ML17223A593: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/30/1990
| issue date = 03/30/1990
| title = Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress
| title = Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress
| author name = SAGER D A
| author name = Sager D
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED DIRBUTION DEMONSTION SYSTElVI*P REGULATORY INFORMATION DISTRIBUTION SYSTEM'(RIDS)ACCESSION NBR:9004100197 DOC.DATE: 90/03/30 NOTARIZED:
{{#Wiki_filter:ACCELERATED DIRBUTION                             DEMONSTION               SYSTElVI
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light, Co.50-389 St.Lucie Plant, Unit 2, Florida Power'Light Co.AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
  *P REGULATORY INFORMATION DISTRIBUTION SYSTEM             '(RIDS)
Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
ACCESSION NBR:9004100197                 DOC.DATE:   90/03/30   NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light, Co.                     05000335 50-389 St. Lucie Plant, Unit 2, Florida Power'                 Light Co. 05000389 AUTH. NAME           AUTHOR AFFILIATION NOTES'OCKET SAGER,D.A.
RECIP.NAME


==SUBJECT:==
==SUBJECT:==
Forwards status of 10CFR50.62,"Requirements for Reduction of Risk From ATWS" mods at plant as of 900315.DISTRIBUTION CODE: A055D COPIES RECEIVED:LTR
 
:.ENCL SIZE: TITLE: OR/Licensing Submittal Salem ATWS Events GL-.83-28 NOTES'OCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS NRR/DLPQ/LPEB10 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL LPDR NSIC COPIES LTTR ENCL 1 0 1 1 6 6 1 0 1 1 1 1 1 0 1 1.1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ESB 8D NRR/DOEA/OGCB11 NRR/DST/SPLB 8D OC/LFM 8~ILE 0 NRC PDR COPIES LTTR ENCL 3 3 1 1 1 0 1 0 1 0 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
of Risk DISTRIBUTION CODE: A055D Florida Power 6 Light Co.
PLEASE HELP US TO REDUCE WASTEt CONTACT THE.DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 18 s'>rc Pj I 4 J" 4 1 l P.O.Box 14000, Juno Beach, FL 33408-0420 MARCH 3 0 1990 L-90-120 10 CFR 50.62 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RECIPIENT AFFILIATION Forwards status Document Control Branch (Document Control Desk) of 10CFR50.62, "Requirements for Reduction From ATWS" mods at plant as of 900315.
Re: St.Lucie Unit Nos.1 and 2 Docket Nos.50-335 and 50-389 Antici ated Transients Without Scram On March 1, 1989, Florida Power&Light Company (FPL)met with the NRC to discuss the conceptual design of the St.Lucie Units 1 and 2 plant modifications to meet 10 CFR 50.62,>>Requirements for reduction of risk from anticipated transients without scram (ATWS)events for light-water-cooled nuclear power plants." In that meeting, the Staff requested bi-monthly updates on the modifications implementation status.Attached is the status of the 10 CFR 50.62 modifications at St.Lucie Units 1 and 2 as of March 15, 1990.Should there be any questions, please contact us.Very truly yours, D.A.Sa Vice P St.Lu r ident Plant DAS/EJW/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9004iOOi97 900330 PDR ADOCK 0~<000335'R PDC an FPL Group company w~t*a$~f ATTACHMENT 10 CFR 50'2 IMPLEMENTATION STATUS AS OF MARCH 15'990 ST LUCIE UNITS 1 AND 2 The status of engineering activities for implementation of 10 CFR 50.62 is: Unit 2 2~The engineering design of the Engineered Safety Features Actuation System (ESFAS)and Auxiliary Feedwater Actuation System (AFAS)portion of the ATWS modification is continuing and is approximately 50%complete.The status of procurement activities for implementation of 10 CFR 50.62 is: Consolidated Controls Corporation (CCC): Unit 2 Module engineering for the ESFAS cabinet portion of the Diverse Scram System (DSS)is complete.The DSS module prototype fabrication is in progress and prototype testing is scheduled for mid-April.
COPIES RECEIVED:LTR       :. ENCL     SIZE:
Combustion Engineering (CE): Unit 2 The AFAS Matrix Relay printed circuit boards for the AFAS are in the engineering phase.The Qualification Analysis, drawing and technical manual revisions are due in mid-May.Other Procurement:
TITLE: OR/Licensing Submittal               Salem ATWS   Events GL-.83-28 RECIPIENT               COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD2-2 LA                       1    0    PD2-2 PD                3    3 NORRIS,J                       1    1 INTERNAL: ACRS                             6    6    NRR/DEST/ESB 8D        1    1 NRR/DLPQ/LPEB10                1     0     NRR/DOEA/OGCB11        1    0 NRR/DST/SICB 7E                1    1    NRR/DST/SPLB 8D         1    0 NUDOCS-ABSTRACT                1    1    OC/LFM                 1    0 OGC/HDS2                      1    0      8~ILE         0       1    1 RES/DSIR/EIB                  1     1 EXTERNAL    LPDR                          .1     1     NRC PDR NSIC                          1     1 NOTE TO ALL "RIDS" RECIPIENTS:
Unit 2 3~The load contactors have been received onsite.Installation of ATWS modifications at St.Lucie Unit 1 is completed.
PLEASE HELP US TO REDUCE WASTEt CONTACT THE. DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Final system test will be conducted prior to the completion of the current refueling outage.Modifications are on schedule for ATWS modifications implementation at St.Lucie Unit 2 during the upcoming calendar year 1990 refueling outage.
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 24   ENCL     18
I t~~r 2}}
 
s'> rc Pj I
4 J"
1 4 l
 
P.O. Box 14000, Juno Beach, FL 33408-0420 MARCH 3 0 1990 L-90-120 10 CFR 50.62 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:     St. Lucie Unit Nos. 1 and 2 Docket Nos. 50-335 and 50-389 Antici ated Transients Without Scram On March 1, 1989,             Florida Power & Light Company (FPL) met with the NRC   to discuss the conceptual design of the St. Lucie Units 1 and 2   plant modifications to meet 10 CFR 50.62, >>Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants."                                   In that meeting,           the Staff requested           bi-monthly updates                   on       the modifications implementation status.                 Attached is the status of the 10 CFR 50.62 modifications at St. Lucie Units 1 and 2 as of March 15, 1990.
Should there be any questions,               please contact us.
Very   truly yours, D. A. Sa         r Vice   P       ident St. Lu         Plant DAS/EJW/gp Attachment cc:     Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 9004iOOi97 900330   0~<000335
    'RPDR ADOCK                PDC an FPL Group company
 
w ~t
*a$
  ~ f ATTACHMENT 10 CFR 50 '2 IMPLEMENTATION STATUS AS OF MARCH 15'990 ST LUCIE UNITS 1 AND 2 The status of engineering activities for implementation of     10 CFR 50.62 is:
Unit 2 The engineering design of the Engineered Safety Features Actuation System (ESFAS) and Auxiliary Feedwater Actuation System (AFAS) portion of the ATWS modification is continuing and is approximately 50% complete.
2 ~ The status of procurement activities for implementation of 10 CFR 50.62 is:
Consolidated Controls Corporation (CCC):
Unit 2 Module engineering for the ESFAS cabinet     portion of the Diverse Scram System (DSS) is complete.
The DSS module   prototype fabrication is in progress and prototype testing is scheduled for mid-April.
Combustion Engineering (CE):
Unit 2 The AFAS Matrix Relay printed   circuit boards for the AFAS are in the engineering phase.
The Qualification Analysis, drawing   and technical manual revisions are due in mid-May.
Other Procurement:
Unit 2 The load contactors have been received onsite.
3 ~ Installation of ATWS modifications at St. Lucie Unit 1 is completed. Final system test will be conducted prior to the completion of the current refueling outage. Modifications are on schedule for ATWS modifications implementation at St. Lucie Unit 2 during the upcoming calendar year 1990 refueling outage.
 
I t~ ~r 2}}

Latest revision as of 22:53, 29 October 2019

Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress
ML17223A593
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/30/1990
From: Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-120, NUDOCS 9004100197
Download: ML17223A593 (5)


Text

ACCELERATED DIRBUTION DEMONSTION SYSTElVI

  • P REGULATORY INFORMATION DISTRIBUTION SYSTEM '(RIDS)

ACCESSION NBR:9004100197 DOC.DATE: 90/03/30 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light, Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power' Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION NOTES'OCKET SAGER,D.A.

RECIP.NAME

SUBJECT:

of Risk DISTRIBUTION CODE: A055D Florida Power 6 Light Co.

RECIPIENT AFFILIATION Forwards status Document Control Branch (Document Control Desk) of 10CFR50.62, "Requirements for Reduction From ATWS" mods at plant as of 900315.

COPIES RECEIVED:LTR  :. ENCL SIZE:

TITLE: OR/Licensing Submittal Salem ATWS Events GL-.83-28 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 3 3 NORRIS,J 1 1 INTERNAL: ACRS 6 6 NRR/DEST/ESB 8D 1 1 NRR/DLPQ/LPEB10 1 0 NRR/DOEA/OGCB11 1 0 NRR/DST/SICB 7E 1 1 NRR/DST/SPLB 8D 1 0 NUDOCS-ABSTRACT 1 1 OC/LFM 1 0 OGC/HDS2 1 0 8~ILE 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL LPDR .1 1 NRC PDR NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEt CONTACT THE. DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 18

s'> rc Pj I

4 J"

1 4 l

P.O. Box 14000, Juno Beach, FL 33408-0420 MARCH 3 0 1990 L-90-120 10 CFR 50.62 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit Nos. 1 and 2 Docket Nos. 50-335 and 50-389 Antici ated Transients Without Scram On March 1, 1989, Florida Power & Light Company (FPL) met with the NRC to discuss the conceptual design of the St. Lucie Units 1 and 2 plant modifications to meet 10 CFR 50.62, >>Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants." In that meeting, the Staff requested bi-monthly updates on the modifications implementation status. Attached is the status of the 10 CFR 50.62 modifications at St. Lucie Units 1 and 2 as of March 15, 1990.

Should there be any questions, please contact us.

Very truly yours, D. A. Sa r Vice P ident St. Lu Plant DAS/EJW/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 9004iOOi97 900330 0~<000335

'RPDR ADOCK PDC an FPL Group company

w ~t

  • a$

~ f ATTACHMENT 10 CFR 50 '2 IMPLEMENTATION STATUS AS OF MARCH 15'990 ST LUCIE UNITS 1 AND 2 The status of engineering activities for implementation of 10 CFR 50.62 is:

Unit 2 The engineering design of the Engineered Safety Features Actuation System (ESFAS) and Auxiliary Feedwater Actuation System (AFAS) portion of the ATWS modification is continuing and is approximately 50% complete.

2 ~ The status of procurement activities for implementation of 10 CFR 50.62 is:

Consolidated Controls Corporation (CCC):

Unit 2 Module engineering for the ESFAS cabinet portion of the Diverse Scram System (DSS) is complete.

The DSS module prototype fabrication is in progress and prototype testing is scheduled for mid-April.

Combustion Engineering (CE):

Unit 2 The AFAS Matrix Relay printed circuit boards for the AFAS are in the engineering phase.

The Qualification Analysis, drawing and technical manual revisions are due in mid-May.

Other Procurement:

Unit 2 The load contactors have been received onsite.

3 ~ Installation of ATWS modifications at St. Lucie Unit 1 is completed. Final system test will be conducted prior to the completion of the current refueling outage. Modifications are on schedule for ATWS modifications implementation at St. Lucie Unit 2 during the upcoming calendar year 1990 refueling outage.

I t~ ~r 2