| issue date = 07/05/2016
| issue date = 07/05/2016
| title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
| title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Smith K
| addressee name = Smith K
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
 
Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000  


==SUBJECT:==
==SUBJECT:==
SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS
SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS


==Dear Mr. Smith:==
==Dear Mr. Smith:==


On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A "PASS" in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a "FAIL" indicates that the individual failed the examination.  
On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this examination, please contact me at (404) 997-4662.
Sincerely,
                                                /RA by Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. If you have any questions concerning this exami nation, please contact me at (404) 997-4662.
==Enclosures:==
Sincerely,
(See Page 2)
      /RA by Gerald J. McCoy for/
Eugene F. Guthrie, Chief      Operations Branch 2 Division of Reactor Safety


Docket Nos.:    50-327, 50-328 License Nos.:  DPR-77, DPR-79
K. Smith                                      2


==Enclosures:==
==Enclosures:==
  (See Page 2)
: 1. Final Answer Key
K. Smith      2
: 2. Examination Results Summary
: 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000


==Enclosures:==
K. Smith                                                 2
: 1. Final Answer Key            2. Examination Results Summary                      3. Individual Answer Sheets
 
cc w/o encls.:
Tennessee Valley Authority ATTN:  Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
 
Tennessee Valley Authority ATTN:  Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
 
K. Smith     2  


==Enclosures:==
==Enclosures:==
: 1. Final Answer Key           2. Examination Results Summary                       3. Individual Answer Sheets  
: 1. Final Answer Key
 
: 2. Examination Results Summary
cc w/o encls.:
: 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000  
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE      NON-PUBLICLY AVAILABLE       SENSITIVE       X NON-SENSITIVE ADAMS: X Yes   ACCESSION NUMBER: ML16190A425                           X SUNSI REVIEW COMPLETE OFFICE             RII:DRS         RII:DRS SIGNATURE         JHK             GJM/FOR NAME               JKIRBY         EGUTHRIE DATE                   6/30/16         7/5 /16 E-MAIL COPY?       YES         NO   YES       NO YES     NO  YES NO YES     NO  YES     NO}}
 
Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000  
 
LETTER W/O ENCLSX  PUBLICLY AVAILABLE      NON-PUBLICLY AVAILABLE           SENSITIVE         X   NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:   ML16190A425                                                           X SUNSI REVIEW COMPLE TE OFFICE RII:DRS RII:DRS     SIGNATURE JHK GJM/FOR     NAME JKIRBY EGUTHRIE     DATE 6/30/16 7/5 /16     E-MAIL COPY?   YES NO     YES NO   YES NO  YES NO   YES NO  YES NO}}

Latest revision as of 16:56, 30 October 2019

June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
ML16190A425
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/05/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Smith K
Tennessee Valley Authority
References
Download: ML16190A425 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

SUBJECT:

SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS

Dear Mr. Smith:

On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning this examination, please contact me at (404) 997-4662.

Sincerely,

/RA by Gerald J. McCoy for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosures:

(See Page 2)

K. Smith 2

Enclosures:

1. Final Answer Key
2. Examination Results Summary
3. Individual Answer Sheets cc w/o encls.:

Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

K. Smith 2

Enclosures:

1. Final Answer Key
2. Examination Results Summary
3. Individual Answer Sheets cc w/o encls.:

Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML16190A425 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE JHK GJM/FOR NAME JKIRBY EGUTHRIE DATE 6/30/16 7/5 /16 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO