{{#Wiki_filter:* ATTACHMENT 3 Consumers Power Company Palisades Plant Docket 50-255  
{{#Wiki_filter:ATTACHMENT 3 Consumers Power Company Palisades Plant Docket 50-255


==SUMMARY==
==SUMMARY==
OF CHANGES TO PLANT PROCEDURE EM-09-04 "INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS June 28, 1991 1 Page
OF CHANGES TO PLANT PROCEDURE EM-09-04 "INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS June 28, 1991 1 Page
*
* ATTACHMENT 3 INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS REVISION  
* ATTACHMENT 3 INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS REVISION  


==SUMMARY==
==SUMMARY==
The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following:
The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following:
I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development.
I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development.
: 2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements.
: 2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements.
: 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits. 4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function.
: 3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits.
: 4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function.
: 5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter.
: 5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter.
I Page}}
I Page}}

Revision as of 19:31, 21 October 2019

Rev 15 to EM-09-04, Inservice Testing of Selected Safety- Related Pumps, Reflecting Complete Rewrite of Procedure to Omit Vertical Lines
ML18057B022
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/10/1991
From: Oroz R, Schrader G, Toner K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18057B020 List:
References
EM-09-04, EM-9-4, NUDOCS 9107120204
Download: ML18057B022 (2)


Text

ATTACHMENT 3 Consumers Power Company Palisades Plant Docket 50-255

SUMMARY

OF CHANGES TO PLANT PROCEDURE EM-09-04 "INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS June 28, 1991 1 Page

  • ATTACHMENT 3 INSERVICE TESTING OF SELECTED SAFETY-RELATED PUMPS REVISION

SUMMARY

The changes made to pump testing procedure EM-09-04 included various editorial changes, as well as the following:

I. The pump hydraulic test circuits for all pumps tested were added to the procedure to aid in IST program development.

2. All but four Relief Requests in Attachment 3 of EM-09-04 were deleted due to modifications being implemented in the fall 1990 outage to enhance pump parameter measurements.
3. Attachment 2 Table 2 of EM-09-04 "Allowable Ranges of Test Quantities" was revised to reflect ASME Section. XI IWP rather than OM-6 limits.
4. Basis Statements for all pumps in the IST Program were added to the procedure to provide a quick reference for pump function.
5. Tables for each pump were added to the procedure delineating the parameters tested, and if applicable, the reference value and instrument number that measures the hydraulic parameter.