-08-26026 August 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Quarterly Inspection Reports for CY2023 ML23187A4432023-07-11011 July 2023 6/27/2023, Annual Assessment Meeting for Seabrook Station - Meeting Summary ML23086B9962023-04-0404 April 2023 Summary of March 7, 2023, Meeting with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Revise Emergency Action Level Due to Modification to Containment Fire Detection Equipment ML23088A1522023-03-29029 March 2023 Summary of Meeting Between Nrc/Region I and C-10 - Questions Regarding Seabrook 4Q2022 Inspection Report ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22146A3422022-06-13013 June 2022 February 23, Summary of Meetings with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability ML22153A1672022-06-0202 June 2022 Annual Assessment Meeting for Seabrook Station - Meeting Summary ML21336A4072021-12-0707 December 2021 Summary of Conference Call Regarding the Fall 2021 Steam Generator Tube Inspections ML21168A1522021-06-22022 June 2021 Annual Assessment Meeting Summary ML20174A2682020-06-22022 June 2020 June 3, 2020, Seabrook Annual Assessment Summary ML19073A0172019-03-21021 March 2019 Summary of Meeting with Nextera Energy Seabrook, LLC, on Proposed Relief Requests for the Containment Spray System for the Seabrook Station, Unit No. 1 ML19046A3832019-02-26026 February 2019 Meeting Summary of February 13, 2019, Public Meeting in Hampton, New Hampshire Alkali-Silica Reaction License Amendment Request and License Renewal Application ML18135A2462018-05-31031 May 2018 Summary of April 24, 2018, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of License Amendment Request to Adopt Standard Technical Specification 3.0.6 ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML18142A2932018-05-21021 May 2018 2018 Annual Assessment Meeting Summary ML17340A1862017-12-14014 December 2017 Summary of November 17, 2017, Meeting with NextEra Energy Regarding License Amendment Request on Alkali Silica Reaction - Requests for Additional Information (CAC No. MF8260; EPID L-2016-LLA-0007) ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML17278A7482017-10-13013 October 2017 Summary of August 24, 2017, Meeting with NextEra Energy Regarding License Amendment Request on Alkali Silica Reaction (CAC No. MF8260; EPID L-2016-LLA-0007) ML17216A1732017-09-0707 September 2017 Notice of Meeting with Florida Power & Light Company and NextEra Energy to Discuss Closing Out Generic Safety Issue-191 and Generic Letter 2004-02 ML17172A1322017-06-20020 June 2017 Summary of Annual Assessment Meeting for Seabrook Station, Unit 1, Held on 6/7/2017 ML17137A0292017-06-0505 June 2017 Summary of Meeting Held on May 9, 2017, Between the USNRC Staff and NextEra Representatives to Discuss the Seabrook License Renewal Application (CAC No. ME4028) ML16341B9022017-03-0707 March 2017 03/07/2016 Summary of Telecon Held on Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Request for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16342C4672017-03-0101 March 2017 12/01/2016 Summary of Teleconference Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook Concerning Requests for Additional Information Pertaining to the Seabrook Station License Renewal Application ML16204A2612016-07-29029 July 2016 June 15, 2016 Summary of Pre-Submittal Meeting with NextEra Energy Regarding Proposed License Amendment on Alkali Silica Reaction for the Seabrook Station, Unit No. 1 ML16190A1812016-07-0808 July 2016 Summary of Public Annual Assessment Meeting ML16168A4122016-06-15015 June 2016 Slides for Public Meeting with NextEra Energy Regarding Seabrook Station ASR License Amendment ML16146A1762016-06-0808 June 2016 April 28, 2016, Summary of Public Meeting with NextEra Energy Seabrook, LLC Regarding Aging Management of Alkali-Silica Reaction Pertaining to the License Renewal of Seabrook Station, Unit 1 ML15343A1862016-01-0707 January 2016 License Renewal Call Summary - December 3, 2015 ML15357A3262015-12-23023 December 2015 Memo-Seabrook Conference Call on Dec. 22, 2015-with NextEra Concerning a Request for Additional Information Pertaining to Seabrook Station Operability Determinations for the Alkali-Silica Reaction (ASR)-affected Containment Enclosure Buildi ML15328A1392015-12-0404 December 2015 November 23, 2015, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Nextera Energy Seabrook, LLC, Concerning Requests for Additional Information Pertaining to the Seabrook Station ML15190A0872015-07-0707 July 2015 June 18, 2015, Summary of Meeting - Seabrook Annual Assessment ML14190B0132014-07-0909 July 2014 June 24, 2014, Summary of Annual Assessment Meeting Regarding Seabrook Station ML14035A2362014-01-30030 January 2014 Seabrook, Unit 1 - Summary of Meeting Between the U.S. Nuclear Regulatory Commission and NextEra Regarding the Status of Alkali-Silica Reaction Testing Program ML13352A5112013-12-27027 December 2013 13-12-18 Seabrook Conference Call Re SAMA RAI ML13133A2412013-06-12012 June 2013 5/9/2013 - Summary of Meeting with NextEra Energy Seabrook, LLC on Pre-Submittal of a Fixed Incore Detector License Amendment Request ML13158A1972013-06-0707 June 2013 5/30/2013 Summary of Teleconference Between NRC Staff and NextEra Energy Staff Regarding Decommissioning Funding Status Report for Seabrook ML13099A2582013-04-0909 April 2013 3/27/2013: Seabrook - Summary of Annual Assessment Meeting with NextEra Energy ML13066A4882013-03-21021 March 2013 Summary of Meeting Held on February 21, 2013, Between the NRC and NextEra Energy Seabrook, LLS Regarding License Renewal Application, Seabrook Station ML13004A1782013-01-0404 January 2013 December 11, 2012 Summary of Meeting Regarding Status of Degraded Concrete on Seabrook Station, Unit 1, ML12278A2502012-11-0101 November 2012 Summary of Telephone Conference Call Held Between NRC and NextEra Seabrook, Concerning the RAIs Pertaining to the Seabrook Station, LRA ML12264A6482012-10-16016 October 2012 8/31/2012, Telecon Summary Between NRC and NextEra Seabrook ML12242A5612012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 28, 2012, Between NRC and NextEra Sebrook, LLC, Concerning the Drai Pertaining to the Seabrook, LRA ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 ML12195A1112012-07-31031 July 2012 Summary of Telephone Conference Call Held on July 3, 2012, Between the NRC and NextEra Energy Seabrook, LLC, Concerning the Draft Request for Additional Information Pertaining to the Seabrook Station, LRA Er ML12165A5952012-06-22022 June 2012 Summary of Telephone Conference Call Held on May 16, 2012, Between the U.S. Nuclear Regulatory Commission and NextEra Energy Seabrook, LLC, Concerning the Response to Request for Additional Information Pertaining to the Seabrook Station LRA ML12164A9012012-06-22022 June 2012 Summary of Telephone Conference Call Held on 5/24/12, Between the NRC and NextEra Energy Seabrook, LLC Concerning the Drai Pertaining to the Seabrook Station LRA ML12164A7562012-06-22022 June 2012 Summary of Telephone Conference Call Between NRC and NextEra Seabrook 2024-06-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2014 MEETING
SUMMARY
LICENSEE: NextEra Energy, Seabrook, LLC FACILITY: Seabrook Station, Unit 1
SUBJECT:
Summary of Annual Assessment Meeting regarding Seabrook Station On June 24, 2014, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted an open house at Best Western Inn and Conference Center in Hampton, NH. The NRC conducted the open house to discuss its assessment of the safety performance at Seabrook Station. The open house was followed by a public meeting from 6:30 - 8:30 pm.
A notice of the open house and public meeting was issued on June 5, 2014, and was posted on the NRCs external (public) web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No.
ML14156A255. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Seabrook for the period of January 1 through December 31, 2013, as documented in our letter dated March 4, 2014, ADAMS Accession No. ML14062A021.
The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.
Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.
/RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects
ML14062A021. The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and the License Renewal Process. Additional information relative to the NRCs Annual Assessment Process and the safety performance of Seabrook can be found on the NRCs website at: www.nrc.gov/nrr/oversight/assess/index.html.
Members of the media and public, along with State and local officials, attended the open-house and the subsequent public meeting, and were offered the opportunity to question the NRC.
Statements and question were received regarding Seabrooks performance as well as issues related to the Alkali Silica Reaction (ASR) found in reinforced concrete structures at Seabrook, and the long-term storage of spent nuclear fuel.
/RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Distribution:
G. Dentel, DRP P. Cataldo, DRP, SRI R. Barkley, DRP C. Newport, DRP, RI M. Draxton, DRP A. Cass, DRP, AA DOC NAME: G:\DRP\BRANCH3\COMMUNICATIONS\PUBLIC MEETINGS\2014 ANNUAL ASSESSMENT MEETING\
SB\MEETING
SUMMARY
\SEABROOK MEETING
SUMMARY
2014.DOCX ADAMS Accession No.: ML14190B013 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME RSB/ RSB GTD/ GTD DATE 07/ 09 /14 07/09/14