{{Adams
{{Adams
| number = ML16237A060
| number = ML16256A311
| issue date = 08/31/2016
| issue date = 09/12/2016
| title = Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
| title = Errata for Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
| author name = Taylor N H
| author name = Hipschman T
| author affiliation = NRC/RGN-IV/DRP/RPB-B
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Koehl D
| addressee name = Koehl D
| addressee affiliation = South Texas Project Nuclear Operating Co
| addressee affiliation = South Texas Project Nuclear Operating Co
| docket = 05000498, 05000499
| docket = 05000498, 05000499
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person = Taylor N H
| contact person = Hipschman T
| case reference number = ML16237A060
| document report number = IR 2016005
| document report number = IR 2016005
| document type = Inspection Plan, Inspection Report, Letter
| package number = ML16256A306
| page count = 7
| document type = Letter
| page count = 13
}}
}}


Line 18: Line 20:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 12, 2016
[[Issue date::August 31, 2016]]


Mr. Dennis Koehl President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
==SUBJECT:==
ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)


SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)
==Dear Mr. Koehl:==
It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A060) was improperly marked. The inspection plan contained the markings of Official Use Only - Sensitive Internal Information/Security-Related Information, however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosures:
1. South Texas Project Electric Generating Station, Units 1 and 2 Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A060)
 
Attachment 2 - Proposed Inspection Plan        STP Page 1 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EP-2 - EP PERFORMANCE INDICATORS      2 1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance 1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness 1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EP EXERCISE INSPECTION      4 1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation 1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes TSB 52B - BIENNIAL PI&R INSPECTION      4 1, 2 08/08/2016 08/12/2016 IP 71152B Problem Identification and Resolution 1, 2 08/22/2016 08/26/2016 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION      1 2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY      2 1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 5678 - RADIATION SAFETY - TEAM      4 1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION      4 1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]
1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]
EXAM - INITIAL EXAM      6 1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)
2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)
1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)
2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)
RS 13 PI - RADIATION SAFETY      3 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure 1
 
Attachment 2 - Proposed Inspection Plan        STP Page 2 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates          No. of Staff Number Start End Inspection Activity    Title  on Site RS 13 PI - RADIATION SAFETY      3 1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1      1 1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR EP-1 - BIENNIAL EP PROGRAM INSPECTION      1 1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing 1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION      1 1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness 1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS      3 1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS)      1 1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants RS 24 - RADIATION SAFETY      2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment ISFSI - FIRST CASK LOADING INSPECTION      1 1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BRQ - BRQ INSPECTION      3 1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program 7111108 - INSERVICE INSPECTION UNIT 2      1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EB1-07T - STP HEAT SINK PERFORMANCE      1 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION      4 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure 1
 
Attachment 2 - Proposed Inspection Plan      STP Page 3 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site EP-1 - EP EXERCISE INSPECTION    4 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Enclosure 1
 
UNITED STATES ust 31, 2016
 
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)


==Dear Mr. Koehl:==
==Dear Mr. Koehl:==
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," and Order EA-12-051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation." The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans." In Staff Requirements Memorandum - SECY 16-0009, "Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities," the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, "Operating Reactor Assessment Program." In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1141 with any questions you have regarding this letter.
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
 
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts Enclosure 2 towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
 
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 817-200-1141 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:
South Texas Project Electric Generating Station, Units 1 and 2 Inspection/
Activity Plan
 
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information  STP Page 1 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates          No. of Staff Number Start End Inspection Activity    Title  on Site EP-2 - EP PERFORMANCE INDICATORS      2 1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance 1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness 1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EP EXERCISE INSPECTION      4 1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation 1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes TSB 52B - BIENNIAL PI&R INSPECTION      4 1, 2 08/08/2016 08/12/2016 IP 71152B  Problem Identification and Resolution 1, 2 08/22/2016 08/26/2016 IP 71152B  Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION      1 2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY      2 1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 5678 - RADIATION SAFETY - TEAM      4 1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION      4 1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]
1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]
EXAM - INITIAL EXAM      6 1 08/14/2017 08/18/2017 X02592  INITIAL EXAM STP U1 (09/2017)
2 08/14/2017 08/18/2017 X02593  INITIAL EXAM STP U2 (09/2017)
1 09/25/2017 10/04/2017 X02592  INITIAL EXAM STP U1 (09/2017)
2 09/25/2017 10/04/2017 X02593  INITIAL EXAM STP U2 (09/2017)
RS 13 PI - RADIATION SAFETY      3 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information
 
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information  STP Page 2 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates          No. of Staff Number Start End Inspection Activity    Title  on Site RS 13 PI - RADIATION SAFETY      3 1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1      1 1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR EP-1 - BIENNIAL EP PROGRAM INSPECTION      1 1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing 1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION      1 1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness 1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS      3 1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS)      1 1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants RS 24 - RADIATION SAFETY      2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment ISFSI - FIRST CASK LOADING INSPECTION      1 1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BRQ - BRQ INSPECTION      3 1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program 7111108 - INSERVICE INSPECTION UNIT 2      1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EB1-07T - STP HEAT SINK PERFORMANCE      1 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION      4 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information
 
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP Page 3 of 3      South Texas Project 08/30/2016 09:36:28    Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EP-1 - EP EXERCISE INSPECTION    4 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information


Sincerely,/RA/ Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80
ML16237A060 SUNSI Review  ADAMS  Publicly Available Non-Sensitive Keyword:
By: NHT  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE: RIV SPE:DRP/B D: DRS  D: DRP C: DRP/B NAME DProulx AVegel  TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/
DATE 8/22/16 8/22/16  8/23/16 8/23/16


===Enclosure:===
Letter to Dennis Koehl from Nicholas H. Taylor dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)
South Texas Project Electric Generating Station, Units 1 and 2 Inspection/ Activity Plan Page 1 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-2-EP PERFORMANCE INDICATORS21 IPDrill/Exercise Performance71151-EP0107/11/201607/15/20161 IPERO Readiness71151-EP0207/11/201607/15/20161 IPAlert & Notification System Reliability71151-EP0307/11/201607/15/2016EP-3-BIENNIAL EP EXERCISE INSPECTION41 IPExercise Evaluation711140107/11/201607/15/20161 IPEmergency Action Level and Emergency Plan Changes711140407/11/201607/15/2016TSB 52B-BIENNIAL PI&R INSPECTION41, 2 IPProblem Identification and Resolution71152B08/08/201608/12/20161, 2 IPProblem Identification and Resolution71152B08/22/201608/26/201671111.08-INSERVICE INSPECTION12 IPInservice Inspection Activities - PWR7111108P10/10/201610/21/2016RS 12 PI-RADIATION SAFETY21, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0110/24/201610/28/20161, 2 IPOccupational ALARA Planning and Controls71124.0210/24/201610/28/20161, 2 IPOccupational Exposure Control Effectiveness71151-OR0110/24/201610/28/20161, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0110/24/201610/28/2016RS 5678-RADIATION SAFETY - TEAM41, 2 IPRadiation Monitoring Instrumentation71124.0511/28/201612/02/20161, 2 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/28/201612/02/20161, 2 IPRadiological Environmental Monitoring Program71124.0711/28/201612/02/20161, 2 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/28/201612/02/2016EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION41, 2 IPFire Protection [Triennial]7111105T01/23/201701/27/20171, 2 IPFire Protection [Triennial]7111105T02/06/201702/10/2017EXAM-INITIAL EXAM61 INITIAL EXAM STP U1 (09/2017)X0259208/14/201708/18/20172 INITIAL EXAM STP U2 (09/2017)X0259308/14/201708/18/20171 INITIAL EXAM STP U1 (09/2017)X0259209/25/201710/04/20172 INITIAL EXAM STP U2 (09/2017)X0259309/25/201710/04/2017RS 13 PI-RADIATION SAFETY31, 2 IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/201703/31/20171, 2 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/201703/31/20171, 2 IPOccupational Exposure Control Effectiveness71151-OR0103/27/201703/31/2017This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov


Page 2 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018RS 13 PI-RADIATION SAFETY31, 2 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0103/27/201703/31/201771111.08-INSERVICE INSPECTION UNIT 111 IPInservice Inspection Activities - PWR7111108P03/27/201704/07/2017EP-1-BIENNIAL EP PROGRAM INSPECTION11, 2 IPAlert and Notification System Testing711140205/08/201705/12/20171, 2 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/08/201705/12/20171, 2 IPEmergency Action Level and Emergency Plan Changes711140405/08/201705/12/20171, 2 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/08/201705/12/2017EP-2-EP PERFORMANCE INDICATOR VERIFICATION11, 2 IPDrill/Exercise Performance71151-EP0105/08/201705/12/20171, 2 IPERO Readiness71151-EP0205/08/201705/12/20171, 2 IPAlert & Notification System Reliability71151-EP0305/08/201705/12/2017EB1-17T-STP 50.59 EVALUATIONS OF CHANGES, TESTS31, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T05/22/201705/26/20171, 2 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T06/05/201706/09/2017ISFSI-DRY RUN INSPECTION (MULTIPLE WEEKS)11, 2 IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.106/01/201707/20/2017RS 24-RADIATION SAFETY21, 2 IPOccupational ALARA Planning and Controls71124.0207/31/201708/04/20171, 2 IPOccupational Dose Assessment71124.0407/31/201708/04/2017ISFSI-FIRST CASK LOADING INSPECTION11, 2 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.108/01/201708/10/2017BRQ-BRQ INSPECTION31, 2 IPLicensed Operator Requalification Program7111111B08/28/201709/01/20177111108-INSERVICE INSPECTION UNIT 212 IPInservice Inspection Activities - PWR7111108P04/02/201804/13/2018EB1-07T-STP HEAT SINK PERFORMANCE11, 2 IPHeat Sink Performance7111107T06/11/201806/15/2018EP-1-EP EXERCISE INSPECTION41, 2 IPExercise Evaluation711140106/11/201806/15/20181, 2 IPEmergency Action Level and Emergency Plan Changes711140406/11/201806/15/20181, 2 IPDrill/Exercise Performance71151-EP0106/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
ML16256A311 / ML16256A306 SUNSI Review  ADAMS Publicly Available Non-Sensitive Keyword:
By: EDU  Yes No Non-Publicly Available Sensitive NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE /RA/
DATE 9/12/16


Page 3 of 308/30/201609:36:28Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteSouth Texas ProjectInspection / Activity Plan07/01/2016-06/30/2018EP-1-EP EXERCISE INSPECTION41, 2 IPERO Readiness71151-EP0206/11/201806/15/20181, 2 IPAlert & Notification System Reliability71151-EP0306/11/201806/15/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Letter to Mr. Dennis Koehl from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Alfred.Sanchez@nrc.gov)
Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov)
DRS Branch Chiefs (R4DRS-BC1@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
}}
}}

Latest revision as of 15:18, 30 October 2019

Errata for Mid-Cycle Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2016005 and 05000499/2016005)
ML16256A311
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/12/2016
From: Thomas Hipschman
Division of Reactor Safety IV
To: Koehl D
South Texas
Hipschman T
Shared Package
ML16256A306 List:
References
ML16237A060 IR 2016005
Download: ML16256A311 (13)


Text

ber 12, 2016

SUBJECT:

ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Dear Mr. Koehl:

It was identified that the enclosed inspection plan in a letter to you dated August 31, 2016 (ML16237A060) was improperly marked. The inspection plan contained the markings of Official Use Only - Sensitive Internal Information/Security-Related Information, however, the inspection plan did not contain information under that category. The inspection plan that was originally placed into ADAMS has been corrected by striking through the markings. The original Mid-Cycle Assessment Letter and the corrected inspection plan are enclosed. Please note that neither the content of the assessment letter, nor the inspection plan has changed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Hipschman, Team Leader Inspection Program and Assessment Team Division of Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosures:

1. South Texas Project Electric Generating Station, Units 1 and 2 Inspection/Activity Plan 2. 2016 Mid-Cycle Assessment Letter (ML16237A060)

Attachment 2 - Proposed Inspection Plan STP Page 1 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP-2 - EP PERFORMANCE INDICATORS 2 1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance 1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness 1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EP EXERCISE INSPECTION 4 1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation 1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes TSB 52B - BIENNIAL PI&R INSPECTION 4 1, 2 08/08/2016 08/12/2016 IP 71152B Problem Identification and Resolution 1, 2 08/22/2016 08/26/2016 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION 1 2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY 2 1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 5678 - RADIATION SAFETY - TEAM 4 1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]

1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]

EXAM - INITIAL EXAM 6 1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)

1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)

RS 13 PI - RADIATION SAFETY 3 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure 1

Attachment 2 - Proposed Inspection Plan STP Page 2 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 13 PI - RADIATION SAFETY 3 1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1 1 1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing 1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1 1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness 1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS 3 1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS) 1 1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants RS 24 - RADIATION SAFETY 2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment ISFSI - FIRST CASK LOADING INSPECTION 1 1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BRQ - BRQ INSPECTION 3 1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program 7111108 - INSERVICE INSPECTION UNIT 2 1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EB1-07T - STP HEAT SINK PERFORMANCE 1 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION 4 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure 1

Attachment 2 - Proposed Inspection Plan STP Page 3 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP-1 - EP EXERCISE INSPECTION 4 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure 1

UNITED STATES ust 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

Dear Mr. Koehl:

On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of South Texas Project Electric Generating Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, South Texas Project Electric Generating Station, Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at South Texas Project Electric Generating Station, Units 1 and during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts Enclosure 2 towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1141 with any questions you have regarding this letter.

Sincerely,

/RA/

Nicholas H. Taylor, Chief Projects Branch B Division of Reactor Projects Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:

South Texas Project Electric Generating Station, Units 1 and 2 Inspection/

Activity Plan

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP Page 1 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP-2 - EP PERFORMANCE INDICATORS 2 1 07/11/2016 07/15/2016 IP 71151-EP01 Drill/Exercise Performance 1 07/11/2016 07/15/2016 IP 71151-EP02 ERO Readiness 1 07/11/2016 07/15/2016 IP 71151-EP03 Alert & Notification System Reliability EP-3 - BIENNIAL EP EXERCISE INSPECTION 4 1 07/11/2016 07/15/2016 IP 7111401 Exercise Evaluation 1 07/11/2016 07/15/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes TSB 52B - BIENNIAL PI&R INSPECTION 4 1, 2 08/08/2016 08/12/2016 IP 71152B Problem Identification and Resolution 1, 2 08/22/2016 08/26/2016 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION 1 2 10/10/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RS 12 PI - RADIATION SAFETY 2 1, 2 10/24/2016 10/28/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/24/2016 10/28/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/24/2016 10/28/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 10/24/2016 10/28/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RS 5678 - RADIATION SAFETY - TEAM 4 1, 2 11/28/2016 12/02/2016 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 11/28/2016 12/02/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/28/2016 12/02/2016 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 11/28/2016 12/02/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1, 2 01/23/2017 01/27/2017 IP 7111105T Fire Protection [Triennial]

1, 2 02/06/2017 02/10/2017 IP 7111105T Fire Protection [Triennial]

EXAM - INITIAL EXAM 6 1 08/14/2017 08/18/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 08/14/2017 08/18/2017 X02593 INITIAL EXAM STP U2 (09/2017)

1 09/25/2017 10/04/2017 X02592 INITIAL EXAM STP U1 (09/2017)

2 09/25/2017 10/04/2017 X02593 INITIAL EXAM STP U2 (09/2017)

RS 13 PI - RADIATION SAFETY 3 1, 2 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/27/2017 03/31/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP Page 2 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 13 PI - RADIATION SAFETY 3 1, 2 03/27/2017 03/31/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71111.08 - INSERVICE INSPECTION UNIT 1 1 1 03/27/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 05/08/2017 05/12/2017 IP 7111402 Alert and Notification System Testing 1, 2 05/08/2017 05/12/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 05/08/2017 05/12/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 05/08/2017 05/12/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies EP-2 - EP PERFORMANCE INDICATOR VERIFICATION 1 1, 2 05/08/2017 05/12/2017 IP 71151-EP01 Drill/Exercise Performance 1, 2 05/08/2017 05/12/2017 IP 71151-EP02 ERO Readiness 1, 2 05/08/2017 05/12/2017 IP 71151-EP03 Alert & Notification System Reliability EB1-17T - STP 50.59 EVALUATIONS OF CHANGES, TESTS 3 1, 2 05/22/2017 05/26/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 06/05/2017 06/09/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - DRY RUN INSPECTION (MULTIPLE WEEKS) 1 1, 2 06/01/2017 07/20/2017 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants RS 24 - RADIATION SAFETY 2 1, 2 07/31/2017 08/04/2017 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 07/31/2017 08/04/2017 IP 71124.04 Occupational Dose Assessment ISFSI - FIRST CASK LOADING INSPECTION 1 1, 2 08/01/2017 08/10/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BRQ - BRQ INSPECTION 3 1, 2 08/28/2017 09/01/2017 IP 7111111B Licensed Operator Requalification Program 7111108 - INSERVICE INSPECTION UNIT 2 1 2 04/02/2018 04/13/2018 IP 7111108P Inservice Inspection Activities - PWR EB1-07T - STP HEAT SINK PERFORMANCE 1 1, 2 06/11/2018 06/15/2018 IP 7111107T Heat Sink Performance EP-1 - EP EXERCISE INSPECTION 4 1, 2 06/11/2018 06/15/2018 IP 7111401 Exercise Evaluation 1, 2 06/11/2018 06/15/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 06/11/2018 06/15/2018 IP 71151-EP01 Drill/Exercise Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information

Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information STP Page 3 of 3 South Texas Project 08/30/2016 09:36:28 Inspection / Activity Plan Report 22 07/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP-1 - EP EXERCISE INSPECTION 4 1, 2 06/11/2018 06/15/2018 IP 71151-EP02 ERO Readiness 1, 2 06/11/2018 06/15/2018 IP 71151-EP03 Alert & Notification System Reliability This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure Official Use Only - Sensitive Internal Information/Security-Related Information

ML16237A060 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: NHT Yes No Non-Publicly Available Sensitive NRC-002 OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B NAME DProulx AVegel TWPruett NTaylor SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/

DATE 8/22/16 8/22/16 8/23/16 8/23/16

Letter to Dennis Koehl from Nicholas H. Taylor dated August 31, 2016 SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

STP Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov

ML16256A311 / ML16256A306 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: EDU Yes No Non-Publicly Available Sensitive NRC-002 OFFICE TL:IPAT NAME THipschman SIGNATURE /RA/

DATE 9/12/16

Letter to Mr. Dennis Koehl from Thomas R. Hipschman dated September 12, 2016 SUBJECT: ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 (REPORT 05000498/2016005 AND 05000499/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Alfred.Sanchez@nrc.gov)

Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Administrative Assistant (Lynn.Wright@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov)

DRS Branch Chiefs (R4DRS-BC1@nrc.gov)

ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov