{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016   Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop ADB3080 Oak Harbor, OH 434499760
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL  
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Boles:==
==Dear Mr. Boles:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station. The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834. Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
 
B. Boles     In accordance with Title 10 of the Code of Federal Regulations (10 of Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager B. Boles     In accordance with Title 10 of the Code of Federal Regulations of this letter will be available electronically for public inspection in the Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz   ADAMS Accession Number ML16155A046 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N RIII NAME JKweiser:jw MBielby ROrlikowski DATE 06/01/16 06/01/16 06/02/16 OFFICIAL RECORD COPY UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016   Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop ADB3080 Oak Harbor, OH 434499760
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
 
B. Boles                                         In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                  /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager
 
B. Boles                                                                   In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                          /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number ML16155A046 Publicly Available                           Non-Publicly Available                   Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII:DRS                       C RIII:DRS                     N RIII:DRS                         N RIII NAME               JKweiser:jw                         MBielby                       ROrlikowski DATE               06/01/16                             06/01/16                       06/02/16 OFFICIAL RECORD COPY
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.
Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL  
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Boles:==
==Dear Mr. Boles:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station. The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834. Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
 
B. Boles     In accordance with Title 10 of the Code of Federal Regulations (10 of Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager B. Boles     In accordance with Title 10 of the Code of Federal Regulations of this letter will be available electronically for public inspection in the Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/   Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz   ADAMS Accession Number ML16155A046 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N RIII NAME JKweiser:jw MBielby ROrlikowski DATE 06/01/16 06/01/16 06/02/16 OFFICIAL RECORD COPY}}
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
 
B. Boles                                         In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                  /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager
 
B. Boles                                                                   In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                          /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number ML16155A046 Publicly Available                           Non-Publicly Available                   Sensitive                 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE             RIII:DRS                       C RIII:DRS                     N RIII:DRS                         N RIII NAME               JKweiser:jw                         MBielby                       ROrlikowski DATE               06/01/16                             06/01/16                       06/02/16 OFFICIAL RECORD COPY}}

Latest revision as of 18:19, 30 October 2019

Ltr. 06/02/16 Davis-Besse Operator Licensing Examination Approval (Meb)
ML16155A046
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/02/2016
From: Robert Orlikowski
Operations Branch III
To: Boles B
FirstEnergy Nuclear Operating Co
References
Download: ML16155A046 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Boles:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.

Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

B. Boles In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager

B. Boles In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number ML16155A046 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N RIII NAME JKweiser:jw MBielby ROrlikowski DATE 06/01/16 06/01/16 06/02/16 OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 June 2, 2016 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Boles:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Davis-Besse Nuclear Power Station.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Jeff Cuff, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, on June 20, 2016. The NRC staff will administer the operating tests during the week of June 13, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of the licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.

Please contact your Chief Examiner, Mr. Michael Bielby, at 630-829-9762, if you have any questions or identify any errors or changes in the license level reactor operator, senior reactor operator or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

B. Boles In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager

B. Boles In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 cc: Distribution via LISTSERV Jeff Cuff, Training Manager DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz ADAMS Accession Number ML16155A046 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N RIII NAME JKweiser:jw MBielby ROrlikowski DATE 06/01/16 06/01/16 06/02/16 OFFICIAL RECORD COPY