IR 05000341/2017405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE , ILLINOIS 60532-4352 October 31, 2017 Mr. Keith Polson Chief Nuclear Officer DTE Electric Company Fermi 2 6400 North Dixie Highway
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 31, 2017
- 210 NOC Newport, MI 48166


SUBJECT: FERMI POWER PLANT, UNIT 2  
==SUBJECT:==
- NRC SECURITY BASELINE INSPECTION REPORT 05000341/201740 5
FERMI POWER PLANT, UNIT 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000341/2017405


==Dear Mr. Polson:==
==Dear Mr. Polson:==
On September 21, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2, and the NRC inspector s discussed the results of this inspection with Mr. M. O'Connor and other members of your staff. The results of this inspection are documented in the enclosed report.
On September 21, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2, and the NRC inspectors discussed the results of this inspection with Mr. M. OConnor and other members of your staff. The results of this inspection are documented in the enclosed report.


The inspector s documented one NRC-identified finding of very low security significance (Green)
The inspectors documented one NRC-identified finding of very low security significance (Green)
in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as N on-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. One cross-cutting aspect was assigned to the above finding in the area of Problem Identification and Resolution
in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
- Self-Assessment. Specifically, the organization failed to conduct self
-critical and objective assessments of its programs and practices to identify an issue, [P.6
]. If you contest the violation or significance of this NCV
, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington
One cross-cutting aspect was assigned to the above finding in the area of Problem Identification and Resolution - Self-Assessment. Specifically, the organization failed to conduct self-critical and objective assessments of its programs and practices to identify an issue, [P.6].
, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Fermi Nuclear Power Plant, Unit 2
If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Fermi Nuclear Power Plant, Unit 2.
. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S.


Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III, and the NRC Resident Inspector at Fermi Nuclear Power Plant, Unit 2.
-0001; with copies to the Regional Administrator, Region III, and the NRC Resident Inspector at Fermi Nuclear Power Plant, Unit 2
. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding."


However, the enclosed report contains Security
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security
 
-Related Information, please mark your entire response "Security
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA Steven Orth Acting for/
Sincerely,
 
/RA Steven Orth Acting for/
Kenneth Riemer , Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50
Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure:
-341 License No. NPF
IR 05000341/2017405 cc: M. OConnor, Security Manager D. Asselin, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV
-43 Nonpublic  
 
===Enclosure:===
IR 05000341/2017405 cc: M. O'Connor, Security Manager D. Asselin, State Liaison Officer, State of Michigan cc w/o encl:
Distribution via LISTSERV
}}
}}

Latest revision as of 09:46, 29 October 2019

NRC Security Baseline Inspection Report 05000341/2017405 (Cover Letter Only) (Nte)
ML17304B028
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/31/2017
From: Kenneth Riemer
Plant Support Branch II
To: Polson K
DTE Electric Company
References
IR 2017405
Download: ML17304B028 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 31, 2017

SUBJECT:

FERMI POWER PLANT, UNIT 2 - NRC SECURITY BASELINE INSPECTION REPORT 05000341/2017405

Dear Mr. Polson:

On September 21, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2, and the NRC inspectors discussed the results of this inspection with Mr. M. OConnor and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspectors documented one NRC-identified finding of very low security significance (Green)

in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

One cross-cutting aspect was assigned to the above finding in the area of Problem Identification and Resolution - Self-Assessment. Specifically, the organization failed to conduct self-critical and objective assessments of its programs and practices to identify an issue, [P.6].

If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Fermi Nuclear Power Plant, Unit 2.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III, and the NRC Resident Inspector at Fermi Nuclear Power Plant, Unit 2.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA Steven Orth Acting for/

Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure:

IR 05000341/2017405 cc: M. OConnor, Security Manager D. Asselin, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV