{{#Wiki_filter:l'nstruct)on or Proc"'Jre I emporary Sheet This temporary sheet applies to/<<<z~~~~+~+8m~~-S Instruction or Procedure No.)~)acB a.~P><<i Revision No.8 TEMPORARY SHEET NO.7~/iof.L The.following change (+instituted effective (Date)new requirement
{{#Wiki_filter:}}
()shall be-8 A'm/T~r~f~D.c M+~3 c~i>>~.c.d C A~Vr7 r ('0 wo This change should be made a permanent revision to the Instruction or Procedure:
ggES a NO 0 NOT KNOWN, additional review required Explfaticn Date: Originator.
Management tafF: Senior React~ter:)PNSRC.: ''ce Plant Managerf'r'tandard Dist.List No.: Distribution:
Form No.4330 830ii90ib2 830ii3 PDR ADOCK 050003i5', REVISED 7/78 WHITE ORIGINAL CANARY ORIGINATOR COPY PINK WORKING COPY~
I e PHP 2080 EPP.006 4.1.2 4.1.3 4.1.4 4.1.1.2 Zf R-15 or R-33 is off-scale high, obtain a radiation reading at 6" from the GSLO or SJAE exhaust line.Appropriate vent flow rate (Unit Vent, GSLO, or SJAE).Wind velocity and direction from the 50 foot elevation.
lI Determine PASCALL Category as per the table below: DT=(T9180ft.
-T930Ft.)C PASCALL CATEGORY-.9-.8 7~2+7.9 to-.8 to-.7 to-.2 to+.7 to+1.8+1.8 A B C D E F G 4.2 Xf~meteorological instrumentation is inoperable use Exhibit G to estimate wind speed and PASCALL Category.Obtain wind direction from the Visitors Center or State Police.4.3 Select appropriate graph(s)to use and fill in data blanks.4.3.1 4.3.2 4.3.3 4.3.4 4.3.'5 4.3.6 NOTE: R-26 On-Scale;Exhibit A R-26 Off-Scale; Exhibit B R-33 On-Scale;Exhibit C R-15 On-Scale;Exhibit D R-15, R-33 Off-Scale; Exhibit E Waste Gas Decay Tank Release;Exhibit F R-15 On-Scale will always result in less than 1 mR/hr off-site.With steam generator tube ruptures, readings would be expected also on R-33.The dose associated with the release from a steam generator tube rupture will be the sum of the doses calculated from R-15 and R-33.Page 2 of 17 Rev.3
'l
~4~t v~~i I 1 PMP EPP INDEX INDIANA 5 MICHIGAN POMER COMPANY DONALD C.COOK iVUCLEAR PLANT P ANT MANAG R P Indev Identification Number Title Revision iVo.And Date Comments PMP 2080 EPP.001 Emergency Plan Activation and Condition Classification Revision 3 10-12-82 EPP.002 Unusual Event.EPP.003 Alert fPP.004 Site Emergency EPP:00 General Emergency EPP.OO Initial Dose Assessment (Gaseous)CAiNCELLED 10-.29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 CANCELLED 10-29-81 Revihion 3 8-27-82 TP-1,"-4-83 EXP Procedure Revision fPP.007 Initial Release Assessments (Liquid)Revision 0 TP-1,2-23-82 Exp NA 4-1-81 EPP.008 EPP.009 Initiating Manning of Emer-gency Response Facilities 8 Calling Off-Duty Personnel Fire Emergency Guidelines Revision,3 10-12-82 Revision 1 6-15-82 EPP.010 Toxic Gas Release Guidelines f PP.011 Natural Emergency Guidelines fPP.012 Initial Off-Site Notificatio Revision 1 6-'2-82 Revisiorl 1 11-15-82 Revision 2 18-19-82 Pca~Rev.Data!-F-83}}

Revision as of 23:18, 23 October 2019

Public Version of Temporary Sheet 1 to Rev 3 to Emergency Plan Implementing Procedure PMP 2080 EPP.006, Initial Dose Assessments. Procedure Temporary Sheet Encl
ML17320A308
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/05/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A306 List:
References
PMP-2080-EPP., PMP-2080-EPP.00, NUDOCS 8301190162
Download: ML17320A308 (5)