ML17286A626: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D+RIBUTION DEMONSTRATION SYSTEM')r~~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9103070007 DOC.DATE: 91/02/28 NOTARIZED:
{{#Wiki_filter:ACCELERATED D+RIBUTION                                                       SYSTEM DEMONSTRATION
YES FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION SORENSEN,G.C.
                                                                                          ')r
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,Z.B.
  ~ ~
Region 5 (Post 820201)DOCKET 05000397 R  
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9103070007             DOC. DATE: 91/02/28   NOTARIZED: YES         DOCKET FACIL:50-397   WPPSS   Nuclear Project, Unit 2, Washington Public Powe           05000397 AUTH. NAME             AUTHOR AFFILIATION SORENSEN,G.C.         Washington Public Power Supply System RECIP.NAME             RECIPIENT AFFILIATION MARTIN,Z.B.           Region 5 (Post 820201)                                                   R


==SUBJECT:==
==SUBJECT:==
Confirms that util issued Technical Assessment 90-015, I"Safety Sys Functional Insp,Svc Water,." in Dec 1990,per Generic Ltr 89-13 re svc water'ys.problems affecting D ,safety-related equipment.
Confirms that util issued Technical Assessment 90-015,                                 I "Safety Sys Functional Insp,Svc Water,." in Dec 1990,per Generic Ltr 89-13 re svc water'ys.problems affecting                                 D
DISTRIBUTION CODE: A065D COPIES RECEIVED LTR ENCL SIZE:~X 5 TITLE: Generic Ltr 89-13-Svc Water Sys Problems Affecting Safety-Related E/NOTES: RECIPIENT ID CODE/NAME ENG,P.L.I NTERNAL CHU i A NRR/PD 1 3 EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NSIC COPIES LTTR ENCL 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
            ,safety-related equipment.
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL 5 D'S 0~~1 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 February 28, 1991 G02-91-041 Docket No.50-397 J.B.Martin U.S.Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596
DISTRIBUTION CODE: A065D             COPIES RECEIVED LTR       ENCL       SIZE:     ~X 5 TITLE: Generic     Ltr   89-13     Svc Water Sys Problems   Affecting Safety-Related   E
                                                                                                  /
NOTES:
RECIPIENT               COPIES            RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL      ID CODE/NAME       LTTR ENCL            D ENG,P.L.                     1      1 D
INTERNAL  CHU i A NRR/PD 1 3           1      1                            1    1 EXTERNAL: NRC PDR                       1     1     NSIC                   1   1 D
D NOTE TO ALL "RIDS" RECIPIENTS:
                                                                                                'S PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 5   ENCL   5


==Dear Hr.Hartin:==
0
  ~
~
1
 
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way  ~ Richland, Washington 99352 February 28, 1991 G02-91 -041 Docket No. 50-397 J. B. Martin U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596
 
==Dear Hr. Hartin:==


==Subject:==
==Subject:==
NUCLEAR PLANT NO.2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETTER 89-13;SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY RELATED E(UIPHENT  
NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETTER 89-13; SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY RELATED E(UIPHENT


==Reference:==
==Reference:==
Letter, G02-90-017, GC Sorensen            (SS)  to  NRC Region V, same  subject, dated February 5,          1990 In the reference letter, the-Supply System advised the NRC that we would include the confirmation of item IV of Generic Letter 89-13 (i.e., that the Service Water System will perform its intended function in accordance with the licensing basis of the plant) as part of a Safety System Functional Inspection (SSFI) on the entire service water system. The Supply System committed to provide confirmation of the completion of this activity by February 1991. The purpose of this letter is to provide such confirmation.
In December, 1990 the Supply System issued Technical Assessment 90-015, "Safety System Functional Inspection, Service Water". As required by Generic Letter 89-13, a complete system walkdown inspection was performed as part of the SSFI. The timing of this walkdown satisfies the "within the past 2 years" requirement of the generic letter. The ability to perform required safety functions in the event of failure of a single active component is satisfied by having two totally redundant systems.        The overall result of the SSFI with the walkdown was to confirm that the service water system will perform its intended functions in accordance with the licensing basis for the plant.
This completes the Supply System's response to Generic Letter 89-13.
Very  truly yours, G. C. Sorensen,    Manager Regulatory Programs cc:    JB Martin -    NRC RV                                  DL  Williams - BPA/399 NS Reynolds - Winston      &  Strawn                  NRC Site Inspector - 901A PL Eng  -  NRC I'203070007          5'10228 PDR    ADOCK  050003'r7 P                      PDR


Letter, G02-90-017, GC Sorensen (SS)to NRC Region V, same subject, dated February 5, 1990 In the reference letter, the-Supply System advised the NRC that we would include the confirmation of item IV of Generic Letter 89-13 (i.e., that the Service Water System will perform its intended function in accordance with the licensing basis of the plant)as part of a Safety System Functional Inspection (SSFI)on the entire service water system.The Supply System committed to provide confirmation of the completion of this activity by February 1991.The purpose of this letter is to provide such confirmation.
0
In December, 1990 the Supply System issued Technical Assessment 90-015,"Safety System Functional Inspection, Service Water".As required by Generic Letter 89-13, a complete system walkdown inspection was performed as part of the SSFI.The timing of this walkdown satisfies the"within the past 2 years" requirement of the generic letter.The ability to perform required safety functions in the event of failure of a single active component is satisfied by having two totally redundant systems.The overall result of the SSFI with the walkdown was to confirm that the service water system will perform its intended functions in accordance with the licensing basis for the plant.This completes the Supply System's response to Generic Letter 89-13.Very truly yours, G.C.Sorensen, Manager Regulatory Programs cc: JB Martin-NRC RV NS Reynolds-Winston&Strawn PL Eng-NRC DL Williams-BPA/399 NRC Site Inspector-901A I'203070007 5'10228 PDR ADOCK 050003'r7 P PDR 0~g 1 C.>>t~~), 4 STATE OF WASHINGTON)
      ~   g 1
)COUNTY OF BENTON)g~p~Q Qj, Q9 ($~fVIC~ppr SyZ<ern Wblernp a+Bc&'ng  
C.>>
t ~ ~
                  ),
4
 
g ~p~       Q Qj, Q9 ($ ~fVIC
                                                              ~ppr SyZ<ern Wblernp a+Bc&'ng STATE OF WASHINGTON)                               


==Subject:==
==Subject:==
gtt dg uia quiPrrtert$
 
I, G.C.SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein;that I have full authority to execute this oath;that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.DATE:~, 1991 G.C.Sorensen, Manager Regulatory Programs On this date personally appeared before me G.C.SORENSEN, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
                              )                                gtt dg     uia         quiPrrtert$
GIVEN under my hand and seal this~day of 1991.Notary Public in and for the STATE OF WASHINGTON Residing at My Commission Expires  
COUNTY OF BENTON              )
.g L" li re~'l'P h1~WIN I'}}
I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.
DATE:     ~                                 , 1991 G. C. Sorensen, Manager Regulatory Programs On this date personally appeared before me G. C. SORENSEN, to me known to be the
                                      ~
individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.
GIVEN under my hand and seal this               day of                                   1991.
Notary Public in and for the STATE OF WASHINGTON Residing at My Commission Expires
 
                          .g L
" li re~
                'l' P
h 1 ~ WIN I'}}

Latest revision as of 14:15, 29 October 2019

Confirms That Util Issued Technical Assessment 90-015, Safety Sys Functional Insp,Svc Water, in Dec 1990,per Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment
ML17286A626
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1991
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17286A627 List:
References
GL-89-13, GO2-91-041, GO2-91-41, NUDOCS 9103070007
Download: ML17286A626 (6)


Text

ACCELERATED D+RIBUTION SYSTEM DEMONSTRATION

')r

~ ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9103070007 DOC. DATE: 91/02/28 NOTARIZED: YES DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION SORENSEN,G.C. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION MARTIN,Z.B. Region 5 (Post 820201) R

SUBJECT:

Confirms that util issued Technical Assessment 90-015, I "Safety Sys Functional Insp,Svc Water,." in Dec 1990,per Generic Ltr 89-13 re svc water'ys.problems affecting D

,safety-related equipment.

DISTRIBUTION CODE: A065D COPIES RECEIVED LTR ENCL SIZE: ~X 5 TITLE: Generic Ltr 89-13 Svc Water Sys Problems Affecting Safety-Related E

/

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D ENG,P.L. 1 1 D

INTERNAL CHU i A NRR/PD 1 3 1 1 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL "RIDS" RECIPIENTS:

'S PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL 5

0

~

~

1

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 February 28, 1991 G02-91 -041 Docket No. 50-397 J. B. Martin U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Hr. Hartin:

Subject:

NUCLEAR PLANT NO. 2, OPERATING LICENSE NPF-21 RESPONSE TO GENERIC LETTER 89-13; SERVICE WATER SYSTEM PROBLEMS AFFECTING SAFETY RELATED E(UIPHENT

Reference:

Letter, G02-90-017, GC Sorensen (SS) to NRC Region V, same subject, dated February 5, 1990 In the reference letter, the-Supply System advised the NRC that we would include the confirmation of item IV of Generic Letter 89-13 (i.e., that the Service Water System will perform its intended function in accordance with the licensing basis of the plant) as part of a Safety System Functional Inspection (SSFI) on the entire service water system. The Supply System committed to provide confirmation of the completion of this activity by February 1991. The purpose of this letter is to provide such confirmation.

In December, 1990 the Supply System issued Technical Assessment 90-015, "Safety System Functional Inspection, Service Water". As required by Generic Letter 89-13, a complete system walkdown inspection was performed as part of the SSFI. The timing of this walkdown satisfies the "within the past 2 years" requirement of the generic letter. The ability to perform required safety functions in the event of failure of a single active component is satisfied by having two totally redundant systems. The overall result of the SSFI with the walkdown was to confirm that the service water system will perform its intended functions in accordance with the licensing basis for the plant.

This completes the Supply System's response to Generic Letter 89-13.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs cc: JB Martin - NRC RV DL Williams - BPA/399 NS Reynolds - Winston & Strawn NRC Site Inspector - 901A PL Eng - NRC I'203070007 5'10228 PDR ADOCK 050003'r7 P PDR

0

~ g 1

C.>>

t ~ ~

),

4

g ~p~ Q Qj, Q9 ($ ~fVIC

~ppr SyZ<ern Wblernp a+Bc&'ng STATE OF WASHINGTON)

Subject:

) gtt dg uia quiPrrtert$

COUNTY OF BENTON )

I, G. C. SORENSEN, being duly sworn, subscribe to and say that I am the Manager, Regulatory Programs, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

DATE: ~ , 1991 G. C. Sorensen, Manager Regulatory Programs On this date personally appeared before me G. C. SORENSEN, to me known to be the

~

individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act and deed for the uses and purposes herein mentioned.

GIVEN under my hand and seal this day of 1991.

Notary Public in and for the STATE OF WASHINGTON Residing at My Commission Expires

.g L

" li re~

'l' P

h 1 ~ WIN I'