ML17212A823: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/08/1981
| issue date = 09/08/1981
| title = Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC 810806 Ltr Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements
| title = Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC 810806 Ltr Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = Oreilly J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| docket = 05000335
| docket = 05000335
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000335/1981015]]


=Text=
=Text=
{{#Wiki_filter:I n 8 l 7F'D III A 8.P.O.8OX 529100 MIAMI, F L 33152 I=5~~rn)...~5~FLORIDA POWER 8(LIGHT COMPANY September 8, 1981 L-81-392 Mr.James P.O'Reilly, Director, Region II Office of Inspect'ion
{{#Wiki_filter:I n P.O. 8OX 529100 MIAMI,F L 33152 I
and Enforcement
                                                                                                =
U.S.Nuclear Regulatory
5~~
Commission
rn)...~5~
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr.O'Reilly: Re: St.Lucie Unit 1 Docket No.50-335 IE Ins ection Re ort 81-15 Florida Power 8 Light Company has reviewed the subject inspection
FLORIDA POWER   8( LIGHT COMPANY 8 l 7F'D III  A 8 .
report and a response is attached.There is no proprietary
September 8, 1981 L-81-392 Mr. James P. O'Reilly, Director,       Region II Office of Inspect'ion     and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia       30303
information
 
in the report.Very truly yours, obert E.Uhrig Vice President Advanced Systems 8 Technology
==Dear Mr. O'Reilly:==
REU/PLP/ras
 
cc: Harold F.Reis, Esquire~sioqowooso
Re:   St. Lucie Unit     1 Docket No. 50-335 IE Ins ection Re ort 81-15 Florida Power   8 Light Company     has reviewed   the subject inspection report and a response   is attached.
Eiio>~~'I'DR ADOCK 05000335 i PD~R PEOPLE...SERVING PEOPLE  
There   is no proprietary information in the report.
I~I II iH  
Very truly yours, obert E. Uhrig Vice President Advanced Systems     8   Technology REU/PLP/ras cc:   Harold F. Reis, Esquire Eiio>~~ 'I
ATTACHMENT
    ~sioqowooso 05000335
Re: St.Lucie Unit 1 Docket No.50-335 IE Ins ection Re ort 81-15 FINDING Technical Specification
    'DR ADOCK               PD~R i
6.10.2(g)requires records of training and qualification
PEOPLE... SERVING PEOPLE
for current members of the plant staff to be retained for the duration of the facility operating license.QI 17 PR/PSL-l, QA Records, Revision 3 references
 
Technical Specification
I ~
6.10 for defining which records are QA records.QI 17 PR/PSL-1, Revision 3 requires permanent storage of records to be in the vault and temporary storage to be in cabinets (1-hour fire rated)or some other area which meets the requirements
I II iH
of FSAR 17.2.17.3.
 
Contrary to the above, training records being stored temporarily
ATTACHMENT Re:   St. Lucie Unit   1 Docket No. 50-335 IE Ins ection Re ort 81-15 FINDING Technical Specification 6.10.2(g) requires records of training and qualification for current members of the plant staff to be retained for the duration of the facility operating license. QI 17 PR/PSL-l, QA Records, Revision 3 references Technical Specification 6.10 for defining which records are QA records. QI 17 PR/PSL-1, Revision 3 requires permanent storage of records to be in the vault and temporary storage to be in cabinets (1-hour fire rated) or some other area which meets the requirements of FSAR 17.2.17.3.
in two out of four departments
Contrary to the above, training records being stored temporarily in two out of four departments inspected were being stored in cabinets that do not meet the 1-hour fire rating. These records were not being stored in some other area permitted by FSAR 17.2.17.3.
inspected were being stored in cabinets that do not meet the 1-hour fire rating.These records were not being stored in some other area permitted by FSAR 17.2.17.3.
 
RESPONSE 1).2)3)4)FPL concurs in the finding.FPL considers this to be an oversight and a misunderstanding
===RESPONSE===
of the definition
: 1) FPL concurs in the     finding.
of records.Steps are being taken to store such records in accordance
    . 2)  FPL considers this to     be an oversight   and a misunderstanding of the definition of records.
with appl i cabl e r equi rements.FPL is evaluating
: 3)  Steps are being taken to store such records         in accordance with appl i cabl e r equi rements.
the present methods of documenting
: 4)  FPL is evaluating the present methods of documenting training activities to allow departments to retain sufficient information for training status     and program follow-up.
training activities
: 5) Full compliance is expected to       be achieved   by January 1, 1982.
to allow departments
 
to retain sufficient
I
information
        ~ ~
for training status and program follow-up.
fl II 4
5)Full compliance
0}}
is expected to be achieved by January 1, 1982.  
I~~fl II 4 0
}}

Latest revision as of 23:42, 29 October 2019

Ack Receipt of IE Insp Rept 50-335/81-15,on 810622-0702. No Proprietary Info.Also Forwards Response to NRC 810806 Ltr Re Violation Noted in IE Insp Rept.Steps Taken to Store Records in Accordance W/Applicable Requirements
ML17212A823
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/08/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17212A822 List:
References
L-81-392, NUDOCS 8109290660
Download: ML17212A823 (4)


Text

I n P.O. 8OX 529100 MIAMI,F L 33152 I

=

5~~

rn)...~5~

FLORIDA POWER 8( LIGHT COMPANY 8 l 7F'D III A 8 .

September 8, 1981 L-81-392 Mr. James P. O'Reilly, Director, Region II Office of Inspect'ion and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: St. Lucie Unit 1 Docket No. 50-335 IE Ins ection Re ort 81-15 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in the report.

Very truly yours, obert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc: Harold F. Reis, Esquire Eiio>~~ 'I

~sioqowooso 05000335

'DR ADOCK PD~R i

PEOPLE... SERVING PEOPLE

I ~

I II iH

ATTACHMENT Re: St. Lucie Unit 1 Docket No. 50-335 IE Ins ection Re ort 81-15 FINDING Technical Specification 6.10.2(g) requires records of training and qualification for current members of the plant staff to be retained for the duration of the facility operating license. QI 17 PR/PSL-l, QA Records, Revision 3 references Technical Specification 6.10 for defining which records are QA records. QI 17 PR/PSL-1, Revision 3 requires permanent storage of records to be in the vault and temporary storage to be in cabinets (1-hour fire rated) or some other area which meets the requirements of FSAR 17.2.17.3.

Contrary to the above, training records being stored temporarily in two out of four departments inspected were being stored in cabinets that do not meet the 1-hour fire rating. These records were not being stored in some other area permitted by FSAR 17.2.17.3.

RESPONSE

1) FPL concurs in the finding.

. 2) FPL considers this to be an oversight and a misunderstanding of the definition of records.

3) Steps are being taken to store such records in accordance with appl i cabl e r equi rements.
4) FPL is evaluating the present methods of documenting training activities to allow departments to retain sufficient information for training status and program follow-up.
5) Full compliance is expected to be achieved by January 1, 1982.

I

~ ~

fl II 4

0