ML17354A775: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)ACCESSION NBR:9802110045 DOC.DATE: 98/02/03 NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)
NO DOCKET FACIL 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HOVEY,R.J.
ACCESSION NBR:9802110045             DOC.DATE:   98/02/03     NOTARIZED: NO             DOCKET FACIL 50-250 Turkey       Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME               AUTHOR AFFILIATION HOVEY,R.J.             Florida Power & Light Co.
Florida Power&Light Co.RECZP.NAME
RECZP.NAME           . RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
.RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards revised Emeregency Plan Implementing Procedure O-EPIP-20101,"Duties of Emergency Coordinator." Medical emergency section previously contained in O-EPIP-20101,moved to administrative procedure.
Forwards revised Emeregency Plan Implementing Procedure O-EPIP-20101, "Duties of Emergency Coordinator." Medical emergency section previously contained in O-EPIP-20101,moved to administrative procedure.
DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL I SIZE: I TITLE: OR Submittal:
DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL I                       SIZE: I TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedu es, NOTES:
Emergency Preparedness Plans, Implement'g Procedu NOTES: es, RECIPIENT ID CODE/NAME PD2-3 LA CROTEAU,R COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1 1 INTERNAL: AEOD/HAGAN, D NRR/DRPM/PERB EXTERNAL: NOAC 1 1 1 1 1 1 NRC PDR 1 1 FXLE CENTER 0 2 2 NUDOCS=ABSTRAC 1 1 D N NOTE TO ALL NRIDS" RECIPIENTS:
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL          ID  CODE/NAME        LTTR ENCL PD2-3 LA                   1     1       PD2-3 PD                   1    1 CROTEAU,R                  1     1 INTERNAL: AEOD/HAGAN,D                 1    1      FXLE CENTER 0              2    2 NRR/DRPM/PERB             1     1       NUDOCS=ABSTRAC            1     1 EXTERNAL: NOAC                          1     1       NRC PDR                   1     1 D
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083%OTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10  
N NOTE TO ALL NRIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083
  %OTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10


FEB 03]998 L-98-025 10 CFR 50.54(q)10 CFR 50 Appendix E U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Revised Emer encv Plan Im lementin Procedures Pursuant to the requirements of 10 CFR 50.54(q)and 10 CFR 50 Appendiz E, enclosed is one copy of revised Emergency Plan Implementing Procedure O-EPIP-20101,"Duties of Emergency Coordinator." The medical emergency section previously contained in 0-EPIP-20101 has been moved to an administrative procedure.
FEB 03 ]998 L-98-025 10 CFR 50.54(q) 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:     Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revised Emer encv Plan Im lementin Procedures Pursuant to the requirements of 10 CFR 50.54(q) and 10 CFR 50 Appendiz E, enclosed is one copy of revised Emergency Plan Implementing Procedure O-EPIP-20101, "Duties of Emergency Coordinator."
Some other minor editorial changes have been made.Additionally, EPIP-20131,"Transfer of Contaminated Injured Personnel Offsite," has been cancelled, because the transfer of contaminated injured personnel offsite no longer requires declaration of an emergency.
The medical emergency section previously contained in 0-EPIP-20101 has been moved to an administrative procedure. Some other minor editorial changes have been made.
This information is now contained in an administrative procedure.
Additionally, EPIP-20131, "Transfer of Contaminated Injured Personnel Offsite," has been cancelled, because the transfer of contaminated injured personnel offsite no longer requires declaration of an emergency. This information is now contained in an administrative procedure.
The implementation date for these procedure changes was January 27, 1998.FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.Should there be any questions, please contact us.Very truly yours.R.J.Hovey Vice President Turkey Point Plant CLM Enclosures cc: Regional Administrator, Region II, USNRC (2 copies)Senior Resident Inspector.
The implementation date for these procedure changes was January 27, 1998. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.
USNRC, Turkey Point Plant (w/o enclosure) 9802ii0045 980203 PDR ADQCK 05000250 F PDR/IIIIII/IIIIIIIIIIIIII IIIII/III/IIII/I
Should there be any questions, please contact us.
>z FPt, GtouP comP>~Y}}
Very truly yours.
R. J. Hovey Vice President Turkey Point Plant CLM Enclosures cc:     Regional Administrator, Region II, USNRC (2 copies)
Senior Resident Inspector. USNRC, Turkey Point Plant (w/o enclosure) 9802ii0045 980203   05000250 PDR     ADQCK F                         PDR
                                                          /IIIIII/IIIIIIIIIIIIII IIIII/III/IIII/I
      >z FPt, GtouP comP>~Y}}

Latest revision as of 08:06, 22 October 2019

Forwards Revised EPIP 0-EPIP-20101, Duties of Emergency Coordinator. Medical Emergency Section Previously in 0-EPIP-20101 Moved to Administrative procedure.EPIP-20131, Transfer of Contaminated Injured Personnel... Cancelled
ML17354A775
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/03/1998
From: Hovey R
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17354A776 List:
References
L-98-025, L-98-25, NUDOCS 9802110045
Download: ML17354A775 (3)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR:9802110045 DOC.DATE: 98/02/03 NOTARIZED: NO DOCKET FACIL 50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HOVEY,R.J. Florida Power & Light Co.

RECZP.NAME . RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised Emeregency Plan Implementing Procedure O-EPIP-20101, "Duties of Emergency Coordinator." Medical emergency section previously contained in O-EPIP-20101,moved to administrative procedure.

DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL I SIZE: I TITLE: OR Submittal: Emergency Preparedness Plans, Implement'g Procedu es, NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA 1 1 PD2-3 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/HAGAN,D 1 1 FXLE CENTER 0 2 2 NRR/DRPM/PERB 1 1 NUDOCS=ABSTRAC 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL NRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083

%OTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

FEB 03 ]998 L-98-025 10 CFR 50.54(q) 10 CFR 50 Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revised Emer encv Plan Im lementin Procedures Pursuant to the requirements of 10 CFR 50.54(q) and 10 CFR 50 Appendiz E, enclosed is one copy of revised Emergency Plan Implementing Procedure O-EPIP-20101, "Duties of Emergency Coordinator."

The medical emergency section previously contained in 0-EPIP-20101 has been moved to an administrative procedure. Some other minor editorial changes have been made.

Additionally, EPIP-20131, "Transfer of Contaminated Injured Personnel Offsite," has been cancelled, because the transfer of contaminated injured personnel offsite no longer requires declaration of an emergency. This information is now contained in an administrative procedure.

The implementation date for these procedure changes was January 27, 1998. FPL has determined that the changes described do not result in a decrease in the effectiveness of the Emergency Plan.

Should there be any questions, please contact us.

Very truly yours.

R. J. Hovey Vice President Turkey Point Plant CLM Enclosures cc: Regional Administrator, Region II, USNRC (2 copies)

Senior Resident Inspector. USNRC, Turkey Point Plant (w/o enclosure) 9802ii0045 980203 05000250 PDR ADQCK F PDR

/IIIIII/IIIIIIIIIIIIII IIIII/III/IIII/I

>z FPt, GtouP comP>~Y