| | number = ML15106A928 | | | number = ML15106A928 |
| | issue date = 04/24/2015 | | | issue date = 04/24/2015 |
| | title = Clinton Power Station, Unit 1 - Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment (TAC No. MF5291) | | | title = Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment |
| | author name = Purnell B A | | | author name = Purnell B |
| | author affiliation = NRC/NRR/DORL/LPLIII-2 | | | author affiliation = NRC/NRR/DORL/LPLIII-2 |
| | addressee name = Hanson B C | | | addressee name = Hanson B |
| | addressee affiliation = Exelon Generation Co, LLC | | | addressee affiliation = Exelon Generation Co, LLC |
| | docket = 05000461 | | | docket = 05000461 |
Line 13: |
Line 13: |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 4 | | | page count = 4 |
| | | project = TAC:MF5291 |
| | | stage = RAI |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 lpril 2L~, 2015 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 |
| | |
| | ==SUBJECT:== |
| | CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" (TAC NO. MF5291) |
| | |
| | ==Dear Mr. Hanson:== |
| | |
| | By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that additional information is needed to complete its review. |
| | A response to the enclosed request should be provided by June 19, 2015. This request was discussed with Mr. Tim Byam of your staff on April 22, 2015. |
| | |
| | B. Hanson Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov. |
| | Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461 |
| | |
| | ==Enclosure:== |
| | |
| | Request for Additional Information cc w/encl: Listserv |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that the additional information below is needed to complete its review. |
| | RAl-1 Provide the integrated leak test data for each system under TS 5.5.2 for the last two outages, including the test acceptance criterion, test pressure, as-found and as-left test leakage rate, and failed components. |
| | RAl-2 Provide justification why the proposed "Refueling Only Outage" will not significantly impact the leakage pathways and associated leakage rates for each system under TS 5.5.2. |
| | Enclosure |
| | |
| | ML15106A928 *via memo OFFICE LPL3-2/PM LPL3-2/LA SCVB/BC* LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer RDennig TTate BPurnell DATE 4/23/15 4/20/15 3/30/15 4/24/15 4/24/15}} |
Letter Sequence RAI |
---|
TAC:MF5291, Administrative Controls Program 5.5.2.B Test Interval and Exception (Approved, Closed) |
|
MONTHYEARRS-14-308, License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2014-11-17017 November 2014 License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. Project stage: Request ML15015A6702015-01-14014 January 2015 NRR E-mail Capture - Clinton Power Station, Unit 1 - Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside of Containment Project stage: Other ML15062A6482015-03-24024 March 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment Project stage: RAI RS-15-121, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-04-21021 April 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. Project stage: Response to RAI ML15106A9282015-04-24024 April 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment Project stage: RAI RS-15-141, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-06-24024 June 2015 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. Project stage: Response to RAI RS-15-298, Supplement to License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment.2015-11-16016 November 2015 Supplement to License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment. Project stage: Supplement ML15251A5842015-12-18018 December 2015 Issuance of Amendment Concerning Revision to Integrated Leak Test Intervals (TAC No. MF5291)(RS-14-308) Project stage: Approval 2015-12-18
[Table View] |
|
---|
Category:Letter
MONTHYEARML24285A1422024-10-24024 October 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1442024-10-24024 October 2024 Ltr. to Estavio Elizondo, Sr., Chairman, Kickapoo Traditional Tribe of Texas Re CPS Section 106 Consultation ML24285A1482024-10-24024 October 2024 Ltr. to Joseph Rupnick, Chairman, Prairie Band Potawatomi Nation Re CPS Section 106 Consultation ML24285A1462024-10-24024 October 2024 Ltr. to Gena Kakkak, Chairwoman, Menominee Indian Tribe of Wisconsin Re CPS Section 106 Consultation ML24285A1472024-10-24024 October 2024 Ltr. to Geoffrey M. Standing Bear, Principal Chief, Osage Nation Re CPS Section 106 Consultation ML24285A1452024-10-24024 October 2024 Ltr. to Gail Cheatham, Kickapoo Tribe of Indians of the Kickapoo Reservation in Ks Re CPS Sect 106 Consult ML24285A1412024-10-21021 October 2024 Ltr. to Craig Harper, Chief, Peoria Tribe of Oklahoma Re CPS Section 106 Consultation ML24285A1432024-10-21021 October 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma Re CPS Section 106 Consultation RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing 05000461/LER-2023-002-01, Reactor Core Isolation Cooling Inoperable Prior to Mode Change2024-09-24024 September 2024 Reactor Core Isolation Cooling Inoperable Prior to Mode Change ML24211A2302024-09-11011 September 2024 – Request for Partial Site Release for Facility Operating License No. NPF-62 IR 05000461/20240112024-09-0909 September 2024 Commercial Grade Dedication Inspection Report 05000461/2024011 RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station IR 05000461/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Clinton Power Station (Report 05000461/2024005) ML24222A3952024-08-23023 August 2024 Regulatory Audit Report to Support the Review of the Amendments to Revise Reactor Water Cleanup Valve Isolation Timing ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000461/20240022024-08-0909 August 2024 Integrated Inspection Report 05000461/2024002 ML24220A2772024-08-0707 August 2024 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000461/2025010 ML24212A2212024-08-0202 August 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-LNE-0000) (Docket Number: 50-461) ML24157A3242024-07-11011 July 2024 Issuance of Amendment No. 254 Revision of Reactor Water Cleanup Isolation Valve Timing ML24158A0772024-07-0303 July 2024 Notice of Consideration of Approval of Partial Site Release, Public Meeting, and Request for Comments (EPID L-2023-LLA-0088) - Letter ML24163A3252024-06-28028 June 2024 Aging Management Regulatory Audit Plan ML24163A3242024-06-28028 June 2024 LRA - Portal Letter ML24179A3112024-06-27027 June 2024 05000461; Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24176A0272024-06-25025 June 2024 Confirmation of Initial License Examination, July 2025 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes IR 05000461/20240122024-05-20020 May 2024 Biennial Problem Identification and Resolution Inspection Report Report 05000461/2024012 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation IR 05000461/20240012024-05-0707 May 2024 Integrated Inspection Report 05000461/2024001 ML24103A1032024-05-0101 May 2024 SHPO Consultation Letter for Clinton License Renewal RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24120A3432024-04-30030 April 2024 Ltr. to Darwin Kaskaske, Chairman, Kickapoo Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24120A3452024-04-30030 April 2024 Ltr. to Lester Randell, Chairman, Kickapoo Tribe of Indians of the Kickapoo Reservation in Kansas; Re., CPS Section 106 Consultation ML24103A0992024-04-30030 April 2024 Achp Scoping Letter for Clinton License Renewal ML24120A3442024-04-30030 April 2024 Ltr. to Gena Kakkak, Chairman, Menominee Indian Tribe of Wisconsin; Re., CPS Section 106 Consultation ML24103A1152024-04-30030 April 2024 Ltr. to Geoffrey Standing Bear, Principal Chief, the Osage Nation; Re., CPS Section 106 Consultation ML24120A3462024-04-30030 April 2024 Ltr. to Douglas Lankford, Chief, Miami Tribe of Oklahoma; Re., CPS Section 106 Consultation ML24107B0312024-04-29029 April 2024 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24089A2222024-04-11011 April 2024 LRA - Acceptance and Opportunity for Hearing - Letter ML24092A3452024-04-0101 April 2024 Updated Safety Analysis Report (Usar), Revision 23 ML24092A3552024-04-0101 April 2024 Request for Information for NRC License Renewal Inspection: Inspection Report 05000461/2024010 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24045A1422024-02-29029 February 2024 License Renewal Application Receipt and Availability - Letter IR 05000461/20230062024-02-28028 February 2024 Annual Assessment Letter for Clinton Power Station (Report 05000461/2023006) 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24222A4092024-05-0303 May 2024 NRR E-mail Capture - Request for Additional Information Regarding Reactor Water Cleanup (RWCU) Pump Rooms - L-2023-LLA-0118 ML24064A1222024-02-0606 February 2024 Biennial Problem and Identification Inspection Request for Information ML23363A0302023-12-29029 December 2023 NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23230B1682023-08-18018 August 2023 NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications ML23202A0992023-07-24024 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22312A5362022-11-0808 November 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000461/2023401 ML22255A1402022-09-12012 September 2022 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Clinton Power Station ML22173A0382022-06-21021 June 2022 NRR E-mail Capture - Request for Additional Information (RAI) Regarding Clinton License Amendment Request for Secondary Containment Design Basis (L-2022-LLA-0055) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21225A0392021-08-13013 August 2021 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Request to Revise Degraded Voltage Instrumentation Setpoints ML21204A0152021-07-23023 July 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000461/2021004 ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21071A1882021-03-12012 March 2021 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Clinton Power Station ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21057A1012021-02-26026 February 2021 NRR E-mail Capture - Clarification of Second Round RAI - Clinton TSTF-505 License Amendment Request ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21057A1002021-02-17017 February 2021 NRR E-mail Capture - Second Round RAI - Clinton TSTF-505 License Amendment Request ML21026A0582021-01-25025 January 2021 Notification of NRC Supplemental Inspection (95001) and Request for Information ML20315A0642020-11-0909 November 2020 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information: Inspection Report 05000461/2021010 ML20307A6592020-10-27027 October 2020 NRR E-mail Capture - Request for Additional Information Regarding TSTF-505 and 50.69 Applications ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20128J8642020-05-0707 May 2020 NRR E-mail Capture - Preliminary RAIs for Clinton Load Tap Changer License Amendment Request ML20105A1082020-04-14014 April 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-01 ML20091F7892020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information Regarding Clinton Relief Request I4R-05 ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18225A2882018-08-13013 August 2018 Ltr. 08/13/18 Clinton Power Station - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000461/2018011 (DRS-B.Jose) ML18214A4452018-08-0202 August 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18193A9732018-07-12012 July 2018 NRR E-mail Capture - Preliminary Request for Additional Information Regarding Clinton Revised Alternate Source Term ML18088A5662018-03-28028 March 2018 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection 05000461/2018010 ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17276B7632017-10-0303 October 2017 NRR E-mail Capture - Clinton Power Station - Request for Additional Information Regarding License Amendment Request Related to Reactor Pressure Vessel Water Inventory Control ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17125A3212017-05-0202 May 2017 NRR E-mail Capture - Clinton Power Station, Unit 1 - Request for Additional Information Regarding the Permanent Extension of Leak Rate Testing ML16356A0422016-12-20020 December 2016 Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000461/2017008 (Dxs) ML16130A6642016-05-11011 May 2016 Request for Additional Information Related to Incorporation of Revised Alternative Source Term (CAC No. MF7336)(RS-16-019) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15106A9282015-04-24024 April 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, :Primary Coolant Sources Outside Containment ML15068A4212015-04-16016 April 2015 Request for Additional Information Regarding Relief Request 13R-11 ML15062A6482015-03-24024 March 2015 Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.2, Primary Coolant Sources Outside Containment 2024-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 lpril 2L~, 2015 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" (TAC NO. MF5291)
Dear Mr. Hanson:
By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that additional information is needed to complete its review.
A response to the enclosed request should be provided by June 19, 2015. This request was discussed with Mr. Tim Byam of your staff on April 22, 2015.
B. Hanson Should you have any questions, please contact me at 301-415-1380 or by email at blake.purnell@nrc.gov.
Sincerely, Blake Purnell, Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-461
Enclosure:
Request for Additional Information cc w/encl: Listserv
REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 5.5.2, "PRIMARY COOLANT SOURCES OUTSIDE CONTAINMENT" CLINTON POWER STATION, UNIT 1 DOCKET NO. 50-461 By application dated November 17, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14321A882), Exelon Generation Company, LLC (the licensee) submitted a request to revise Technical Specification (TS) 5.5.2, "Primary Coolant Sources Outside Containment," for Clinton Power Station (CPS), Unit 1. The reason for the request is to support the CPS transition from 2-year to 1-year refueling cycles. Currently, TS 5.5.2 requires that an integrated leak test be performed on each system subject to TS 5.5.2 at refueling cycle intervals or less. The proposed change would require this test to be performed at least once per 24 months. The U.S. Nuclear Regulatory Commission staff is reviewing the application and has determined that the additional information below is needed to complete its review.
RAl-1 Provide the integrated leak test data for each system under TS 5.5.2 for the last two outages, including the test acceptance criterion, test pressure, as-found and as-left test leakage rate, and failed components.
RAl-2 Provide justification why the proposed "Refueling Only Outage" will not significantly impact the leakage pathways and associated leakage rates for each system under TS 5.5.2.
Enclosure
ML15106A928 *via memo OFFICE LPL3-2/PM LPL3-2/LA SCVB/BC* LPL3-2/BC LPL3-2/PM NAME BPurnell SRohrer RDennig TTate BPurnell DATE 4/23/15 4/20/15 3/30/15 4/24/15 4/24/15