ML18054B302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/15/1989
| issue date = 12/15/1989
| title = Describes Process to Implement Emergency Response Data Sys Link to NRC Operations Ctr.Procedures to Physically Activate Data Link Will Be Added to Present Critical Functions Monitoring Sys
| title = Describes Process to Implement Emergency Response Data Sys Link to NRC Operations Ctr.Procedures to Physically Activate Data Link Will Be Added to Present Critical Functions Monitoring Sys
| author name = FRISCH R R
| author name = Frisch R
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:consumers Power PDWERINli MICHlliAN'S PRDliRESS General Offices: 1945 West Parnall Road, Jackson,'MI 49201 * (517) 788-0550 December 15, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -EMERGENCY RESPONSE DATA LINK IMPLEMENTATION (TAC NO 73444) Programming for the Palisades Plant Emergency Response Data System (ERDS) data link is nearing completion.
{{#Wiki_filter:consumers Power PDWERINli MICHlliAN'S PRDliRESS General Offices: 1945 West Parnall Road, Jackson,'MI 49201 * (517) 788-0550 December 15, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
As such, Consumers Power Company proposes to implement the ERDS data link to the NRC Operations Center in the following manner: A) Data Link Activation (Alert classification and above) At the Alert classification and above, the ERDS data link will be activated by the plant upon the request of the NRC Operations Center. Activation can only be initiated from the Control Room. B) Data Link Activation Procedures Procedures to physically activate the data link will be added to the present Critical Functions Monitoring System (CFMS) operating instructions in Standard Operating Procedure 34 (SOP-34), "Datalogger System". The CFMS is the plant computer system used to establish the data link. The Palisades Plant's Emergency Implementing Procedures will be modified to reflect that the data link should be activated at the Alert classification and above, upon the request of the NRC Operations Center.. In addition., the Implementing Procedures will be modified to reference SOP-34 for the data link activation procedure.
EMERGENCY RESPONSE DATA LINK IMPLEMENTATION (TAC NO 73444)
C) Quarterly Data Link Tests The NRC is responsible for ensuring the quarterly data link tests with the Palisades Plant are completed, including coordination of the date and time of the test. The actual test will be initiated and terminated from the Palisades Control Room. It is expected the NRC
Programming for the Palisades Plant Emergency Response Data System (ERDS) data link is nearing completion. As such, Consumers Power Company proposes to implement the ERDS data link to the NRC Operations Center in the following manner:
.. e .,r Regulatory Commission Palisades Plant 2 Emergency Response Implementation December 15, 1989 will inform the plant prior to test initiation.
A)     Data Link Activation (Alert classification and above)
If a problem is discovered during the test, corrective actions to determine the cause of the problem and/or repair at the plant will be initiated and tracked through the plant's normal maintenance system. The NRC is responsible for troubleshooting and repairing NRC installed ERDS hardware at the Palisades Plant site and on to the NRC Operations Center. It is assumed the quarterly data link test will only verify a link can be established and that software verification will not be part of this test. Software verification is covered under the initial site ERDS data link acceptance tests and by the ERDS data link configuration management program described below. D) Data Link Software Configuration Management To assure the integrity of the ERDS data link software after the initial site acceptance tests, the Software Quality Assurance Plan established for the Critical Functions Monitoring System will be modified to require coordination with the NRC of any changes to CFMS software and/or data point library which impact the data link software.
At the Alert classification and above, the ERDS data link will be activated by the plant upon the request of the NRC Operations Center. Activation can only be initiated from the Control Room.
Changes to the data point library which impact the ERDS data link will be communicated to the NRC via the established data point library reference file form. Questions regarding our implementation plans may be directed to_Consumers Power Company, Corporate Emergency Planning Section at any time. l<"4'k L Ralph R Frisch Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector  
B)     Data Link Activation Procedures Procedures to physically activate the data link will be added to the present Critical Functions Monitoring System (CFMS) operating instructions in Standard Operating Procedure 34 (SOP-34), "Datalogger System". The CFMS is the plant computer system used to establish the data link.
-Palisades GGZech, Incidence Response Branch, NRC OC1289-0228-NL04}}
The Palisades Plant's Emergency Implementing Procedures will be modified to reflect that the data link should be activated at the Alert classification and above, upon the request of the NRC           2 Operations Center.. In addition., the Implementing Procedures will be modified to reference SOP-34 for the data link activation procedure.
C)     Quarterly Data Link Tests The NRC is responsible for ensuring the quarterly data link tests with the Palisades Plant are completed, including coordination of the date and time of the test. The actual test will be initiated and terminated from the Palisades Control Room. It is expected the NRC
 
  .                             e
.,r :t-:I~clear Regulatory Commission                                                 2 Palisades Plant Emergency Response Implementation December 15, 1989 will inform the plant prior to test initiation. If a problem is discovered during the test, corrective actions to determine the cause of the problem and/or repair at the plant will be initiated and tracked through the plant's normal maintenance system. The NRC is responsible for troubleshooting and repairing NRC installed ERDS hardware at the Palisades Plant site and on to the NRC Operations Center.
It is assumed the quarterly data link test will only verify a link can be established and that software verification will not be part of this test. Software verification is covered under the initial site ERDS data link acceptance tests and by the ERDS data link configuration management program described below.
D)   Data Link Software Configuration Management To assure the integrity of the ERDS data link software after the initial site acceptance tests, the Software Quality Assurance Plan established for the Critical Functions Monitoring System will be modified to require coordination with the NRC of any changes to CFMS software and/or data point library which impact the data link software.
Changes to the data point library which impact the ERDS data link will be communicated to the NRC via the established data point library reference file form.
Questions regarding our implementation plans may be directed to_Consumers Power Company, Corporate Emergency Planning Section at any time.
l<"4' k 1rl~
Ralph R Frisch L
Staff Licensing Engineer CC   Administrator, Region III, NRC NRC Resident Inspector - Palisades GGZech, Incidence Response Branch, NRC OC1289-0228-NL04}}

Latest revision as of 18:48, 21 October 2019

Describes Process to Implement Emergency Response Data Sys Link to NRC Operations Ctr.Procedures to Physically Activate Data Link Will Be Added to Present Critical Functions Monitoring Sys
ML18054B302
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/15/1989
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-73444, NUDOCS 8912190320
Download: ML18054B302 (2)


Text

consumers Power PDWERINli MICHlliAN'S PRDliRESS General Offices: 1945 West Parnall Road, Jackson,'MI 49201 * (517) 788-0550 December 15, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

EMERGENCY RESPONSE DATA LINK IMPLEMENTATION (TAC NO 73444)

Programming for the Palisades Plant Emergency Response Data System (ERDS) data link is nearing completion. As such, Consumers Power Company proposes to implement the ERDS data link to the NRC Operations Center in the following manner:

A) Data Link Activation (Alert classification and above)

At the Alert classification and above, the ERDS data link will be activated by the plant upon the request of the NRC Operations Center. Activation can only be initiated from the Control Room.

B) Data Link Activation Procedures Procedures to physically activate the data link will be added to the present Critical Functions Monitoring System (CFMS) operating instructions in Standard Operating Procedure 34 (SOP-34), "Datalogger System". The CFMS is the plant computer system used to establish the data link.

The Palisades Plant's Emergency Implementing Procedures will be modified to reflect that the data link should be activated at the Alert classification and above, upon the request of the NRC 2 Operations Center.. In addition., the Implementing Procedures will be modified to reference SOP-34 for the data link activation procedure.

C) Quarterly Data Link Tests The NRC is responsible for ensuring the quarterly data link tests with the Palisades Plant are completed, including coordination of the date and time of the test. The actual test will be initiated and terminated from the Palisades Control Room. It is expected the NRC

. e

.,r :t-:I~clear Regulatory Commission 2 Palisades Plant Emergency Response Implementation December 15, 1989 will inform the plant prior to test initiation. If a problem is discovered during the test, corrective actions to determine the cause of the problem and/or repair at the plant will be initiated and tracked through the plant's normal maintenance system. The NRC is responsible for troubleshooting and repairing NRC installed ERDS hardware at the Palisades Plant site and on to the NRC Operations Center.

It is assumed the quarterly data link test will only verify a link can be established and that software verification will not be part of this test. Software verification is covered under the initial site ERDS data link acceptance tests and by the ERDS data link configuration management program described below.

D) Data Link Software Configuration Management To assure the integrity of the ERDS data link software after the initial site acceptance tests, the Software Quality Assurance Plan established for the Critical Functions Monitoring System will be modified to require coordination with the NRC of any changes to CFMS software and/or data point library which impact the data link software.

Changes to the data point library which impact the ERDS data link will be communicated to the NRC via the established data point library reference file form.

Questions regarding our implementation plans may be directed to_Consumers Power Company, Corporate Emergency Planning Section at any time.

l<"4' k 1rl~

Ralph R Frisch L

Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspector - Palisades GGZech, Incidence Response Branch, NRC OC1289-0228-NL04