(11 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML18005A099 | | | number = ML18005A099 |
| | issue date = 01/25/2018 | | | issue date = 01/25/2018 |
| | title = Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 (EPID L-2017-LRM-0051 | | | title = Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 |
| | author name = Pulvirenti A L | | | author name = Pulvirenti A |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000382 | | | docket = 05000382 |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = Pulvirenti A L | | | contact person = Pulvirenti A |
| | case reference number = EPID L-2017-LRM-0051 | | | case reference number = EPID L-2017-LRM-0051 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
| | page count = 4 | | | page count = 4 |
| | project = EPID:L-2017-LRM-0051, EPID:L-2017-LRM-0051 | | | project = EPID:L-2017-LRM-0051 |
| | stage = Other | | | stage = Meeting |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter::.V" 1\£011<.., l~~c. "o\ UNITED STATES NUCLEAR REGULATORY COMMISSION * | | {{#Wiki_filter::.V" 1\£011<.., |
| * o; WASHINGTON, D.C. 20555-0001 < ~* ",s.l') ,!' *it-*il ... January 25, 2018 LICENSEE: Entergy Operations, Inc. FACILITY: Waterford Steam Electric Station, Unit 3 SUBJECT: SUMMARY OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051) On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML 17318A123. A list of attendees at the meeting is also enclosed to this meeting summary. During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power. The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR), "Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing. The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to | | l~~c."o\ UNITED STATES |
| -2-test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights. The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays. The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received. Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov. Docket No. 50-382 Enclosure: List of Attendees cc: Listserv April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF A TIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC. REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure
| | ~ ~ NUCLEAR REGULATORY COMMISSION |
| -3 -SUBJECT: SUMMARY OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051 ), DATED JANUARY 25, 2018 DISTRIBUTION: PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsRgn4MailCenter Resource RidsNrrDorllp14 Resource RidsNrrPMWatertord Resource RidsNrrDssStsb Resource RidsNrrOeEicb Resource ADAMS Accession No.: ML1S005A099 OFFICE NRR/D0RULPL4/PM NRR/DORULPL4/LA NAME APuvirenti PBlechman DATE 01/16/18 01/08/18 RidsNrrLAPBlechman Resource GSingh, NRR MWaters, NRR PSnyder, NRR VCusumano, NRR TWertz, NRR JBowen, OEDO NRR/DORULPL4/BC NRR/DORULPL4/PM A Pascarelli APulvirenti 01/18/18 01/25/18 OFFICIAL RECORD COPY
| | *~ |
| }} | | * o; WASHINGTON, D.C. 20555-0001 |
| | <",s.l') ,!'~* |
| | *it-*il ... January 25, 2018 LICENSEE: Entergy Operations, Inc. |
| | FACILITY: Waterford Steam Electric Station, Unit 3 |
| | |
| | ==SUBJECT:== |
| | |
| | ==SUMMARY== |
| | OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051) |
| | On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML17318A123. A list of attendees at the meeting is also enclosed to this meeting summary. |
| | During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power. |
| | The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR), |
| | "Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing. |
| | The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to |
| | |
| | test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights. |
| | The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays. |
| | The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received. |
| | Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov. |
| | April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382 |
| | |
| | ==Enclosure:== |
| | |
| | List of Attendees cc: Listserv |
| | |
| | LIST OF ATIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC. |
| | REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure |
| | |
| | ML1S005A099 OFFICE NRR/D0RULPL4/PM NRR/DORULPL4/LA NRR/DORULPL4/BC NRR/DORULPL4/PM NAME APuvirenti PBlechman APascarelli APulvirenti DATE 01/16/18 01/08/18 01/18/18 01/25/18}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML17318A1232017-11-16016 November 2017 Licensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System Project stage: Meeting ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 Project stage: Meeting 2017-11-16
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 ML19247C3882019-09-10010 September 2019 Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18120A3112018-05-10010 May 2018 Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18059A0152018-03-0505 March 2018 Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17331A0882017-12-0606 December 2017 Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 ML17174B2262017-06-28028 June 2017 Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) ML16364A2902017-01-24024 January 2017 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit ML16323A2292017-01-24024 January 2017 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application ML16125A0832016-05-0404 May 2016 Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15117A5032015-05-0606 May 2015 April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report 2024-02-26
[Table view] |
Text
- .V" 1\£011<..,
l~~c."o\ UNITED STATES
~ ~ NUCLEAR REGULATORY COMMISSION
<",s.l') ,!'~*
- it-*il ... January 25, 2018 LICENSEE: Entergy Operations, Inc.
FACILITY: Waterford Steam Electric Station, Unit 3
SUBJECT:
SUMMARY
OF NOVEMBER 16, 2017, PUBLIC MEETING WITH ENTERGY OPERATIONS, INC. REGARDING PLANNED LICENSE AMENDMENT REQUEST TO REVISE THE WATERFORD STEAM ELECTRIC STATION, UNIT 3 TECHNICAL SPECIFICATION 3/4.3.2, TABLE 4.3-2 (EPID L-2017-LRM-0051)
On November 16, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Entergy Operation, Inc. (Entergy, the licensee). The purpose of the meeting was to discuss with NRC staff a planned license amendment request (LAR) to revise Technical Specification (TS) 3/4.3.2, Table 4.3-2, "Engineered Safety Features Actuation System Instrumentation [ESFAS] Surveillance Requirements," for Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated November 2, 2017, is available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17318A139. The licensee provided an initial slide presentation, which is available in ADAMS at Accession No. ML17318A123. A list of attendees at the meeting is also enclosed to this meeting summary.
During its presentation, the licensee stated that the current configurations of the main steam isolation signal (MSIS) and containment spray actuation signal (CSAS) relay circuits represent an adverse condition. Specifically, the circuit incorporates a single-point vulnerability such that if the circuit were to be tested at power, a single failure in the relay circuit may inadvertently actuate a spurious trip of the reactor. To reduce the potential for a spurious trip, the licensee was originally exempted from testing the circuit at power.
The licensee indicated that they plan to install a trip-hardening modification of the circuit, to be performed pursuant to Section 50.59 of Title 10 of the Code of Federal Regulations (10 CFR),
"Changes, tests, and experiments," that would alter the circuit logic from one-out-of-one logic to parallel-two-out-of-two logic. The modification would remove the single-point vulnerability adverse condition and allow the MSIS and CSAS circuits to be tested quarterly, at power, with a reduced probability of actuating a spurious trip during testing. The licensee demonstrated the operation of the planned parallel-two-out-of-two logic and the function of light-emitting-diode (LED) indicator lights to be utilized during testing.
The licensee also presented circuit diagrams of the proposed design of both MSIS and CSAS ESFAS systems. The licensee stated that the new configuration will comply with Regulatory Guide 1.22, "Periodic Testing of Protection System Actuation Functions" (ADAMS Accession No. ML083300530). The NRC staff asked how many new relays were to be added for the MSIS valve actuation; the licensee responded that three new relays would be added to the circuitry, for a total of six relays. The staff also inquired whether only one test button would be used to
test the function of the LED indicator lights before performing the relay test. The licensee confirmed that one button would be used to test all four indicator lights.
The licesee described how the planned LAR will request to revise Note 3 of TS Table 4.3-2 to remove the exemption from testing at power for the affected MSIS and CSAS relays, and provided the planned markup for the affected TS pages. The NRC staff requested that the LAR submittal include the current baseline frequency of the current surveillance for the affected relays.
The licensee stated that the planned LAR is scheduled to be submitted by early December 2017. No regulatory decisions were reached at this meeting. No member of the public provided comments to the NRC staff after the business portion of the meeting and, thus, no Public Meeting Feedback forms were received.
Please direct any inquiries to me at 301-415-1390, or at April.Pulvirenti@nrc.gov.
April L. Pulvirenti, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
List of Attendees cc: Listserv
LIST OF ATIEN DEES November 16. 2017, MEETING WITH ENTERGY OPERATIONS. INC.
REGARDING NEUTRON FLUENCE CALCULATION METHOD WATERFORD STEAM ELECTRIC STATION, UNIT 3 Entergy Operations, Inc Miguel Barreto John Jarrell Jason Laque Paul Stanton William Steelman Maria Zamber DP Engineering Robert Finkenaur U.S. Nuclear Regulatory Commission Gursharan Singh Pete Snyder Robert Pascarelli April Pulvirenti Public None Enclosure
ML1S005A099 OFFICE NRR/D0RULPL4/PM NRR/DORULPL4/LA NRR/DORULPL4/BC NRR/DORULPL4/PM NAME APuvirenti PBlechman APascarelli APulvirenti DATE 01/16/18 01/08/18 01/18/18 01/25/18