ML18051B231: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 01/03/1985
| issue date = 01/03/1985
| title = Forwards Suppl to Physics Testing Rept for Cycle 6 Startup. All Acceptance Criteria for All Power Distribution Parameters Met
| title = Forwards Suppl to Physics Testing Rept for Cycle 6 Startup. All Acceptance Criteria for All Power Distribution Parameters Met
| author name = JOHNSON B D
| author name = Johnson B
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name = KEPPLER J G
| addressee name = Keppler J
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| docket = 05000255
| docket = 05000255
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,. y consumers Power company General Offices: 212 West Mlchlgen Avenue, Jeckson, Ml 49201 * (617) .788-0660
{{#Wiki_filter:,.
* January 3, 1985 James G Keppler, Administrator Region III US Nuclear Regulatory Commission*
consumers Power company General Offices: 212 West Mlchlgen Avenue, Jeckson, Ml 49201 * (617) .788-0660
799 Roosevelt Road Glen Ellyn, IL 60137 .DOCKET 50-255 -LICENSE DPR-20 PALISADES PLANT -PHYSICS TESTiNG FOR PALISADES CYCLE q -. Start-up Supplement . . lE HQ F lLE oo.Pli. . . -. *consumers Power Company's submittal dated October 26, 1984 indicated that a supplemental physics report would be submitted for power distribution.
* January 3, 1985
after full power at Palisades.
                                                                                      . . lE HQ F lLE oo.Pli.
Attached to this letter is that supplemental report. The conclusions reached in the supplement were that all acceptance criterfa were met for all power distribution parameters for* Palisades Cycle 6 start-up.
                                                                                      .        .  -  .  ~j James G Keppler, Administrator Region III US Nuclear Regulatory Commission*
* Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector  
799 Roosevelt Road Glen Ellyn, IL 60137
-Palisades
    .DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - PHYSICS TESTiNG FOR PALISADES CYCLE q -
!
                                . Start-up Supplement
850103 1 p ADOCK 05000255 ''-o PDR _ OC1284-0305A-NL02 JAN 71985}}
    *consumers Power Company's submittal dated October 26, 1984 indicated that a supplemental physics report would be submitted for power distribution. after
      ~eaching full power at Palisades. Attached to this letter is that supplemental report. The conclusions reached in the supplement were that all acceptance criterfa were met for all power distribution parameters for*
Palisades Cycle 6 start-up.
* Brian D Johnson Staff Licensing Engineer CC   Administrator, Region III, USNRC NRC Resident Inspector - Palisades
(-~,;-;--;~~~~-~----
          !       ~5~1150353 850103 1       p     ADOCK 05000255
                          ''-o               PDR _ .~
JAN 71985 OC1284-0305A-NL02}}

Latest revision as of 20:51, 21 October 2019

Forwards Suppl to Physics Testing Rept for Cycle 6 Startup. All Acceptance Criteria for All Power Distribution Parameters Met
ML18051B231
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/03/1985
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML18051B232 List:
References
NUDOCS 8501150353
Download: ML18051B231 (1)


Text

,.

consumers Power company General Offices: 212 West Mlchlgen Avenue, Jeckson, Ml 49201 * (617) .788-0660

  • January 3, 1985

. . lE HQ F lLE oo.Pli.

. . - . ~j James G Keppler, Administrator Region III US Nuclear Regulatory Commission*

799 Roosevelt Road Glen Ellyn, IL 60137

.DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - PHYSICS TESTiNG FOR PALISADES CYCLE q -

. Start-up Supplement

  • consumers Power Company's submittal dated October 26, 1984 indicated that a supplemental physics report would be submitted for power distribution. after

~eaching full power at Palisades. Attached to this letter is that supplemental report. The conclusions reached in the supplement were that all acceptance criterfa were met for all power distribution parameters for*

Palisades Cycle 6 start-up.

  • Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades

(-~,;-;--;~~~~-~----

! ~5~1150353 850103 1 p ADOCK 05000255

-o PDR _ .~

JAN 71985 OC1284-0305A-NL02