{{#Wiki_filter:1*~ I e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved:
{{#Wiki_filter:1*~
t./ 12. I ,~ 9904190257 990413 PDR ADOCK 05000280 R PDR Date -1 e TABLE OF CONTENTS Section e Surry Monthly Operating Report No. 99-03 Page 2 of 18 Page Operating Data Report -Unit No. 1 ............................................................................................................................
I
3 Operating Data Report -Unit No. 2 ............................................................................................................................
                                                                    -1 e
4 Unit Shutdowns and Power Reductions  
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved:                           t./ 12.
-Unit No. 1 ..................................................................................................
Date I
5 Unit Shutdowns and Power Reductions  
    ,~ 9904190257 990413 PDR ADOCK 05000280 R             PDR
-Unit No. 2 ..................................................................................................
 
6 Average Daily Unit Power Level -Unit No. 1 ..............................................................................................................
e                                                                             e           Surry Monthly Operating Report No. 99-03 Page 2 of 18 TABLE OF CONTENTS Section                                                                                                                                                          Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ..............................................................................: .............. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 11 Tests and Experiments That Did Not Require NRC Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18
7 Average Daily Unit Power Level -Unit No. 2 ..............................................................................................................
 
8 Summary of Operating Experience  
e                                                             e     Surry Monthly Operating Report No. 99-03 Page 3 of 18 OPERATING DATA REPORT Docket No.:   50-280 Date:   04/01/99 Completed By:  R. Stief Telephone:  (757) 365-2486
-Unit Nos. 1 and 2 ..............................................................................
: 1. Unit Name: .......................................................... . Surry Unit 1
: ..............
: 2. Reporting Period: ............................................... .. March 1999
9 Facility Changes That Did Not Require NRC Approval ............................................................................................
: 3. Licensed Thermal Power (MWt): ........................ ..                  2546
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval.  
: 4. Nameplate Rating (Gross MWe): ....................... ..                    847.5
................................................
: 5. Design Electrical Rating (Net MWe): .................. ..                    788
11 Tests and Experiments That Did Not Require NRC Approval ..................................................................................
: 6. Maximum Dependable Capacity (Gross MWe): .. .                                840
12 Chemistry Report .....................................................................................................................................................
: 7. Maximum Dependable Capacity (Net MWe): ...... .                             801
13 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications  
: 9. Power Level To Which Restricted, If Any (Net MWe):
.......................................................................................................................
: 10. Reasons For Restrictions, If Any:
18
This Month     Year-To-Date         Cumulative
: 1. 2. 3. 4. 5. 6. 7. e OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-03 Page 3 of 18 Docket No.: Date: Completed By: 50-280 04/01/99 R. Stief Unit Name: .......................................................... . Reporting Period: ...............................................  
: 11. Hours in Reporting Period                                                             744.0           2160.0         230304.0
.. Licensed Thermal Power (MWt): ........................  
: 12. Hours Reactor Was Critical                                                           744.0           2160.0         163476.5
.. Nameplate Rating (Gross MWe): .......................  
: 13. Reactor Reserve Shutdown Hours                                                         0.0               0.0           3774.5
.. Design Electrical Rating (Net MWe): ..................  
: 14. Hours Generator On-Line                                                               744.0           2160.0         160931.4
.. Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 1 March 1999 2546 847.5 788 840 801 Telephone:
: 15. Unit Reserve Shutdown Hours                                                             0.0               0.0           3736.2
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date Cumulative
: 16. Gross Thermal Energy Generated (MWH)                                           1893613.0         5497465.9       379688423.4
: 11. Hours in Reporting Period 744.0 2160.0 230304.0 12. Hours Reactor Was Critical 744.0 2160.0 163476.5 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 14. Hours Generator On-Line 744.0 2160.0 160931.4 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4
: 17. Gross Electrical Energy Generated (MWH)                                           629447.0       1830877.0       124601033.0
: 17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0
: 18. Net Electrical Energy Generated (MWH)                                             608218.0       1769724.0       118756328.0
: 18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0
: 19. Unit Service Factor                                                                 100.0%           100.0%               69.9%
: 19. Unit Service Factor 100.0% 100.0% 69.9% 20. Unit Availability Factor 100.0% 100.0% 71.5% 21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2% 22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4% 23. Unit Forced Outage Rate 0.0% 0.0% 14.3% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 20. Unit Availability Factor                                                           100.0%           100.0%               71.5%
: 21. Unit Capacity Factor (Using MDC Net)                                               102.1%           102.3%               66.2%
: 22. Unit Capacity Factor (Using DER Net)                                               103.7%           104.0%               65.4%
: 23. Unit Forced Outage Rate                                                               0.0%             0.0%             14.3%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED
FORECAST              ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
: 1. 2. 3. 4. 5. 6. 7. OPERATING DATA REPORT e Surry Monthly Operating Report No. 99-03 Page 4 of 18 Docket No.: Date: Completed By: 50-281 04/01/99 R. Stief Unit Name: .......................................................... . Reporting Period: ................................................ . Licensed Thermal Power (MWt): ......................... . Nameplate Rating (Gross MWe): ........................ . Design Electrical Rating (Net MWe): ................... . Maximum Dependable Capacity (Gross MWe): .. . Maximum Dependable Capacity (Net MWe): ...... . Surry Unit 2 March 1999 2546 847.5 788 840 801 Telephone:
 
(757) 365-2486 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: 9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: This Month Year-To-Date
e       Surry Monthly Operating Report No. 99-03 Page 4 of 18 OPERATING DATA REPORT Docket No.:   50-281 Date:    04/01/99 Completed By:    R. Stief Telephone:    (757) 365-2486
: 11. Hours in Reporting Period 744.0 2160.0 12. Hours Reactor Was Critical 744.0 2160.0 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 744.0 2160.0 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3
: 1. Unit Name: .......................................................... . Surry Unit 2
: 17. Gross Electrical Energy Generated (MWH) 545360.0.
: 2. Reporting Period: ................................................ . March 1999
1750535.0
: 3. Licensed Thermal Power (MWt): ......................... .                  2546
: 18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0
: 4. Nameplate Rating (Gross MWe): ........................ .                    847.5
: 19. Unit Service Factor 100.0% .100.0% 20. Unit Availability Factor 100.0% 100.0% 21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling, April 18, 1999, 36 Days 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 5. Design Electrical Rating (Net MWe): ................... .                    788
: 6. Maximum Dependable Capacity (Gross MWe): .. .                                840
: 7. Maximum Dependable Capacity (Net MWe): ...... .                             801
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month       Year-To-Date           Cumulative
: 11. Hours in Reporting Period                                                             744.0             2160.0           227185.0
: 12. Hours Reactor Was Critical                                                           744.0             2160.0           162070.3
: 13. Reactor Reserve Shutdown Hours                                                         0.0                 0.0             328.1
: 14. Hours Generator On-Line                                                               744.0             2160.0           160053.5
: 15. Unit Reserve Shutdown Hours                                                             0.0                  0.0               0.0
: 16. Gross Thermal Energy Generated (MWH)                                             1612656.8           5201600.3        378997249.3
: 17. Gross Electrical Energy Generated (MWH)                                           545360.0.           1750535.0        124298428.0
: 18. Net Electrical Energy Generated (MWH)                                             525041.0           1689742.0        118511769.0
: 19. Unit Service Factor                                                                 100.0%             .100.0%               70.5%
: 20. Unit Availability Factor                                                           100.0%             100.0%               70.5%
: 21. Unit Capacity Factor (Using MDC Net)                                                 88.1%               97.7%             66.6%
: 22. Unit Capacity Factor (Using DER Net)                                                 89.6%               99.3%             66.2%
: 23. Unit Forced Outage Rate                                                               0.0%                 0.0%             11.2%
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, April 18, 1999, 36 Days
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
: 26. Unit In Test Status (Prior to Commercial Operation):
: 26. Unit In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION FORECAST ACHIEVED Cumulative 227185.0 162070.3 328.1 160053.5 0.0 378997249.3 124298428.0 118511769.0 70.5% 70.5% 66.6% 66.2% 11.2%
FORECAST                ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: March 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)
 
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
e     Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. R. Pincus Telephone:
REPORT MONTH: March 1999 Docket No.:   50-280 Unit Name:   Surry Unit 1 Date: 04/01/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 None during the Reporting Period (1)                           (2)                                               (3)
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)
F:   Forced                 REASON:                                          METHOD:
(5) Exhibit 1 -Same Source e Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) (1) F: Forced S: Scheduled (4) REPORT MONTH: March 1999 None during the Reporting Period (2) REASON: A -Equipment Failure (Explain)
S:   Scheduled               A - Equipment Failure (Explain)                   1 - Manual B     Maintenance or Test                         2 - Manual Scram C     Refueling                                   3 - Automatic Scram D     Regulatory Restriction                     4 - Other (Explain)
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
E     Operator Training & Licensing Examination F     Administrative G     Operational Error (Explain)
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone:
(4)                                                                              (5)
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets                 Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
(5) Exhibit 1 -Same Source
 
~~--------e e Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. S. Ashley Telephone:
e      Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
(757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe -Net) Day (Mwe -Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
REPORT MONTH:  March 1999 Docket No.:   50-281 Unit Name:   Surry Unit 2 Date: 04/01/99 Completed by:   J. R. Pincus Telephone:   (757) 365-2863 None during the Reporting Period (1)                          (2)                                                (3)
MONTH: March 1999 Day 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 INSTRUCTIONS e e Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Average Daily Power Level (Mwe -Net) Day 750 17 750 18 751 19 749 20 747 21 747 22 748 23 747 24 745 25 741 26 736 27 732 28 726 29 724 30 718 31 713 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. S. Ashley Telephone:
F:  Forced                  REASON:                                          METHOD:
(757) 365-2161 Average Daily Power Level (Mwe -Net) 707 701 699 692 686 682 673 671 664 662 658 650 644 640 624 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt.
S:  Scheduled              A - Equipment Failure (Explain)                  1 - Manual B    Maintenance or Test                        2 - Manual Scram C    Refueling                                  3 - Automatic Scram D    Regulatory Restriction                      4 - Other (Explain)
e  
E    Operator Training & Licensing Examination F    Administrative G    Operational Error (Explain)
(4)                                                                              (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets                  Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
 
e                                                 e       Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-280 Unit Name:   Surry Unit 1 Date:   04/01/99 Completed by:     J. S. Ashley Telephone:   (757) 365-2161 MONTH:     March 1999 Average Daily Power Level                       Average Daily Power Level Day                   (MWe - Net)                 Day                   (Mwe - Net) 819                     17                       818 2                       819                     18                       819 3                       819                     19                       819 4                       819                     20                       819 5                       819                     21                       818 6                       820                     22                       793 7                       819                     23                       812 8                       818                     24                       818 9                       818                     25                       818 10                       819                     26                       815 11                       819                     27                       812 12                       820                     28                       818 13                       820                     29                       819 14                       820                     30                       820 15                       819                     31                       820 16                       819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e                                               e       Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.:   50-281 Unit Name:   Surry Unit 2 Date:   04/01/99 Completed by:     J. S. Ashley Telephone:   (757) 365-2161 MONTH:    March 1999 Average Daily Power Level                       Average Daily Power Level Day                  (Mwe - Net)                 Day                  (Mwe - Net) 750                    17                      707 2                      750                    18                      701 3                      751                    19                      699 4                      749                    20                      692 5                      747                    21                      686 6                      747                    22                      682 7                      748                    23                      673 8                      747                    24                      671 9                      745                    25                      664 10                      741                    26                      662 11                      736                    27                      658 12                      732                    28                      650 13                      726                    29                      644 14                      724                    30                      640 15                      718                    31                      624 16                      713 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
e     Surry Monthly Operating Report No. 99-03 Page 9 of 18


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE MONTHNEAR:
OF OPERATING EXPERIENCE MONTHNEAR: March 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
March 1999 Surry Monthly Operating Report No. 99-03 Page 9 of 18 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
UNIT ONE: 03/01/99 03/21/99 03/23/99 03/31/99 UNIT TWO: 03/01/99 03/31/99 03/31/99 03/31/99 03/31/99 03/31/99 03/31/99 0000 2320 0746 2400 0000 1653 1654 1700 2027 2212 2400 Unit starts the month at 100% / 855 MWe. Removed waterbox "B" from service. Unit at 100% / 830 MWe. Returned waterbox "B" to service. Unit at 100% / 849 MWe. Unit finished the month at 100% / 850 MWe. Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99)
03/01/99     0000          Unit starts the month at 100% / 855 MWe.
Power lost to MSR control system. Unit at 76% / 765 MWe. Commenced unit ramp down to stabilize Tave/Tref.
03/21/99     2320          Removed waterbox "B" from service. Unit at 100% / 830 MWe.
Unit at 76% / 765 MWe. Unit stable at 71 % / 615 MWe. Commenced return to service of MSRs. Unit at 71 % / 615 MWe. MSRs returned to service. Unit at 75% / 650 MWe. Unit finished the month at 76% / 660 MWe.
03/23/99     0746          Returned waterbox "B" to service. Unit at 100% / 849 MWe.
DCP 95-017 FS 99-013 e Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
03/31/99     2400          Unit finished the month at 100% / 850 MWe.
March 1999 Design Change Package (Safety Evaluation 98-050) 04/24/98 Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering.
UNIT TWO:
The new relays meet Virginia Power's seismic requirements.
03/01/99     0000          Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99) 03/31/99     1653         Power lost to MSR control system. Unit at 76% / 765 MWe.
UFSAR Change Request (Safety Evaluation 99-019) 03/25/99 This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident.
03/31/99      1654          Commenced unit ramp down to stabilize Tave/Tref. Unit at 76% / 765 MWe.
O-ECM-1509-03 LDS-SPS1/2 e PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR:
03/31/99      1700          Unit stable at 71 % / 615 MWe.
March 1999 Electrical Corrective Maintenance (Safety Evaluation 99-014) Surry Monthly Operating Report No. 99-03 Page 11 of 18 03/11/99 Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve. Vendor Procedure (Safety Evaluation 99-016) 03/17/99 Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc. while Units 1 and 2 are in normal operation at or near full power.
03/31/99    2027          Commenced return to service of MSRs. Unit at 71 % / 615 MWe.
e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR:
03/31/99     2212          MSRs returned to service. Unit at 75% / 650 MWe.
March 1999 None during the Reporting Period CHEMISTRY REPORT MONTHNEAR:
03/31/99    2400          Unit finished the month at 76% / 660 MWe.
March 1999 Unit No. 1 Primary Coolant Analysis Max. Min. AvQ. Gross Radioactivity, µCi/ml 4.13E-1 2.37E-1 3.05E-1 Suspended Solids, oom O.Q1 0.01 0.01 Gross Tritium, µCi/ml 8.67E-1 7.07E-1 8.01 E-1 1131, µCi/ml 3.90E-4 2.70E-4 3.33E-4 113111133 0.09 0.03 0.06 HvdroQen, cc/kQ 41 38.7 40 Lithium, oom 2.33 2.07 2.22 Boron -10, ppm* 228.14 214.03 220.76 OxyQen, (DO), oom 0.005 0.005 0.005 Chloride, ppm 0.023 0.02 0.021 pH @ 25 degree Celsius 6.56 6.16 6.45
 
* Boron -10 = Total Boron x 0.196 Comments:
e      Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 DCP 95-017 Design Change Package                                                          04/24/98 (Safety Evaluation 98-050)
None e Surry Monthly Operating Report Unit No. 2 Max. Min. 1.70E-1 1.06E-1 0.01 0.01 3.86E-2 2.83E-2 8.75E-5 3.90E-5 0.12 0.03 37.4 35 0.84 0.68 0.392 0.196 0.005 0.005 0.002 0.001 9.54 9.22 No. 99-03 Page 13 of 18 AvQ. 1.46E-1 0.01 3.38E-2 6.98E-5 0.01 35.8 0.78 0.208 0.005 0.001 9.43 New Fuel Shipment or Cask No. Dry Storage Cask TN 32-08 e FUEL HANDLING UNITS 1 & 2 MONTH/YEAR:
Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering. The new relays meet Virginia Power's seismic requirements.
March 1999 Number of Date Stored or Assemblies Assembly ANSI Received ~er Shi~ment Number Number 03/01/99 32 2EO LMODF6 289 LMOESW 281 LMOET8 386 LMOERV 2TO LMOK8R 1T5 LMOK8M 1T2 LMOK8B 2T6 LMOK8U 2T1 LMOK87 2T7 LMOK8J 1T9 LMOK8C W41 LM041Y OF4 LMOJGN W29 LM041A 1T6 LMOK88 2T5 LMOK8E 1T8 LMOK85 1T1 LMOK89 e Surry Monthly Operating Report Initial Enrichment 3.5984 3.5996 3.6032 3.5890 3.5850 3.5781 3.5938 3.5872 3.5799 3.5826 3.5882 3.2030 3.6106 3.2030 3.5810 3.5836 3.5815 3.5985 No. 99-03 Page 14 of 18 New or Spent Fuel Shipping Cask Activi!Y N/A New Fuel Shipment or Cask No. FUEL HANDLING UNITS 1 & 2 MONTHNEAR:
FS 99-013  UFSAR Change Request                                                          03/25/99 (Safety Evaluation 99-019)
March 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number W32 W20 1T4 2T4 1T7 no 2T8 2T3 1T3 2T2 OT9 1S4 1S2 407 ANSI Number LM0412 LM040X LMOK8W LMOK8L LMOK86 LMOK8G LMOK8D LMOK8N LMOK8P LMOK8T LMOK85 LMOESK LMOESU LMOAM6 e Surry Monthly Operating Report Initial Enrichment 3.2030 3.2030 3.5883 3.5936 3.5815 3.5945 3.5964 3.5968 3.5856 3.5952 3.5923 3.5980 3.5995 3.6097 No. 99-03 Page 15 of 18 New or Spent Fuel Shipping Cask Activity New Fuel Shipment or Cask No. Dry Storage Cask TN 32-09 FUEL HANDLING UNITS 1 & 2 MONTHNEAR:
This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident.
March 1999 Number of Date Stored or Assemblies Received per Shipment 03/01/99 32 Assembly Number 4T4 4S5 4SO 4T3 5F3 5S7 2F5 1F8 OF9 4F4 2S2 4S7 2F8 2F4 OF5 1S3 1S5 ANSI Number LMOK9B LMOERL LMOERQ LMOK9K LMOJHE LMOESS LMOJGK LMOJGG LMOJGP LMOJGV LMOERZ LMOERP LMOJG5 LMOJGC LMOJG3 LMOET6 LMOET5
 
* Surry Monthly Operating Report Initial Enrichment 3.7977 3.5972 3.5955 3.7880 3.7926 3.5991 3.5868 3.6032 3.5951 3.7938 3.5985 3.5974 3.5857 3.5961 3.5995 3.5976 3.5991 No. 99-03 Page 16. of 18 New or Spent Fuel Shipping Cask Activity N/A New Fuel
e        Surry Monthly Operating Report No. 99-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT  DID NOT REQUIRE NRC  APPROVAL MONTHNEAR:    March 1999 O-ECM-1509-03 Electrical Corrective Maintenance                                                03/11/99 (Safety Evaluation 99-014)
* Shipment or Cask No.
Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve.
* FUEL HANDLING UNITS 1 & 2 MONTH/YEAR:
LDS-SPS1/2   Vendor Procedure                                                                03/17/99 (Safety Evaluation 99-016)
March 1999 Number of Date Stored or Assemblies Received per Shipment Assembly Number 4S2 W48 OF1 OF2 OS9 4F7 2F7 2F3 1FO 3S4 3FO 4T2 5S8 5S3 4T1 ANSI Number LMOERM LM041T LMOJGO LMOJG1 LMOET1 LMOJHK LMOJGL LMOJGA LMOJG7 LMOERJ LMOJH5 LMOK9A LMOESG LMOETO LMOK9E
Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc.
* Surry Monthly Operating Report Initial Enrichment 3.5965 3.2030 3.5973 3.5860 3.5997 3.7969 3.5927 3.5855 3.5960 3.5993 3.7950 3.7984 3.6000 3.5997 3.7940 No. 99-03 Page 17 of 18 New or Spent Fuel Shipping Cask Activity 
while Units 1 and 2 are in normal operation at or near full power.
*
 
* Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR:
e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: March 1999 None during the Reporting Period
March 1999 None during the Reporting Period}}
 
e      Surry Monthly Operating Report No. 99-03 Page 13 of 18 CHEMISTRY REPORT MONTHNEAR:  March 1999 Unit No. 1                        Unit No. 2 Primary Coolant Analysis          Max.        Min.        AvQ. Max.          Min.        AvQ.
Gross Radioactivity, µCi/ml          4.13E-1    2.37E-1    3.05E-1  1.70E-1       1.06E-1     1.46E-1 Suspended Solids, oom                   O.Q1       0.01        0.01    0.01          0.01         0.01 Gross Tritium, µCi/ml                 8.67E-1     7.07E-1     8.01 E-1 3.86E-2      2.83E-2      3.38E-2 1131, µCi/ml                         3.90E-4     2.70E-4     3.33E-4 8.75E-5      3.90E-5      6.98E-5 113111133                              0.09       0.03         0.06   0.12          0.03        0.01 HvdroQen, cc/kQ                         41         38.7         40     37.4          35          35.8 Lithium, oom                           2.33       2.07       2.22     0.84          0.68        0.78 Boron - 10, ppm*                     228.14     214.03       220.76   0.392        0.196        0.208 OxyQen, (DO), oom                     0.005       0.005       0.005   0.005        0.005        0.005 Chloride, ppm                          0.023       0.02       0.021   0.002        0.001        0.001 pH @ 25 degree Celsius               6.56       6.16       6.45     9.54          9.22        9.43
* Boron - 10 = Total Boron x 0.196 Comments:
None
 
e                                        e Surry Monthly Operating Report No. 99-03 Page 14 of 18 FUEL HANDLING UNITS  1&2 MONTH/YEAR: March 1999 New Fuel                  Number of                                            New or Spent Shipment or Date Stored or  Assemblies    Assembly          ANSI      Initial    Fuel Shipping Cask No. Received    ~er Shi~ment    Number        Number  Enrichment    Cask Activi!Y Dry Storage Cask TN 32-08    03/01/99          32          2EO          LMODF6    3.5984            N/A 289        LMOESW      3.5996 281          LMOET8    3.6032 386          LMOERV    3.5890 2TO          LMOK8R    3.5850 1T5          LMOK8M    3.5781 1T2          LMOK8B    3.5938 2T6          LMOK8U    3.5872 2T1          LMOK87    3.5799 2T7          LMOK8J    3.5826 1T9          LMOK8C    3.5882 W41          LM041Y    3.2030 OF4          LMOJGN    3.6106 W29          LM041A    3.2030 1T6          LMOK88    3.5810 2T5          LMOK8E    3.5836 1T8          LMOK85    3.5815 1T1          LMOK89    3.5985
 
e Surry Monthly Operating Report No. 99-03 Page 15 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR:  March 1999 New Fuel                   Number of                                            New or Spent Shipment or Date Stored or Assemblies   Assembly         ANSI     Initial    Fuel Shipping Cask No. Received     per Shipment    Number         Number   Enrichment    Cask Activity W32          LM0412    3.2030 W20          LM040X    3.2030 1T4          LMOK8W    3.5883 2T4          LMOK8L    3.5936 1T7          LMOK86    3.5815 no          LMOK8G    3.5945 2T8          LMOK8D    3.5964 2T3          LMOK8N    3.5968 1T3          LMOK8P    3.5856 2T2          LMOK8T    3.5952 OT9          LMOK85    3.5923 1S4          LMOESK    3.5980 1S2          LMOESU    3.5995 407          LMOAM6    3.6097
 
                                                                *Surry Monthly Operating Report No. 99-03 Page 16. of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel                  Number of                                          New or Spent Shipment or Date Stored or  Assemblies    Assembly        ANSI    Initial    Fuel Shipping Cask No. Received    per Shipment    Number        Number Enrichment    Cask Activity Dry Storage Cask TN 32-09    03/01/99          32          4T4          LMOK9B    3.7977            N/A 4S5          LMOERL    3.5972 4SO          LMOERQ    3.5955 4T3          LMOK9K    3.7880 5F3          LMOJHE    3.7926 5S7          LMOESS    3.5991 2F5          LMOJGK    3.5868 1F8          LMOJGG    3.6032 OF9          LMOJGP    3.5951 4F4          LMOJGV    3.7938 2S2          LMOERZ    3.5985 4S7          LMOERP    3.5974 2F8          LMOJG5    3.5857 2F4          LMOJGC    3.5961 OF5          LMOJG3    3.5995 1S3          LMOET6    3.5976 1S5          LMOET5    3.5991
 
                          *                                        *Surry Monthly Operating Report No. 99-03 Page 17 of 18 FUEL HANDLING UNITS 1 &2 MONTH/YEAR: March 1999 New Fuel                   Number of                                            New or Spent
* Shipment or Date Stored or  Assemblies    Assembly          ANSI    Initial    Fuel Shipping Cask No. Received    per Shipment    Number        Number Enrichment    Cask Activity 4S2          LMOERM    3.5965 W48          LM041T    3.2030 OF1          LMOJGO    3.5973 OF2          LMOJG1    3.5860 OS9          LMOET1    3.5997 4F7          LMOJHK    3.7969 2F7          LMOJGL    3.5927 2F3          LMOJGA    3.5855 1FO          LMOJG7    3.5960 3S4          LMOERJ    3.5993 3FO          LMOJH5    3.7950 4T2          LMOK9A    3.7984 5S8          LMOESG    3.6000 5S3          LMOETO    3.5997 4T1          LMOK9E    3.7940
 
    *
* Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: March 1999 None during the Reporting Period}}

Latest revision as of 00:56, 21 October 2019

Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2
ML18152B651
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/31/1999
From: Ashley J, Pincus J, Stief R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18152B650 List:
References
NUDOCS 9904190257
Download: ML18152B651 (18)


Text

1*~

I

-1 e

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved: t./ 12.

Date I

,~ 9904190257 990413 PDR ADOCK 05000280 R PDR

e e Surry Monthly Operating Report No. 99-03 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ..............................................................................: .............. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 11 Tests and Experiments That Did Not Require NRC Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18

e e Surry Monthly Operating Report No. 99-03 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......................................................... . Surry Unit 1
2. Reporting Period: ............................................... .. March 1999
3. Licensed Thermal Power (MWt): ........................ .. 2546
4. Nameplate Rating (Gross MWe): ....................... .. 847.5
5. Design Electrical Rating (Net MWe): .................. .. 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 230304.0
12. Hours Reactor Was Critical 744.0 2160.0 163476.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
14. Hours Generator On-Line 744.0 2160.0 160931.4
15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4
17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0
18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0
19. Unit Service Factor 100.0% 100.0% 69.9%
20. Unit Availability Factor 100.0% 100.0% 71.5%
21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2%
22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4%
23. Unit Forced Outage Rate 0.0% 0.0% 14.3%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 99-03 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486

1. Unit Name: .......................................................... . Surry Unit 2
2. Reporting Period: ................................................ . March 1999
3. Licensed Thermal Power (MWt): ......................... . 2546
4. Nameplate Rating (Gross MWe): ........................ . 847.5
5. Design Electrical Rating (Net MWe): ................... . 788
6. Maximum Dependable Capacity (Gross MWe): .. . 840
7. Maximum Dependable Capacity (Net MWe): ...... . 801
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-To-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 227185.0
12. Hours Reactor Was Critical 744.0 2160.0 162070.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
14. Hours Generator On-Line 744.0 2160.0 160053.5
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3 378997249.3
17. Gross Electrical Energy Generated (MWH) 545360.0. 1750535.0 124298428.0
18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0 118511769.0
19. Unit Service Factor 100.0% .100.0% 70.5%
20. Unit Availability Factor 100.0% 100.0% 70.5%
21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 66.6%
22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 66.2%
23. Unit Forced Outage Rate 0.0% 0.0% 11.2%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling, April 18, 1999, 36 Days

25. If Shut Down at End of Report Period, Estimated Date of Start-up:
26. Unit In Test Status (Prior to Commercial Operation):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)

REPORT MONTH: March 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)

REPORT MONTH: March 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)

F: Forced REASON: METHOD:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)

E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)

(4) (5)

Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)

e e Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e e Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (Mwe - Net) Day (Mwe - Net) 750 17 707 2 750 18 701 3 751 19 699 4 749 20 692 5 747 21 686 6 747 22 682 7 748 23 673 8 747 24 671 9 745 25 664 10 741 26 662 11 736 27 658 12 732 28 650 13 726 29 644 14 724 30 640 15 718 31 624 16 713 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.

e Surry Monthly Operating Report No. 99-03 Page 9 of 18

SUMMARY

OF OPERATING EXPERIENCE MONTHNEAR: March 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.

UNIT ONE:

03/01/99 0000 Unit starts the month at 100% / 855 MWe.

03/21/99 2320 Removed waterbox "B" from service. Unit at 100% / 830 MWe.

03/23/99 0746 Returned waterbox "B" to service. Unit at 100% / 849 MWe.

03/31/99 2400 Unit finished the month at 100% / 850 MWe.

UNIT TWO:

03/01/99 0000 Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99) 03/31/99 1653 Power lost to MSR control system. Unit at 76% / 765 MWe.

03/31/99 1654 Commenced unit ramp down to stabilize Tave/Tref. Unit at 76% / 765 MWe.

03/31/99 1700 Unit stable at 71 % / 615 MWe.

03/31/99 2027 Commenced return to service of MSRs. Unit at 71 % / 615 MWe.

03/31/99 2212 MSRs returned to service. Unit at 75% / 650 MWe.

03/31/99 2400 Unit finished the month at 76% / 660 MWe.

e Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 DCP 95-017 Design Change Package 04/24/98 (Safety Evaluation 98-050)

Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering. The new relays meet Virginia Power's seismic requirements.

FS99-013 UFSAR Change Request 03/25/99 (Safety Evaluation 99-019)

This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident.

e Surry Monthly Operating Report No. 99-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 O-ECM-1509-03 Electrical Corrective Maintenance 03/11/99 (Safety Evaluation 99-014)

Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve.

LDS-SPS1/2 Vendor Procedure 03/17/99 (Safety Evaluation 99-016)

Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc.

while Units 1 and 2 are in normal operation at or near full power.

e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: March 1999 None during the Reporting Period

e Surry Monthly Operating Report No. 99-03 Page 13 of 18 CHEMISTRY REPORT MONTHNEAR: March 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ.

Gross Radioactivity, µCi/ml 4.13E-1 2.37E-1 3.05E-1 1.70E-1 1.06E-1 1.46E-1 Suspended Solids, oom O.Q1 0.01 0.01 0.01 0.01 0.01 Gross Tritium, µCi/ml 8.67E-1 7.07E-1 8.01 E-1 3.86E-2 2.83E-2 3.38E-2 1131, µCi/ml 3.90E-4 2.70E-4 3.33E-4 8.75E-5 3.90E-5 6.98E-5 113111133 0.09 0.03 0.06 0.12 0.03 0.01 HvdroQen, cc/kQ 41 38.7 40 37.4 35 35.8 Lithium, oom 2.33 2.07 2.22 0.84 0.68 0.78 Boron - 10, ppm* 228.14 214.03 220.76 0.392 0.196 0.208 OxyQen, (DO), oom 0.005 0.005 0.005 0.005 0.005 0.005 Chloride, ppm 0.023 0.02 0.021 0.002 0.001 0.001 pH @ 25 degree Celsius 6.56 6.16 6.45 9.54 9.22 9.43

None

e e Surry Monthly Operating Report No. 99-03 Page 14 of 18 FUEL HANDLING UNITS 1&2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received ~er Shi~ment Number Number Enrichment Cask Activi!Y Dry Storage Cask TN 32-08 03/01/99 32 2EO LMODF6 3.5984 N/A 289 LMOESW 3.5996 281 LMOET8 3.6032 386 LMOERV 3.5890 2TO LMOK8R 3.5850 1T5 LMOK8M 3.5781 1T2 LMOK8B 3.5938 2T6 LMOK8U 3.5872 2T1 LMOK87 3.5799 2T7 LMOK8J 3.5826 1T9 LMOK8C 3.5882 W41 LM041Y 3.2030 OF4 LMOJGN 3.6106 W29 LM041A 3.2030 1T6 LMOK88 3.5810 2T5 LMOK8E 3.5836 1T8 LMOK85 3.5815 1T1 LMOK89 3.5985

e Surry Monthly Operating Report No. 99-03 Page 15 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity W32 LM0412 3.2030 W20 LM040X 3.2030 1T4 LMOK8W 3.5883 2T4 LMOK8L 3.5936 1T7 LMOK86 3.5815 no LMOK8G 3.5945 2T8 LMOK8D 3.5964 2T3 LMOK8N 3.5968 1T3 LMOK8P 3.5856 2T2 LMOK8T 3.5952 OT9 LMOK85 3.5923 1S4 LMOESK 3.5980 1S2 LMOESU 3.5995 407 LMOAM6 3.6097

  • Surry Monthly Operating Report No. 99-03 Page 16. of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Dry Storage Cask TN 32-09 03/01/99 32 4T4 LMOK9B 3.7977 N/A 4S5 LMOERL 3.5972 4SO LMOERQ 3.5955 4T3 LMOK9K 3.7880 5F3 LMOJHE 3.7926 5S7 LMOESS 3.5991 2F5 LMOJGK 3.5868 1F8 LMOJGG 3.6032 OF9 LMOJGP 3.5951 4F4 LMOJGV 3.7938 2S2 LMOERZ 3.5985 4S7 LMOERP 3.5974 2F8 LMOJG5 3.5857 2F4 LMOJGC 3.5961 OF5 LMOJG3 3.5995 1S3 LMOET6 3.5976 1S5 LMOET5 3.5991
  • *Surry Monthly Operating Report No. 99-03 Page 17 of 18 FUEL HANDLING UNITS 1 &2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent
  • Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 4S2 LMOERM 3.5965 W48 LM041T 3.2030 OF1 LMOJGO 3.5973 OF2 LMOJG1 3.5860 OS9 LMOET1 3.5997 4F7 LMOJHK 3.7969 2F7 LMOJGL 3.5927 2F3 LMOJGA 3.5855 1FO LMOJG7 3.5960 3S4 LMOERJ 3.5993 3FO LMOJH5 3.7950 4T2 LMOK9A 3.7984 5S8 LMOESG 3.6000 5S3 LMOETO 3.5997 4T1 LMOK9E 3.7940
  • Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: March 1999 None during the Reporting Period