ML17208A989

From kanterella
Jump to navigation Jump to search
Responds to NRC 800702 Ltr Re TMI-related Tech Specs. Proposed Specs Have Been Drafted & Forwarded to Onsite & Offsite Review Committees for Review & Approval
ML17208A989
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/12/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-301, NUDOCS 8009160378
Download: ML17208A989 (2)


Text

REGULA Y INFORi>ATION DISTR IBVTIO'YSTE4l (RIOS)

ACCESSION NBR:80091e0378 OOC,DATE: 80/09/12 NOTARIZED: No QOCKET FACIL:50 250 Turkey Point Planti Unit 3p Florida Power and Light C 05000250 50 251 Turkey Point Plant< Unit Qp Florida Power and Light C 05000251 50 335 St AUTH'A~E

~ Lucie Plantg Unit AUTHOR ii AFFILIAT ION Florida Power 4 Light Co ~ 500 NA~<E,Florida 5 Light Co.

UHRIGP R ~ E ~ Power REC IP ~ RECIPIENT AFFILIATION EISENHUTPO,G. 'ivision of Licensing J

SUBJECT:

Responds to NRC 800702 Itr re T'>I related Tech soecs have been drafted 3, forwarded to Specs'roposed onsite offsite review committees for review L aooroval.

DISTRISVTION CODE: 400IS TITLE: General COPIES RECEIVED:LTR ~ROC g Distribution for after Issuance of Operating Lic SI7E: /

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NABLE LTTR ENCL IO CODE/NA'".E LTTR EiilCL ACTION,'VARGAPS ~ 09 13 1 CLARKtRR OQ 13 1 INTE~t" 4L: 0/0IR HU~ F ACOB OIR HU~ FAG P 07 ICE 06 I~RC PDR 02 OELD 11 OR ASSESS BR 10

, REG FILE 01 EXTERNAL: ACRS 09 Ie LPOR 03 NSIC 05 1 3<I Sstss T T<L U '=EP G. CO+I S ~ i'JIiE3; LTTR ENCL

P.O. 8OX 529100, MIAMI, FL 33152 4

FI.ORIOA POVIER 4 I.IGHT COMPANY September 12, 1980 L-80-301-Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Eisenhut:

Re: Turkey Point and St. Lucie Plants Docket Nos. 50-250, 50-251, and 50-335 TMI Related Technical S ecifi cations The proposed specifi cations requested by your letter of July 2, 1980 have been drafted and forwarded to the on-site and off-site review committees for review and approval. The normal review and comment process takes approximately 4 to 6 weeks, therefore, we have scheduled October 31, 1980 as the submittal date for Turkey Point Units 3 8 4 and St. Lucie Unit l.

Please call if you have additional questions on this subject.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/md cc: J.P. O'Rei lly, Region II Harold F. Reis, Esquire