{{#Wiki_filter:DONALD C.COOK NUCLEAR PLANT-UNXTS NO 1 AND 2.ASME B&PV CODE SECTXON XI PUMP INSERVXCE TEST PROGRAM A.The pump test program shall be conducted in accordance with Subsection IMP of Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code through Summer 1975 Addenda, except for specific relief requested in accordance with 10 CFR 50.55a(g)(5)(iii)which is identified in Table B.B.The period for which the pump inservice-test program is applic-able is the period beginning December 23, 1978 for Unit 1 (second third, first inspection interval)and the period begin-ning July 1, 1978 for Unit 2 (first third, first inspection interval).The revision to the program,.proposed herein by the Code Relief Request, dated 11/30/82, shall be implemented only upon approval by the NRC.C.The pump test, program was developed employing the classification guidelines contained in 10 CRF 50.2 (v)for Quality Group A and Regulatory Guide 1.26, Revision 2 for Quality Groups B and C.(Quality Group A is the same as ASME Class l.Group B is 2, and Group C is 3).Using these guidelines and IWP-1100, the pump list attached as Table A was developed.
{{#Wiki_filter:}}
Table A identi-fies the following:
The pump number and service it performs along with the drawing identification number on which it is found.The applicable test parameters:
2.3.Speed Inlet Pressure Differential Pressure Determined as the difference between measured discharge and suction pressures 4.Flow Rate 5.Vibration Amplitude 6.Bearing-Temperature iii.The test, frequency required.Revision 1 11/39 82 8212100300 821206 PDR ADOCK 05000315 P PDR
)
DONALD C.COOK NUCLEAR PLANT-UNXTS NO.1 AND 2 TABLE A-PUMP INSERVICE TEST PROGRAM~PROGRAM
 
==SUMMARY==
TEST PARtQIETERS PUMP SERVICE DWG.NO.AUXILIARY FEEDWATER (5106A)ESSENTIAL SERVICE HATER (5113)CENTRIFUG CHARGING (5129)BORIC ACID TRANSFER (5131)COMPONENT COOLING WATER (5135A)PUMP NUMBER PP-3H PP-3E PP-4 PP-7W PP-7E PP-50W PP-50E PP 6 1 u-/PP-46-2'PP-46-3)g g PP-46-4J PP-10W PP-10E SPEED N NO NO YES NO NO NO NO NO NO NO NO NO NO.INLET PRESSURE P~a YES YES YES YES (3)YES (3)YES YES YES (3)YES (3)YES (3)YES (3)YES YES DIFFERENTIAL PRESSURE WP YES YES YES YES YES YES YES YES YES YES YES YES YES FLOW RATE Q YES*YES*YES*YES YES NO**NO**NO*NO*NO*NO*YES YES VXBRATXON AMPLITUDE V YES YES YES YES YES YES YES YES YES YES YES YES YES BEARING TEMPERATURE Tb (1)YES YES YES YES YES YES YES YES YES YES YES YES YES TEST'REQUENCY (1)(2)QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY QUARTERLY RESIDUAL HEAT RE-MOVAL (5143)PP-35W PP-35E CONTAINMENT PP-9W SPRAY PP-9E (5144)SAFETY PP-26N XNJECTION PP-26S (5142)NO NO NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES NO*+NO**YES*~YES*YES~YES*YES YES YES YES YES YES YES YES YES YES YES YES QUARTERLY QUARTERLY QUARTERLY QUAR'l~Y QUARTERLY QUARTERLY (1)Bearing Temperature will be measured annually-per the Code.(2)Refer to TABLE B.(3)Inlet Pressure Measurement is Head of Liquid.*Pumps are tested on by-pass (test)loops since it is impractical to test in regular circuits-per the Code.**Pumps are tested on recirculation (minimum flow)paths to prevent unsafe operating conditions (impract-ical to align system for full flow test)-per the Code.Revision 1 11/30/82 4 DONALD C.COOK NUCLEAR PLANT-UNITS NO.1 AND 2 TABLE B-PUMP INSERVXCE TEST PROGRAM CODE RELXEF REQUEST Test Frequency a~Request that frequency of testing be changed from monthly to quarterly for the following pumps:*Auxiliary Feedwater Pumps Centrifugal Charging Pumps Containment Spray Pumps Residual Heat Removal Pumps Safety Injection Pumps The requirement.
of the testing of the pumps at monthly intervals causes unnecessary operation of safeguards equipment which could be detrimental to the availability, operability and useful service life of the equipment.
b.Request that frequency of testing be changed from monthly to quarterly for the following pumps:*Boric Acid Transfer Pumps Component Cooling Water Pumps Essential Service Water Pumps One or more of each of these pumps are generally in operation.
However to provide a uniform test pro-gram, the frequency of testing should be the same for all pumps involved in the program.*Note: This quarterly test frequency is in accord with the 1980 Edition of Section XX, Subarticle XWP-3400.Revision 0 11/30/82 1}}

Revision as of 23:32, 23 October 2019

to Pump Inservice Test Program
ML17320A230
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/30/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A229 List:
References
PROC-821130, NUDOCS 8212100300
Download: ML17320A230 (5)


Text