ML17208A989: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/12/1980
| issue date = 09/12/1980
| title = Responds to NRC 800702 Ltr Re TMI-related Tech Specs. Proposed Specs Have Been Drafted & Forwarded to Onsite & Offsite Review Committees for Review & Approval
| title = Responds to NRC 800702 Ltr Re TMI-related Tech Specs. Proposed Specs Have Been Drafted & Forwarded to Onsite & Offsite Review Committees for Review & Approval
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000250, 05000251, 05000335
| docket = 05000250, 05000251, 05000335
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:REGULA          Y  INFORi>ATION DISTR IBVTIO'YSTE4l (RIOS)
ACCESSION NBR:80091e0378                    OOC,DATE:  80/09/12    NOTARIZED: No                        QOCKET FACIL:50 250 Turkey Point Planti Unit                  3p  Florida Power and Light                    C  05000250 50 251 Turkey Point Plant< Unit                Qp Florida Power and Light                    C  05000251 50 335 St AUTH'A~E
                        ~  Lucie Plantg Unit AUTHOR ii AFFILIAT ION Florida Power 4 Light Co                  ~      500 NA~<E,Florida                        5 Light Co.
UHRIGP  R ~ E ~                        Power REC IP ~                  RECIPIENT AFFILIATION EISENHUTPO,G.          'ivision of Licensing J
==SUBJECT:==
Responds            to  NRC  800702 Itr re T'>I related Tech soecs    have been drafted 3, forwarded to      Specs'roposed onsite offsite    review committees for review          L  aooroval.
DISTRISVTION CODE: 400IS TITLE: General COPIES RECEIVED:LTR    ~ROC      g Distribution for after Issuance of Operating Lic SI7E:    /
NOTES:
RECIPIENT                COPIES            RECIPIENT                        COPIES ID CODE/NABLE              LTTR ENCL        IO CODE/NA'".E                  LTTR EiilCL ACTION,'VARGAPS ~                    09      13  1      CLARKtRR        OQ                13      1 INTE~t" 4L:    0/0IR    HU~ F ACOB                        OIR HU~ FAG P            07 ICE                  06                    I~RC PDR        02 OELD                  11                    OR ASSESS    BR  10
          ,  REG  FILE            01 EXTERNAL: ACRS                      09      Ie          LPOR            03 NSIC                  05        1 3<I Sstss T  T<L    U  '=EP  G. CO+I      S  ~  i'JIiE3;  LTTR          ENCL
P.O. 8OX 529100, MIAMI, FL 33152 4
FI.ORIOA POVIER 4 I.IGHT COMPANY September    12, 1980 L-80-301-Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
==Dear Mr. Eisenhut:==
Re:  Turkey Point and St. Lucie Plants Docket Nos. 50-250, 50-251, and 50-335 TMI Related Technical  S  ecifi cations The proposed specifi cations requested by your letter of July 2, 1980 have been drafted and forwarded to the on-site and off-site review committees for review and approval. The normal review and comment process takes approximately 4 to 6 weeks, therefore, we have scheduled October 31, 1980 as the submittal date for Turkey Point Units 3 8 4 and St. Lucie Unit        l.
Please  call if you  have additional questions on this subject.
Very  truly yours, Robert E. Uhrig Vice President Advanced Systems  5 Technology REU/MAS/md cc:  J.P. O'Rei lly, Region II Harold F. Reis, Esquire}}

Latest revision as of 01:15, 30 October 2019

Responds to NRC 800702 Ltr Re TMI-related Tech Specs. Proposed Specs Have Been Drafted & Forwarded to Onsite & Offsite Review Committees for Review & Approval
ML17208A989
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/12/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-301, NUDOCS 8009160378
Download: ML17208A989 (2)


Text

REGULA Y INFORi>ATION DISTR IBVTIO'YSTE4l (RIOS)

ACCESSION NBR:80091e0378 OOC,DATE: 80/09/12 NOTARIZED: No QOCKET FACIL:50 250 Turkey Point Planti Unit 3p Florida Power and Light C 05000250 50 251 Turkey Point Plant< Unit Qp Florida Power and Light C 05000251 50 335 St AUTH'A~E

~ Lucie Plantg Unit AUTHOR ii AFFILIAT ION Florida Power 4 Light Co ~ 500 NA~<E,Florida 5 Light Co.

UHRIGP R ~ E ~ Power REC IP ~ RECIPIENT AFFILIATION EISENHUTPO,G. 'ivision of Licensing J

SUBJECT:

Responds to NRC 800702 Itr re T'>I related Tech soecs have been drafted 3, forwarded to Specs'roposed onsite offsite review committees for review L aooroval.

DISTRISVTION CODE: 400IS TITLE: General COPIES RECEIVED:LTR ~ROC g Distribution for after Issuance of Operating Lic SI7E: /

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NABLE LTTR ENCL IO CODE/NA'".E LTTR EiilCL ACTION,'VARGAPS ~ 09 13 1 CLARKtRR OQ 13 1 INTE~t" 4L: 0/0IR HU~ F ACOB OIR HU~ FAG P 07 ICE 06 I~RC PDR 02 OELD 11 OR ASSESS BR 10

, REG FILE 01 EXTERNAL: ACRS 09 Ie LPOR 03 NSIC 05 1 3<I Sstss T T<L U '=EP G. CO+I S ~ i'JIiE3; LTTR ENCL

P.O. 8OX 529100, MIAMI, FL 33152 4

FI.ORIOA POVIER 4 I.IGHT COMPANY September 12, 1980 L-80-301-Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Eisenhut:

Re: Turkey Point and St. Lucie Plants Docket Nos. 50-250, 50-251, and 50-335 TMI Related Technical S ecifi cations The proposed specifi cations requested by your letter of July 2, 1980 have been drafted and forwarded to the on-site and off-site review committees for review and approval. The normal review and comment process takes approximately 4 to 6 weeks, therefore, we have scheduled October 31, 1980 as the submittal date for Turkey Point Units 3 8 4 and St. Lucie Unit l.

Please call if you have additional questions on this subject.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/md cc: J.P. O'Rei lly, Region II Harold F. Reis, Esquire