ML18152B416: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/30/1999
| issue date = 04/30/1999
| title = Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr
| title = Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr
| author name = ASHLEY J S, GRECHECK E S, PINCUS J R, STIEF R
| author name = Ashley J, Grecheck E, Pincus J, Stief R
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:<* e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 12, 1999 United States Nuclear Regulatory Commission Attention:
{{#Wiki_filter:<*                           e                                     e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 12, 1999 United States Nuclear Regulatory Commission                       Serial No. 99-275 Attention: Document Control Desk                                 SPSUc/JSA RO Washington, D.C. 20555                                           Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
Document Control Desk Washington, D.C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of April 1999 is provided in the attachment.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Serial No. SPSUc/JSA Docket Nos. License Nos. 99-275 RO 50-280 50-281 DPR-32 DPR-37 The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of April 1999 is provided in the attachment.
If you have any questions or require additional information, please contact us.
If you have any questions or require additional information, please contact us. Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W. Suite 23T8.5 Atlanta, Georgia 30303 . --, , (\ (~ A -\ (') i.. .. i \) \....,,t *-Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station r 9905180312 990430 PDR ADOCK 05000280 R PDR
Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc:   U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.
,, e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-04 Approved:  
Suite 23T8.5 Atlanta, Georgia 30303 . -- , , (\ (~ A
~/bate TABLE OF CONTENTS Section e Surry Monthly Operating Report No. 99-04 Page 2 of 18 Page Operating Data Report -Unit No. 1 ............................................................................................................................
                                        -\ (') i.. . i \) \....,,t *-
3 Operating Data Report -Unit No. 2 ...........................................................................................................................  
Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station r   9905180312 990430 PDR ADOCK 05000280 R                   PDR
.4 Unit Shutdowns and Power Reductions  
 
-Unit.No. 1 ..................................................................................................
,,     e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-04 Approved:
5 Unit Shutdowns and Power Reductions  
                                      ~/bate
-Unit No. 2 ..................................................................................................
 
6 Average Daily Unit Power Level -Unit No. 1 ..............................................................................................................
e       Surry Monthly Operating Report No. 99-04 Page 2 of 18 TABLE OF CONTENTS Section                                                                                                                                                          Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit.No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 1O Procedure or Method of Operation Changes That Did Not Require NRC Approval ................................................. 12 Tests and Experiments That Did Not Require NRC Approval. ................................................................................. 15 Chemistry Report ..................................................................................................................................................... 16 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 17 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18
7 Average Daily Unit Power Level -Unit No. 2 ..............................................................................................................
 
8 Summary of Operating Experience  
e    Surry Monthly Operating Report No. 99-04 Page3of18 OPERATING DATA REPORT Docket No.:   50-280 Date:  05/02/99 Completed By:  R. Stief Telephone:  (757) 365-2486
-Unit Nos. 1 and 2 .............................................................................................
: 1. Unit Name: .......................................................... . Surry Unit 1
9 Facility Changes That Did Not Require NRC Approval ............................................................................................
: 2. Reporting Period: ................................................ . April 1999
1 O Procedure or Method of Operation Changes That Did Not Require NRC Approval .................................................
: 3. Licensed Thermal Power (MWt): ........................ ..                  2546
12 Tests and Experiments That Did Not Require NRC Approval.  
: 4. Nameplate Rating (Gross MWe): ....................... ..                      847.5
.................................................................................
: 5. Design Electrical Rating (Net MWe): ................... .                    788
15 Chemistry Report .....................................................................................................................................................
: 6. Maximum Dependable Capacity (Gross MWe): .. .                                840
16 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................
: 7. Maximum Dependable Capacity (Net MWe): ...... .                               801
17 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications  
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
.......................................................................................................................
: 9. Power Level To Which Restricted, If Any (Net MWe):
18 
: 10. Reasons For Restrictions, If Any:
: 1. 2. 3. 4. 5. 6. 7. OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-04 Page3of18 Docket No.: Date: Completed By: 50-280 05/02/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ........................  
This Month     Year-To-Date         Cumulative
.. Nameplate Rating (Gross MWe): .......................  
: 11. Hours in Reporting Period                                                             719.0           2879.0         231023.0
.. Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 1 April 1999 2546 847.5 788 840 801 Telephone:  
: 12. Hours Reactor Was Critical                                                           719.0           2879.0         164195.5
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date Cumulative  
: 13. Reactor Reserve Shutdown Hours                                                         0.0               0.0           3774.5
: 11. Hours in Reporting Period 719.0 2879.0 231023.0 12. Hours Reactor Was Critical 719.0 2879.0 164195.5 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 14. Hours Generator On-Line 719.0 2879.0 161650.4 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 16. Gross Thermal Energy Generated (MWH) 1830309.2 7327775.1 381518732.6  
: 14. Hours Generator On-Line                                                               719.0           2879.0         161650.4
: 17. Gross Electrical Energy Generated (MWH) 608715.0 2439592.0 1252097 48.0 18. Net Electrical Energy Generated (MWH) 587357.0 2357081.0 119343685.0  
: 15. Unit Reserve Shutdown Hours                                                             0.0               0.0           3736.2
: 19. Unit Service Factor 100.0% 100.0% 70.0% 20. Unit Availability Factor 100.0% 100.0% 71.6% 21. Unit Capacity Factor (Using MDC Net) 102.0% 102.2% 66.3% 22. Unit Capacity Factor (Using DER Net) 103.7% 103.9% 65.6% 23. Unit Forced Outage Rate 0.0% 0.0% 14.2% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up:  
: 16. Gross Thermal Energy Generated (MWH)                                             1830309.2       7327775.1       381518732.6
: 17. Gross Electrical Energy Generated (MWH)                                           608715.0       2439592.0       125209748.0
: 18. Net Electrical Energy Generated (MWH)                                             587357.0       2357081.0       119343685.0
: 19. Unit Service Factor                                                                 100.0%           100.0%               70.0%
: 20. Unit Availability Factor                                                           100.0%           100.0%               71.6%
: 21. Unit Capacity Factor (Using MDC Net)                                               102.0%           102.2%               66.3%
: 22. Unit Capacity Factor (Using DER Net)                                               103.7%           103.9%               65.6%
: 23. Unit Forced Outage Rate                                                               0.0%               0.0%             14.2%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED 
FORECAST              ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 1. 2. 3. 4. 5. 6. 7. e OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-04 Page 4 of 18 Docket No.: Date: Completed By: 50-281 05/02/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ......................... . Nameplate Rating (Gross MWe): ........................ . Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 2 April 1999 2546 847.5 788 840 801 Telephone:  
 
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date  
e                                                             e   Surry Monthly Operating Report No. 99-04 Page 4 of 18 OPERATING DATA REPORT Docket No.:   50-281 Date:  05/02/99 Completed By:  R. Stief Telephone:  (757) 365-2486
: 11. Hours in Reporting Period 719.0 2879.0 12. Hours Reactor Was Critical 408.1 2568.1 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 407.9 2567.9 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 735692.0 5937292.3  
: 1. Unit Name: .......................................................... . Surry Unit 2
: 17. Gross Electrical Energy Generated (MWH) 248985.0 1999520.0  
: 2. Reporting Period: ................................................ . April 1999
: 18. Net Electrical Energy Generated (MWH) 238011.0 1927753.0  
: 3. Licensed Thermal Power (MWt): ......................... .                  2546
: 19. Unit Service Factor 56.7% 89.2% 20. Unit Availability Factor 56.7% 89.2% 21. Unit Capacity Factor (Using MDC Net) 41.3% 83.6% 22. Unit Capacity Factor (Using DER Net) 42.0% 85.0% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up:  
: 4. Nameplate Rating (Gross MWe): ........................ .                      847.5
: 5. Design Electrical Rating (Net MWe): ................... .                    788
: 6. Maximum Dependable Capacity (Gross MWe): .. .                                840
: 7. Maximum Dependable Capacity (Net MWe): ...... .                               801
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month       Year-To-Date         Cumulative
: 11. Hours in Reporting Period                                                             719.0             2879.0           227904.0
: 12. Hours Reactor Was Critical                                                           408.1             2568.1           162478.4
: 13. Reactor Reserve Shutdown Hours                                                         0.0                 0.0             328.1
: 14. Hours Generator On-Line                                                               407.9             2567.9           160461.4
: 15. Unit Reserve Shutdown Hours                                                             0.0                 0.0               0.0
: 16. Gross Thermal Energy Generated (MWH)                                               735692.0           5937292.3      379732941 .3
: 17. Gross Electrical Energy Generated (MWH)                                           248985.0           1999520.0      124547413.0
: 18. Net Electrical Energy Generated (MWH)                                             238011.0           1927753.0      118749780.0
: 19. Unit Service Factor                                                                 56.7%               89.2%               70.4%
: 20. Unit Availability Factor                                                             56.7%               89.2%             70.4%
: 21. Unit Capacity Factor (Using MDC Net)                                                 41.3%               83.6%               66.6%
: 22. Unit Capacity Factor (Using DER Net)                                                 42.0%               85.0%               66.1%
: 23. Unit Forced Outage Rate                                                               0.0%                 0.0%             11.2%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED Cumulative 227904.0 162478.4 328.1 160461.4 0.0 379732941
FORECAST              ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.3 124547413.0 1187 49780.0 70.4% 70.4% 66.6% 66.1% 11.2%
 
e Surry Monthly Operating Report No. 99-04 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: April 1999 None during the Reporting Period (2) REASON: A Equipment Failure (Explain)
e   Surry Monthly Operating Report No. 99-04 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
REPORT MONTH: April 1999 Docket No.:   50-280 Unit Name:   Surry Unit 1 Date: 05/04/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 None during the Reporting Period (1)                          (2)                                                (3)
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 05/04/99 Completed by: J. R. Pincus Telephone:  
F:  Forced                  REASON:                                          METHOD:
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)  
S:  Scheduled              A    Equipment Failure (Explain)                1 - Manual B    Maintenance or Test                        2 - Manual Scram C    Refueling                                  3 - Automatic Scram D    Regulatory Restriction                      4 - Other (Explain)
(5) Exhibit 1 -Same Source (1) Date Type 04/18/99 s (1) F: Forced S: Scheduled (4) (2) e Surry Monthly Operating Report No. 99-04 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) REPORT MONTH: April 1999 (3) (4) Method Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 05/04/99 Completed by: J. R. Pincus Telephone:  
E    Operator Training & Licensing Examination F    Administrative G    Operational Error (Explain)
(757) 365-2863 (5) Duration of LER No. System Component Cause & Corrective Action Hours 311.1 Reason C (2) REASON: Shutting Down Rx 1 N/A A -Equipment Failure (Explain)
(4)                                                                              (5)
B Maintenance or Test C Refueling D Regulatory Restriction Code N/A E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets                  Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
Code to Prevent Recurrence N/A (3) METHOD: Refueling Outage 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)  
 
(5) Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Exhibit 1 -Same Source MONTH: April 1999 Day 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e Surry Monthly Operating Report No. 99-04 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (MWe -Net) Day 819 17 820 18 820 19 785 20 819 21 819 22 820 23 819 24 822 25 818 26 818 27 818 28 815 29 817 30 818 817 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 05/02/99 Completed by: J. S. Ashley Telephone:  
e   Surry Monthly Operating Report No. 99-04 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN   20%)
(757) 365-2161 Average Daily Power Level (Mwe -Net) 817 805 810 812 815 816 816 819 816 817 816 817 818 818 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
REPORT MONTH: April 1999 Docket No.:   50-281 Unit Name:   Surry Unit 2 Date: 05/04/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 (1)                  (2)        (3)                  (4)        (5)
MONTH: April 1999 Day 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e Surry Monthly Operating Report No. 99-04 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (Mwe -Net) Day 628 17 623 18 616 19 585 20 606 21 599 22 595 23 589 24 581 25 581 26 579 27 573 28 568 29 565 30 558 554 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 05/02/99 Completed by: J. S. Ashley Telephone:  
Method Duration                 of     LER No. System   Component     Cause & Corrective Action Date      Type    Hours     Reason    Shutting              Code        Code        to Prevent Recurrence Down Rx 04/18/99      s      311.1         C         1        N/A      N/A        N/A            Refueling Outage (1)                            (2)                                                 (3)
(757) 365-2161 Average Daily Power Level (Mwe -Net) 515 2 0 0 0 0 0 0 0 0 0 0 0 0 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
F:  Forced                  REASON:                                             METHOD:
I _j e  
S:  Scheduled              A - Equipment Failure (Explain)                     1 - Manual B     Maintenance or Test                           2 - Manual Scram C     Refueling                                     3 - Automatic Scram D     Regulatory Restriction                       4 - Other (Explain)
E     Operator Training & Licensing Examination F     Administrative G     Operational Error (Explain)
(4)                                                                                 (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                     Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
 
e     Surry Monthly Operating Report No. 99-04 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-280 Unit Name:   Surry Unit 1 Date: 05/02/99 Completed by:   J. S. Ashley Telephone:   (757) 365-2161 MONTH:      April 1999 Average Daily Power Level                         Average Daily Power Level Day                  (MWe - Net)                Day                  (Mwe - Net) 819                    17                      817 2                        820                    18                      805 3                        820                    19                      810 4                        785                    20                      812 5                        819                    21                      815 6                        819                    22                      816 7                        820                    23                      816 8                        819                     24                      819 9                        822                    25                      816 10                        818                    26                      817 11                        818                    27                      816 12                        818                    28                        817 13                        815                    29                      818 14                        817                     30                      818 15                        818 16                        817 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e     Surry Monthly Operating Report No. 99-04 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-281 Unit Name:   Surry Unit 2 Date:   05/02/99 Completed by:     J. S. Ashley Telephone:   (757) 365-2161 MONTH:    April 1999 Average Daily Power Level                      Average Daily Power Level Day                  (Mwe - Net)                Day                  (Mwe - Net) 628                      17                      515 2                       623                      18                      2 3                      616                      19                      0 4                      585                    20                        0 5                      606                    21                        0 6                      599                    22                        0 7                      595                      23                      0 8                      589                    24                        0 9                      581                    25                        0 10                      581                    26                        0 11                      579                    27                        0 12                      573                      28                      0 13                      568                    29                        0 14                      565                    30                        0 15                      558 16                      554 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
I
_j
 
e                                            e     Surry Monthly Operating Report No. 99-04 Page 9 of 18


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE MONTHNEAR:
OF OPERATING EXPERIENCE MONTHNEAR:   April 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
April 1999 e Surry Monthly Operating Report No. 99-04 Page 9 of 18 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
UNIT ONE: 04/01/99 04/20/99 04/20/99 04/20/99 04/20/99 04/30/99 UNIT Two: 04/01/99 04/18/99 04/18/99 04/30/99 0000 1044 1110 1255 1434 2400 0000 0052 0103 2400 Unit starts the month at 100% / 850 MWe. Commence unit ramp down to swap HP heater drain pump. Unit at 100% / 850 MWe. Stopped ramp. Unit at 98% / 830 MWe. Commenced ramp up. Unit at 98% / 830 MWe. Unit at 100% / 850 MWe. Unit finished the month at 100% / 850 MWe. Unit started the month at 76% / 660 MWe. (coast-down continues)
04/01/99     0000         Unit starts the month at 100% / 850 MWe.
Turbine tripped for Refueling Outage. Reactor tripped for Refueling Outage. Unit finished the month at 0% / 0 MWe.
04/20/99      1044          Commence unit ramp down to swap HP heater drain pump. Unit at 100% / 850 MWe.
FS 99-002 SE 99-026 DCP 98-092 TM S1-99-004 TM S1 003 TM S1-99-005 e e Surry Monthly Operating Report No. 99-04 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
04/20/99      1110          Stopped ramp. Unit at 98% / 830 MWe.
April 1999 UFSAR Change Request (Safety Evaluation 99-022) 04/08/99 As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS 99-002 contains corrections and clarifications to the UFSAR sections that discuss Surry's radiation monitoring system. These changes are to enhance accuracy and do not affect any radiation monitoring system or structure, or any of its component's operation or performance.
04/20/99      1255          Commenced ramp up. Unit at 98% / 830 MWe.
Safety Evaluation 04/13/99 Safety Evaluation 99-026 evaluates the 1999 Unit 2 Refueling Outage against current industry guidelines and Virginia power administrative requirements for shutdown risk management including NUMARC 91-06 and NE Technical Report 865, Rev. 3. The schedule provides a plan for safely and efficiently accomplishing refueling, maintenance, modification, and testing activities.
04/20/99      1434          Unit at 100% / 850 MWe.
Design Change Package (Safety Evaluation 99-029) 04/15/99 Design Change Package 98-092, "Reactor Protection Test Logic Surge Suppressors/Surry/1  
04/30/99    2400          Unit finished the month at 100% / 850 MWe.
&2", installed surge suppressors on certain Reactor Protection Logic test relays to prevent noise spiking during the performance of the monthly Reactor Protection Test. Temporary Modification (Safety Evaluation 99-033) 04/18/99 Air compressor 1-SA-C-3 is leaking air and is unable to supply air to the Laundry Facility.
UNIT Two:
04/01/99      0000          Unit started the month at 76% / 660 MWe. (coast-down continues) 04/18/99      0052          Turbine tripped for Refueling Outage.
04/18/99    0103          Reactor tripped for Refueling Outage.
04/30/99    2400          Unit finished the month at 0% / 0 MWe.
 
e                                             e   Surry Monthly Operating Report No. 99-04 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 FS 99-002    UFSAR Change Request                                                           04/08/99 (Safety Evaluation 99-022)
As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS 99-002 contains corrections and clarifications to the UFSAR sections that discuss Surry's radiation monitoring system. These changes are to enhance accuracy and do not affect any radiation monitoring system or structure, or any of its component's operation or performance.
SE 99-026    Safety Evaluation                                                             04/13/99 Safety Evaluation 99-026 evaluates the 1999 Unit 2 Refueling Outage against current industry guidelines and Virginia power administrative requirements for shutdown risk management including NUMARC 91-06 and NE Technical Report 865, Rev. 3. The schedule provides a plan for safely and efficiently accomplishing refueling, maintenance, modification, and testing activities.
DCP 98-092    Design Change Package                                                         04/15/99 (Safety Evaluation 99-029)
Design     Change     Package     98-092, "Reactor   Protection   Test   Logic   Surge Suppressors/Surry/1 &2", installed surge suppressors on certain Reactor Protection Logic test relays to prevent noise spiking during the performance of the monthly Reactor Protection Test.
TM S1-99-004  Temporary Modification                                                         04/18/99 (Safety Evaluation 99-033)
Air compressor 1-SA-C-3 is leaking air and is unable to supply air to the Laundry Facility.
Temporary Modification S1-99-004 installed a temporary compressor to supply reliable air to the Laundry Facility.
Temporary Modification S1-99-004 installed a temporary compressor to supply reliable air to the Laundry Facility.
Temporary Modification (Safety Evaluation 99-034) 04/22/99 Temporary Modification S1-99-003 evaluates the use of three fire hose stations to supply the sprinkler systems in temporary trailers in the Turbine Building to support the Unit 2 Refueling Outage. Temporary Modification (Safety Evaluation 99-035) 04/23/99 Temporary Modification S1-99-005 installed a temporary Non-Safety Passive Autocatalytic Recombiner in Unit 1 Containment to maintain the containment Hydrogen concentration less than the design basis limit of 0.8%.
TM S1 003 Temporary Modification                                                         04/22/99 (Safety Evaluation 99-034)
DCP 99-035 ET S-99-079 e Surry Monthly Operating Report No. 99-04 Page 11 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
Temporary Modification S1-99-003 evaluates the use of three fire hose stations to supply the sprinkler systems in temporary trailers in the Turbine Building to support the Unit 2 Refueling Outage.
April 1999 Design Change Package (Safety Evaluation 99-036) 04/27/99 Design Change Package 99-035, "Fuel Assembly Repair'', removes fuel assembly top nozzles containing defective parts and replaces them with new, functionally equivalent, top nozzles. Engineering Transmittal (Safety Evaluation 99-038) 04/29/99 Engineering Transmittal S-99-079, "Alternate Packing Material for 2-RC-77", accepts the previous 1996 injected packing of valve 2-RC-77 as a permanent repair since the packing has not leaked over the past two cycles.
TM S1-99-005  Temporary Modification                                                         04/23/99 (Safety Evaluation 99-035)
1/2-AP-4.00 O-MOP-GW-001 O-MOP-GW-002 OP-23.2.11 OP-23.2.12 1 /2-0SP-FW-004 O-MCM-0125-01 O-ECM-2503-03 e Surry Monthly Operating Report No. 99-04 Page 12 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
Temporary Modification S1-99-005 installed a temporary Non-Safety Passive Autocatalytic Recombiner in Unit 1 Containment to maintain the containment Hydrogen concentration less than the design basis limit of 0.8%.
April 1999 Abnormal Procedures 04/16/99 (Safety Evaluation 97-008, Rev. 1) Abnormal Procedures 1/2-AP-4.00, "Nuclear Instrumentation Malfunction", were changed to allow entry into containment without audible count rate available.
 
Revision 1 added that if the count rate increases by 1h decade over its previous reading, or an increasing trend in the count rate is observed, personnel must be evacuated from containment.
e   Surry Monthly Operating Report No. 99-04 Page 11 of 18 FACILITY CHANGES THAT   DID NOT REQUIRE NRC   APPROVAL MONTHNEAR:   April 1999 DCP 99-035  Design Change Package                                                         04/27/99 (Safety Evaluation 99-036)
Maintenance Operating Procedures (Safety Evaluation 98-064, Rev. 1) 04/07/99 Maintenance Operating Procedures O-MOP-GW-001, "Purging the Outer Tank for 1-GW-TK-1A", and O-MOP-GW-002, "Purging the Outer Tank for 1-GW-TK-1 B", were revised to provide a Temporary Modification to purge and sample the outer Waste Gas Decay Tank for maintenance.
Design Change Package 99-035, "Fuel Assembly Repair'', removes fuel assembly top nozzles containing defective parts and replaces them with new, functionally equivalent, top nozzles.
Revision 1 added procedure O-MOP-GW-002 for tank 1 B. Operating Procedures (Safety Evaluation 99-020) 04/06/99 Operating Procedures OP-23.2.11, "Sampling Alignment for WGDT 1 A", and OP-23.2.12, "Sampling Alignment for WGDT 1 B", were revised to provide a Temporary Modification to install tubing between the sample outlet for the outer Waste Gas Decay Tank (WGDT) to the local sample panel used to sample the inner WGDT. Operations Surveillance Procedures (Safety Evaluation 99-023) 04/08/99 Operations Surveillance Procedures 1/2-0SP-FW-004, "Unit 1 and Unit 2 AFW and AFW Cross-tie ISi Test", were written to perform the ASME Section XI pressure testing in the AFW cross-tie line. The procedures will control the removal of the seal-in contacts on several Auxiliary Feedwater (AFW) motor operated valves to allow throttling capability.
ET S-99-079 Engineering Transmittal                                                       04/29/99 (Safety Evaluation 99-038)
Mechanical Corrective Maintenance Procedure (Safety Evaluation 99-024) 04/12/99 Mechanical Corrective Maintenance Procedure O-MCM-0125-01, "Main Condensate Pump Maintenance", was revised to provide a Temporary Modification to temporarily remove and re-install a section of fire protection piping which interferes with the removal of the condensate pumps/motors during maintenance.
Engineering Transmittal S-99-079, "Alternate Packing Material for 2-RC-77", accepts the previous 1996 injected packing of valve 2-RC-77 as a permanent repair since the packing has not leaked over the past two cycles.
Electrical Corrective Maintenance Procedure (Safety Evaluation 99-025) 04/13/99 Electrical Corrective Maintenance Procedure O-ECM-2503-03, "Main Generator Hydrogen System Maintenance", was revised to provide a Temporary Modification to install a temporary pressure gauge in the main generator hydrogen gas system to perform a system leak check.
 
1 /2-0P-RC-002 2-0P-RC-011 2-MOP-DG-002 2-MOP-EP-401 2-MOP-EP-402 O-MCM-1410-04 O-MCM-1420-02 e e Surry Monthly Operating Report No. 99-04 Page 13 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
e    Surry Monthly Operating Report No. 99-04 Page 12 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE  NRC APPROVAL MONTHNEAR:    April 1999 1/2-AP-4.00    Abnormal Procedures                                                            04/16/99 (Safety Evaluation 97-008, Rev. 1)
April 1999 Operating Procedures (Safety Evaluation 99-027) 04/13/99 Operating Procedures 1/2-0P-RC-002, "Reactor Coolant System Fill", were (Unit 2)/will be (Unit 1) revised to remove the Motor Operated Valve seal-in circuit to allow electrically "bumping" open the Loop Stop Valves from the Main Control Room when filling a drained Reactor Coolant loop. This activity will minimize the time and dose required to manually place the valve at zero deflection inside containment.
Abnormal Procedures 1/2-AP-4.00, "Nuclear Instrumentation Malfunction", were changed to allow entry into containment without audible count rate available. Revision 1 added that if the count rate increases by 1h decade over its previous reading, or an increasing trend in the count rate is observed, personnel must be evacuated from containment.
Operating Procedure (Safety Evaluation 99-028) 04/13/99 Operating Procedure 2-0P-RC-011, "Pressurizer Relief Tank Operations", was revised to provide an alternate vent path for degassing the Unit 2 Pressurizer Relief Tank (PRT) to the Overhead Gas System through the PRT vapor space sample line when gaseous activity levels are high. Maintenance Operating Procedure (Safety Evaluation 99-030) 04/15/99 Maintenance Operating Procedure 2-MOP-DG-002, "Removal and Return to Service of the PDTI Inlet PCV", was written to maintain pressure control valve (PCV) 2-DG-PCV-200 in the open position during Cold Shutdown or Refueling Shutdown in order to provide a flow path for Reactor Coolant System loop drains and other drains to the Primary Drain Transfer Tank (PDTI). Maintenance Operating Procedures (Safety Evaluation 99-031) 04/15/99 Maintenance Operating Procedures 2-MOP-EP-401, "Unit 2 Generator Tagout", and 2-MOP-EP-402, "Return to Service of Unit 2 Main Generator", were revised to provide a Procedurally Controlled Temporary Modification to bypass the fire detection alarm to the Low Pressure CO2 Fire Suppression system for the turbine and generator tagged out during the Refueling Outage. Mechanical Corrective Maintenance Procedures (Safety Evaluation 99-032) 04/15/99 Mechanical Corrective Maintenance Procedures O-MCM-1410-04, "Turbine Pedestal Maintenance", and O-MCM-1420-02, "Low Pressure Turbine Maintenance", were revised to provide a Procedurally Controlled Temporary Modification to bypass the bearing lift oil pressure anti-start interlock in the main turbine Turning Gear motor circuitry to allow periodic rotation of the turbine rotor using the turning gear.
O-MOP-GW-001    Maintenance Operating Procedures                                               04/07/99 O-MOP-GW-002    (Safety Evaluation 98-064, Rev. 1)
FP-VPA-FR1
Maintenance Operating Procedures O-MOP-GW-001, "Purging the Outer Tank for 1-GW-TK-1A", and O-MOP-GW-002, "Purging the Outer Tank for 1-GW-TK-1 B", were revised to provide a Temporary Modification to purge and sample the outer Waste Gas Decay Tank for maintenance. Revision 1 added procedure O-MOP-GW-002 for tank 1B.
.0.1999 SE 99-039 e Surry Monthly Operating Report No. 99-04 Page 14 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
OP-23.2.11    Operating Procedures                                                             04/06/99 OP-23.2.12      (Safety Evaluation 99-020)
April 1999 Vendor Procedure (Safety Evaluation 99-037) 04/27/99 Vendor Procedure, FP-VPA-FR1
Operating Procedures OP-23.2.11, "Sampling Alignment for WGDT 1A", and OP-23.2.12, "Sampling Alignment for WGDT 1B", were revised to provide a Temporary Modification to install tubing between the sample outlet for the outer Waste Gas Decay Tank (WGDT) to the local sample panel used to sample the inner WGDT.
.0.1999, "Fuel Repair for Surry Unit 1 and Unit 2", provides instructions for the installation and removal of equipment required for fuel repairs as well as for the actual fuel repairs including removal and reattachment of the fuel assembly top nozzle. To perform the repairs, the temporary replacement of the new fuel elevator basket with a Westinghouse basket will be performed via a Procedurally Controlled Temporary Modification.
1/2-0SP-FW-004 Operations Surveillance Procedures                                              04/08/99 (Safety Evaluation 99-023)
Safety Evaluation 04/29/99 Safety Evaluation 99-039 evaluates the "Safety Monitor", which is a program that will perform on-line risk calculations to support compliance with 10 CFR 50.65 (the Maintenance Rule).
Operations Surveillance Procedures 1/2-0SP-FW-004, "Unit 1 and Unit 2 AFW and AFW Cross-tie ISi Test", were written to perform the ASME Section XI pressure testing in the AFW cross-tie line. The procedures will control the removal of the seal-in contacts on several Auxiliary Feedwater (AFW) motor operated valves to allow throttling capability.
tlturry Monthly Operating Report No. 99-04 Page15of18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
O-MCM-0125-01  Mechanical Corrective Maintenance Procedure                                     04/12/99 (Safety Evaluation 99-024)
April 1999 None during the Reporting Period 
Mechanical Corrective Maintenance Procedure O-MCM-0125-01, "Main Condensate Pump Maintenance", was revised to provide a Temporary Modification to temporarily remove and re-install a section of fire protection piping which interferes with the removal of the condensate pumps/motors during maintenance.
.. e CHEMISTRY REPORT MONTHNEAR:
O-ECM-2503-03  Electrical Corrective Maintenance Procedure                                     04/13/99 (Safety Evaluation 99-025)
April 1999 Unit No. 1 Primary Coolant Analysis Max. Min. AvQ. Gross Radioactivity, &#xb5;Ci/ml 3.34E-1 2.28E-1 2.93E-1 Suspended Solids, oom ---Gross Tritium, &#xb5;Ci/ml 9.43E-1 8.38E-1 8.99E-1 1131, &#xb5;Ci/ml 4.24E-4 2.16E-4 3.39E-4 113111133 0.08 0.04 0.07 Hvdroqen, cc/kq 40.4 37 39.1 Lithium, oom 2.33 2.06 2.19 Boron -10, ppm* 213.8 197.8 205.5 OxyQen, (DO), ppm 0.005 0.005 0.005 Chloride, ppm 0.021 0.016 0.02 pH @ 25 degree Celsius 6.56 6.46 6.5 Boron -10 = Total Boron x 0.196 Comments:
Electrical Corrective Maintenance Procedure O-ECM-2503-03, "Main Generator Hydrogen System Maintenance", was revised to provide a Temporary Modification to install a temporary pressure gauge in the main generator hydrogen gas system to perform a system leak check.
None 4lturry Monthly Operating Report No. 99-04 Page16of18 Unit No. 2 Max. Min. AvQ. 1.93E-1 4.95E-4 5.41 E-2 0.125 0.01 0.06 4.52E-2 4.08E-2 4.30E-2 1.87E-4 4.94E-5 8.17E-5 0.12 0.09 0.11 38.5 3.2 28.6 0.83 0.19 0.66 373.97 0.196 95.38 8 0.005 4.64 0.017 0.001 0.008 9.49 4.31 5.75 
 
,, New Fuel Shipment or Cask No. e FUEL HANDLING UNITS 1 & 2 MONTHNEAR:
e                                                  e  Surry Monthly Operating Report No. 99-04 Page 13 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT  DID NOT REQUIRE NRC    APPROVAL MONTHNEAR:    April 1999 1/2-0P-RC-002 Operating Procedures                                                              04/13/99 (Safety Evaluation 99-027)
April 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number ANSI Number None during the Reporting Period .rry Monthly Operating Report No. 99-04 Page 17 of 18 Initial Enrichment New or Spent Fuel Shipping Cask Activity
Operating Procedures 1/2-0P-RC-002, "Reactor Coolant System Fill", were (Unit 2)/will be (Unit 1) revised to remove the Motor Operated Valve seal-in circuit to allow electrically "bumping" open the Loop Stop Valves from the Main Control Room when filling a drained Reactor Coolant loop. This activity will minimize the time and dose required to manually place the valve at zero deflection inside containment.
* 4'urry Monthly Operating Report No. 99-04 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR:
2-0P-RC-011  Operating Procedure                                                              04/13/99 (Safety Evaluation 99-028)
April 1999 None during the Reporting Period}}
Operating Procedure 2-0P-RC-011, "Pressurizer Relief Tank Operations", was revised to provide an alternate vent path for degassing the Unit 2 Pressurizer Relief Tank (PRT) to the Overhead Gas System through the PRT vapor space sample line when gaseous activity levels are high.
2-MOP-DG-002  Maintenance Operating Procedure                                                  04/15/99 (Safety Evaluation 99-030)
Maintenance Operating Procedure 2-MOP-DG-002, "Removal and Return to Service of the PDTI Inlet PCV", was written to maintain pressure control valve (PCV) 2-DG-PCV-200 in the open position during Cold Shutdown or Refueling Shutdown in order to provide a flow path for Reactor Coolant System loop drains and other drains to the Primary Drain Transfer Tank (PDTI).
2-MOP-EP-401  Maintenance Operating Procedures                                                  04/15/99 2-MOP-EP-402  (Safety Evaluation 99-031)
Maintenance Operating Procedures 2-MOP-EP-401, "Unit 2 Generator Tagout", and 2-MOP-EP-402, "Return to Service of Unit 2 Main Generator", were revised to provide a Procedurally Controlled Temporary Modification to bypass the fire detection alarm to the Low Pressure CO2 Fire Suppression system for the turbine and generator tagged out during the Refueling Outage.
O-MCM-1410-04 Mechanical Corrective Maintenance Procedures                                      04/15/99 O-MCM-1420-02 (Safety Evaluation 99-032)
Mechanical Corrective Maintenance Procedures O-MCM-1410-04, "Turbine Pedestal Maintenance", and O-MCM-1420-02, "Low Pressure Turbine Maintenance", were revised to provide a Procedurally Controlled Temporary Modification to bypass the bearing lift oil pressure anti-start interlock in the main turbine Turning Gear motor circuitry to allow periodic rotation of the turbine rotor using the turning gear.
 
e    Surry Monthly Operating Report No. 99-04 Page 14 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT  DID NOT REQUIRE NRC    APPROVAL MONTHNEAR:    April 1999 FP-VPA-FR1 .0.1999 Vendor Procedure                                                                    04/27/99 (Safety Evaluation 99-037)
Vendor Procedure, FP-VPA-FR1 .0.1999, "Fuel Repair for Surry Unit 1 and Unit 2", provides instructions for the installation and removal of equipment required for fuel repairs as well as for the actual fuel repairs including removal and reattachment of the fuel assembly top nozzle. To perform the repairs, the temporary replacement of the new fuel elevator basket with a Westinghouse basket will be performed via a Procedurally Controlled Temporary Modification.
SE 99-039         Safety Evaluation                                                                  04/29/99 Safety Evaluation 99-039 evaluates the "Safety Monitor", which is a program that will perform on-line risk calculations to support compliance with 10 CFR 50.65 (the Maintenance Rule).
 
tlturry Monthly OperatingNo.Report 99-04 Page15of18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 None during the Reporting Period
 
    .                              e                                        4lturry Monthly Operating Report No. 99-04 Page16of18 CHEMISTRY REPORT MONTHNEAR: April 1999 Unit No. 1                       Unit No. 2 Primary Coolant Analysis          Max.        Min.        AvQ. Max.        Min.        AvQ.
Gross Radioactivity, &#xb5;Ci/ml            3.34E-1    2.28E-1      2.93E-1 1.93E-1      4.95E-4      5.41 E-2 Suspended Solids, oom                      -          -            -    0.125        0.01        0.06 Gross Tritium, &#xb5;Ci/ml                 9.43E-1     8.38E-1     8.99E-1 4.52E-2      4.08E-2      4.30E-2 1131, &#xb5;Ci/ml                           4.24E-4     2.16E-4     3.39E-4 1.87E-4      4.94E-5      8.17E-5 113111133                                0.08        0.04         0.07   0.12        0.09        0.11 Hvdroqen, cc/kq                         40.4         37         39.1   38.5          3.2        28.6 Lithium, oom                            2.33       2.06         2.19   0.83        0.19        0.66 Boron - 10, ppm*                       213.8       197.8       205.5 373.97        0.196        95.38 OxyQen, (DO), ppm                       0.005       0.005       0.005     8        0.005        4.64 Chloride, ppm                           0.021       0.016         0.02   0.017        0.001        0.008 pH   @ 25 degree Celsius                 6.56       6.46         6.5   9.49        4.31        5.75 Boron - 10 = Total Boron x 0.196 Comments:
None
 
,,                        e                                        . r r y Monthly Operating Report No. 99-04 Page 17 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR:  April 1999 New Fuel                  Number of                                                New or Spent Shipment or Date Stored or  Assemblies      Assembly          ANSI        Initial    Fuel Shipping Cask No. Received    per Shipment      Number          Number    Enrichment    Cask Activity None during the Reporting Period
* 4'urry Monthly OperatingNo.Report 99-04 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: April 1999 None during the Reporting Period}}

Latest revision as of 00:59, 21 October 2019

Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr
ML18152B416
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/30/1999
From: Ashley J, Grecheck E, Pincus J, Stief R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
99-275, NUDOCS 9905180312
Download: ML18152B416 (19)


Text

<* e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 May 12, 1999 United States Nuclear Regulatory Commission Serial No.99-275 Attention: Document Control Desk SPSUc/JSA RO Washington, D.C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT The Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of April 1999 is provided in the attachment.

If you have any questions or require additional information, please contact us.

Very truly yours, E. S. Grecheck, Site Vice President Surry Power Station Attachment Commitments made by this letter: None cc: U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street, S. W.

Suite 23T8.5 Atlanta, Georgia 30303 . -- , , (\ (~ A

-\ (') i.. . i \) \....,,t *-

Mr. R. A. Musser NRG Senior Resident Inspector Surry Power Station r 9905180312 990430 PDR ADOCK 05000280 R PDR

,, e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-04 Approved:

~/bate

e Surry Monthly Operating Report No. 99-04 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................4 Unit Shutdowns and Power Reductions - Unit.No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ............................................................................................. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 1O Procedure or Method of Operation Changes That Did Not Require NRC Approval ................................................. 12 Tests and Experiments That Did Not Require NRC Approval. ................................................................................. 15 Chemistry Report ..................................................................................................................................................... 16 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 17 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18

e Surry Monthly Operating Report No. 99-04 Page3of18 OPERATING DATA REPORT Docket No.: 50-280 Date: 05/02/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......................................................... . Surry Unit 1
2. Reporting Period: ................................................ . April 1999
3. Licensed Thermal Power (MWt): ........................ .. 2546
4. Nameplate Rating (Gross MWe): ....................... .. 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 719.0 2879.0 231023.0
12. Hours Reactor Was Critical 719.0 2879.0 164195.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 719.0 2879.0 161650.4
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1830309.2 7327775.1 381518732.6
17. Gross Electrical Energy Generated (MWH) 608715.0 2439592.0 125209748.0
18. Net Electrical Energy Generated (MWH) 587357.0 2357081.0 119343685.0
19. Unit Service Factor 100.0% 100.0% 70.0%
20. Unit Availability Factor 100.0% 100.0% 71.6%
21. Unit Capacity Factor (Using MDC Net) 102.0% 102.2% 66.3%
22. Unit Capacity Factor (Using DER Net) 103.7% 103.9% 65.6%
23. Unit Forced Outage Rate 0.0% 0.0% 14.2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e e Surry Monthly Operating Report No. 99-04 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 05/02/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......................................................... . Surry Unit 2
2. Reporting Period: ................................................ . April 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 719.0 2879.0 227904.0
12. Hours Reactor Was Critical 408.1 2568.1 162478.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 407.9 2567.9 160461.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 735692.0 5937292.3 379732941 .3
17. Gross Electrical Energy Generated (MWH) 248985.0 1999520.0 124547413.0
18. Net Electrical Energy Generated (MWH) 238011.0 1927753.0 118749780.0
19. Unit Service Factor 56.7% 89.2% 70.4%
20. Unit Availability Factor 56.7% 89.2% 70.4%
21. Unit Capacity Factor (Using MDC Net) 41.3% 83.6% 66.6%
22. Unit Capacity Factor (Using DER Net) 42.0% 85.0% 66.1%
23. Unit Forced Outage Rate 0.0% 0.0% 11.2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 99-04 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: April 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 05/04/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 99-04 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: April 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 05/04/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 (1) (2) (3) (4) (5)

Method Duration of LER No. System Component Cause & Corrective Action Date Type Hours Reason Shutting Code Code to Prevent Recurrence Down Rx 04/18/99 s 311.1 C 1 N/A N/A N/A Refueling Outage (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 99-04 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 05/02/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: April 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 819 17 817 2 820 18 805 3 820 19 810 4 785 20 812 5 819 21 815 6 819 22 816 7 820 23 816 8 819 24 819 9 822 25 816 10 818 26 817 11 818 27 816 12 818 28 817 13 815 29 818 14 817 30 818 15 818 16 817 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-04 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 05/02/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: April 1999 Average Daily Power Level Average Daily Power Level Day (Mwe - Net) Day (Mwe - Net) 628 17 515 2 623 18 2 3 616 19 0 4 585 20 0 5 606 21 0 6 599 22 0 7 595 23 0 8 589 24 0 9 581 25 0 10 581 26 0 11 579 27 0 12 573 28 0 13 568 29 0 14 565 30 0 15 558 16 554 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

I

_j

e e Surry Monthly Operating Report No. 99-04 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR: April 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

04/01/99 0000 Unit starts the month at 100% / 850 MWe.

04/20/99 1044 Commence unit ramp down to swap HP heater drain pump. Unit at 100% / 850 MWe.

04/20/99 1110 Stopped ramp. Unit at 98% / 830 MWe.

04/20/99 1255 Commenced ramp up. Unit at 98% / 830 MWe.

04/20/99 1434 Unit at 100% / 850 MWe.

04/30/99 2400 Unit finished the month at 100% / 850 MWe.

UNIT Two:

04/01/99 0000 Unit started the month at 76% / 660 MWe. (coast-down continues) 04/18/99 0052 Turbine tripped for Refueling Outage.

04/18/99 0103 Reactor tripped for Refueling Outage.

04/30/99 2400 Unit finished the month at 0% / 0 MWe.

e e Surry Monthly Operating Report No. 99-04 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 FS99-002 UFSAR Change Request 04/08/99 (Safety Evaluation 99-022)

As a result of the Integrated Configuration Management Project review, UFSAR Change Request FS99-002 contains corrections and clarifications to the UFSAR sections that discuss Surry's radiation monitoring system. These changes are to enhance accuracy and do not affect any radiation monitoring system or structure, or any of its component's operation or performance.

SE 99-026 Safety Evaluation 04/13/99 Safety Evaluation 99-026 evaluates the 1999 Unit 2 Refueling Outage against current industry guidelines and Virginia power administrative requirements for shutdown risk management including NUMARC 91-06 and NE Technical Report 865, Rev. 3. The schedule provides a plan for safely and efficiently accomplishing refueling, maintenance, modification, and testing activities.

DCP 98-092 Design Change Package 04/15/99 (Safety Evaluation 99-029)

Design Change Package 98-092, "Reactor Protection Test Logic Surge Suppressors/Surry/1 &2", installed surge suppressors on certain Reactor Protection Logic test relays to prevent noise spiking during the performance of the monthly Reactor Protection Test.

TM S1-99-004 Temporary Modification 04/18/99 (Safety Evaluation 99-033)

Air compressor 1-SA-C-3 is leaking air and is unable to supply air to the Laundry Facility.

Temporary Modification S1-99-004 installed a temporary compressor to supply reliable air to the Laundry Facility.

TM S1 003 Temporary Modification 04/22/99 (Safety Evaluation 99-034)

Temporary Modification S1-99-003 evaluates the use of three fire hose stations to supply the sprinkler systems in temporary trailers in the Turbine Building to support the Unit 2 Refueling Outage.

TM S1-99-005 Temporary Modification 04/23/99 (Safety Evaluation 99-035)

Temporary Modification S1-99-005 installed a temporary Non-Safety Passive Autocatalytic Recombiner in Unit 1 Containment to maintain the containment Hydrogen concentration less than the design basis limit of 0.8%.

e Surry Monthly Operating Report No. 99-04 Page 11 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 DCP 99-035 Design Change Package 04/27/99 (Safety Evaluation 99-036)

Design Change Package 99-035, "Fuel Assembly Repair, removes fuel assembly top nozzles containing defective parts and replaces them with new, functionally equivalent, top nozzles.

ET S-99-079 Engineering Transmittal 04/29/99 (Safety Evaluation 99-038)

Engineering Transmittal S-99-079, "Alternate Packing Material for 2-RC-77", accepts the previous 1996 injected packing of valve 2-RC-77 as a permanent repair since the packing has not leaked over the past two cycles.

e Surry Monthly Operating Report No. 99-04 Page 12 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 1/2-AP-4.00 Abnormal Procedures 04/16/99 (Safety Evaluation 97-008, Rev. 1)

Abnormal Procedures 1/2-AP-4.00, "Nuclear Instrumentation Malfunction", were changed to allow entry into containment without audible count rate available. Revision 1 added that if the count rate increases by 1h decade over its previous reading, or an increasing trend in the count rate is observed, personnel must be evacuated from containment.

O-MOP-GW-001 Maintenance Operating Procedures 04/07/99 O-MOP-GW-002 (Safety Evaluation 98-064, Rev. 1)

Maintenance Operating Procedures O-MOP-GW-001, "Purging the Outer Tank for 1-GW-TK-1A", and O-MOP-GW-002, "Purging the Outer Tank for 1-GW-TK-1 B", were revised to provide a Temporary Modification to purge and sample the outer Waste Gas Decay Tank for maintenance. Revision 1 added procedure O-MOP-GW-002 for tank 1B.

OP-23.2.11 Operating Procedures 04/06/99 OP-23.2.12 (Safety Evaluation 99-020)

Operating Procedures OP-23.2.11, "Sampling Alignment for WGDT 1A", and OP-23.2.12, "Sampling Alignment for WGDT 1B", were revised to provide a Temporary Modification to install tubing between the sample outlet for the outer Waste Gas Decay Tank (WGDT) to the local sample panel used to sample the inner WGDT.

1/2-0SP-FW-004 Operations Surveillance Procedures 04/08/99 (Safety Evaluation 99-023)

Operations Surveillance Procedures 1/2-0SP-FW-004, "Unit 1 and Unit 2 AFW and AFW Cross-tie ISi Test", were written to perform the ASME Section XI pressure testing in the AFW cross-tie line. The procedures will control the removal of the seal-in contacts on several Auxiliary Feedwater (AFW) motor operated valves to allow throttling capability.

O-MCM-0125-01 Mechanical Corrective Maintenance Procedure 04/12/99 (Safety Evaluation 99-024)

Mechanical Corrective Maintenance Procedure O-MCM-0125-01, "Main Condensate Pump Maintenance", was revised to provide a Temporary Modification to temporarily remove and re-install a section of fire protection piping which interferes with the removal of the condensate pumps/motors during maintenance.

O-ECM-2503-03 Electrical Corrective Maintenance Procedure 04/13/99 (Safety Evaluation 99-025)

Electrical Corrective Maintenance Procedure O-ECM-2503-03, "Main Generator Hydrogen System Maintenance", was revised to provide a Temporary Modification to install a temporary pressure gauge in the main generator hydrogen gas system to perform a system leak check.

e e Surry Monthly Operating Report No. 99-04 Page 13 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 1/2-0P-RC-002 Operating Procedures 04/13/99 (Safety Evaluation 99-027)

Operating Procedures 1/2-0P-RC-002, "Reactor Coolant System Fill", were (Unit 2)/will be (Unit 1) revised to remove the Motor Operated Valve seal-in circuit to allow electrically "bumping" open the Loop Stop Valves from the Main Control Room when filling a drained Reactor Coolant loop. This activity will minimize the time and dose required to manually place the valve at zero deflection inside containment.

2-0P-RC-011 Operating Procedure 04/13/99 (Safety Evaluation 99-028)

Operating Procedure 2-0P-RC-011, "Pressurizer Relief Tank Operations", was revised to provide an alternate vent path for degassing the Unit 2 Pressurizer Relief Tank (PRT) to the Overhead Gas System through the PRT vapor space sample line when gaseous activity levels are high.

2-MOP-DG-002 Maintenance Operating Procedure 04/15/99 (Safety Evaluation 99-030)

Maintenance Operating Procedure 2-MOP-DG-002, "Removal and Return to Service of the PDTI Inlet PCV", was written to maintain pressure control valve (PCV) 2-DG-PCV-200 in the open position during Cold Shutdown or Refueling Shutdown in order to provide a flow path for Reactor Coolant System loop drains and other drains to the Primary Drain Transfer Tank (PDTI).

2-MOP-EP-401 Maintenance Operating Procedures 04/15/99 2-MOP-EP-402 (Safety Evaluation 99-031)

Maintenance Operating Procedures 2-MOP-EP-401, "Unit 2 Generator Tagout", and 2-MOP-EP-402, "Return to Service of Unit 2 Main Generator", were revised to provide a Procedurally Controlled Temporary Modification to bypass the fire detection alarm to the Low Pressure CO2 Fire Suppression system for the turbine and generator tagged out during the Refueling Outage.

O-MCM-1410-04 Mechanical Corrective Maintenance Procedures 04/15/99 O-MCM-1420-02 (Safety Evaluation 99-032)

Mechanical Corrective Maintenance Procedures O-MCM-1410-04, "Turbine Pedestal Maintenance", and O-MCM-1420-02, "Low Pressure Turbine Maintenance", were revised to provide a Procedurally Controlled Temporary Modification to bypass the bearing lift oil pressure anti-start interlock in the main turbine Turning Gear motor circuitry to allow periodic rotation of the turbine rotor using the turning gear.

e Surry Monthly Operating Report No. 99-04 Page 14 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 FP-VPA-FR1 .0.1999 Vendor Procedure 04/27/99 (Safety Evaluation 99-037)

Vendor Procedure, FP-VPA-FR1 .0.1999, "Fuel Repair for Surry Unit 1 and Unit 2", provides instructions for the installation and removal of equipment required for fuel repairs as well as for the actual fuel repairs including removal and reattachment of the fuel assembly top nozzle. To perform the repairs, the temporary replacement of the new fuel elevator basket with a Westinghouse basket will be performed via a Procedurally Controlled Temporary Modification.

SE 99-039 Safety Evaluation 04/29/99 Safety Evaluation 99-039 evaluates the "Safety Monitor", which is a program that will perform on-line risk calculations to support compliance with 10 CFR 50.65 (the Maintenance Rule).

tlturry Monthly OperatingNo.Report 99-04 Page15of18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: April 1999 None during the Reporting Period

. e 4lturry Monthly Operating Report No. 99-04 Page16of18 CHEMISTRY REPORT MONTHNEAR: April 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ.

Gross Radioactivity, µCi/ml 3.34E-1 2.28E-1 2.93E-1 1.93E-1 4.95E-4 5.41 E-2 Suspended Solids, oom - - - 0.125 0.01 0.06 Gross Tritium, µCi/ml 9.43E-1 8.38E-1 8.99E-1 4.52E-2 4.08E-2 4.30E-2 1131, µCi/ml 4.24E-4 2.16E-4 3.39E-4 1.87E-4 4.94E-5 8.17E-5 113111133 0.08 0.04 0.07 0.12 0.09 0.11 Hvdroqen, cc/kq 40.4 37 39.1 38.5 3.2 28.6 Lithium, oom 2.33 2.06 2.19 0.83 0.19 0.66 Boron - 10, ppm* 213.8 197.8 205.5 373.97 0.196 95.38 OxyQen, (DO), ppm 0.005 0.005 0.005 8 0.005 4.64 Chloride, ppm 0.021 0.016 0.02 0.017 0.001 0.008 pH @ 25 degree Celsius 6.56 6.46 6.5 9.49 4.31 5.75 Boron - 10 = Total Boron x 0.196 Comments:

None

,, e . r r y Monthly Operating Report No. 99-04 Page 17 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: April 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity None during the Reporting Period

  • 4'urry Monthly OperatingNo.Report 99-04 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTHNEAR: April 1999 None during the Reporting Period