ML18152B651: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/31/1999 | | issue date = 03/31/1999 | ||
| title = Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 | | title = Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 | ||
| author name = | | author name = Ashley J, Pincus J, Stief R | ||
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | | author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:1*~ I e VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved: | {{#Wiki_filter:1*~ | ||
t./ 12. I ,~ 9904190257 990413 PDR ADOCK 05000280 R PDR | I | ||
3 Operating Data Report -Unit No. 2 ............................................................................................................................ | -1 e | ||
4 Unit Shutdowns and Power Reductions | VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved: t./ 12. | ||
-Unit No. 1 .................................................................................................. | Date I | ||
5 Unit Shutdowns and Power Reductions | ,~ 9904190257 990413 PDR ADOCK 05000280 R PDR | ||
-Unit No. 2 .................................................................................................. | |||
6 Average Daily Unit Power Level -Unit No. 1 .............................................................................................................. | e e Surry Monthly Operating Report No. 99-03 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ..............................................................................: .............. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 11 Tests and Experiments That Did Not Require NRC Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18 | ||
7 Average Daily Unit Power Level -Unit No. 2 .............................................................................................................. | |||
8 Summary of Operating Experience | e e Surry Monthly Operating Report No. 99-03 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486 | ||
-Unit Nos. 1 and 2 .............................................................................. | : 1. Unit Name: .......................................................... . Surry Unit 1 | ||
: .............. | : 2. Reporting Period: ............................................... .. March 1999 | ||
9 Facility Changes That Did Not Require NRC Approval ............................................................................................ | : 3. Licensed Thermal Power (MWt): ........................ .. 2546 | ||
10 Procedure or Method of Operation Changes That Did Not Require NRC Approval. | : 4. Nameplate Rating (Gross MWe): ....................... .. 847.5 | ||
................................................ | : 5. Design Electrical Rating (Net MWe): .................. .. 788 | ||
11 Tests and Experiments That Did Not Require NRC Approval .................................................................................. | : 6. Maximum Dependable Capacity (Gross MWe): .. . 840 | ||
12 Chemistry Report ..................................................................................................................................................... | : 7. Maximum Dependable Capacity (Net MWe): ...... . 801 | ||
13 Fuel Handling -Unit Nos. 1 and 2 ............................................................................................................................ | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | ||
14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications | : 9. Power Level To Which Restricted, If Any (Net MWe): | ||
....................................................................................................................... | : 10. Reasons For Restrictions, If Any: | ||
This Month Year-To-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 2160.0 230304.0 | |||
.. Licensed Thermal Power (MWt): ........................ | : 12. Hours Reactor Was Critical 744.0 2160.0 163476.5 | ||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 | |||
: 14. Hours Generator On-Line 744.0 2160.0 160931.4 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 | |||
: 16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4 | |||
: 11. Hours in Reporting Period 744.0 2160.0 230304.0 12. Hours Reactor Was Critical 744.0 2160.0 163476.5 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5 14. Hours Generator On-Line 744.0 2160.0 160931.4 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2 16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4 | : 17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0 | ||
: 17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0 | : 18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0 | ||
: 18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0 | : 19. Unit Service Factor 100.0% 100.0% 69.9% | ||
: 19. Unit Service Factor 100.0% 100.0% 69.9% 20. Unit Availability Factor 100.0% 100.0% 71.5% 21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2% 22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4% 23. Unit Forced Outage Rate 0.0% 0.0% 14.3% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | : 20. Unit Availability Factor 100.0% 100.0% 71.5% | ||
: 21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2% | |||
: 22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4% | |||
: 23. Unit Forced Outage Rate 0.0% 0.0% 14.3% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | |||
: 26. Unit In Test Status (Prior to Commercial Operation): | : 26. Unit In Test Status (Prior to Commercial Operation): | ||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
e Surry Monthly Operating Report No. 99-03 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486 | |||
: 11. Hours in Reporting Period 744.0 2160.0 12. Hours Reactor Was Critical 744.0 2160.0 13. Reactor Reserve Shutdown Hours 0.0 0.0 14. Hours Generator On-Line 744.0 2160.0 15. Unit Reserve Shutdown Hours 0.0 0.0 16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3 | : 1. Unit Name: .......................................................... . Surry Unit 2 | ||
: 17. Gross Electrical Energy Generated (MWH) 545360.0. | : 2. Reporting Period: ................................................ . March 1999 | ||
1750535.0 | : 3. Licensed Thermal Power (MWt): ......................... . 2546 | ||
: 18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0 | : 4. Nameplate Rating (Gross MWe): ........................ . 847.5 | ||
: 19. Unit Service Factor 100.0% .100.0% 20. Unit Availability Factor 100.0% 100.0% 21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 23. Unit Forced Outage Rate 0.0% 0.0% 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Refueling, April 18, 1999, 36 Days 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | : 5. Design Electrical Rating (Net MWe): ................... . 788 | ||
: 6. Maximum Dependable Capacity (Gross MWe): .. . 840 | |||
: 7. Maximum Dependable Capacity (Net MWe): ...... . 801 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted, If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Year-To-Date Cumulative | |||
: 11. Hours in Reporting Period 744.0 2160.0 227185.0 | |||
: 12. Hours Reactor Was Critical 744.0 2160.0 162070.3 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1 | |||
: 14. Hours Generator On-Line 744.0 2160.0 160053.5 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3 378997249.3 | |||
: 17. Gross Electrical Energy Generated (MWH) 545360.0. 1750535.0 124298428.0 | |||
: 18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0 118511769.0 | |||
: 19. Unit Service Factor 100.0% .100.0% 70.5% | |||
: 20. Unit Availability Factor 100.0% 100.0% 70.5% | |||
: 21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 66.6% | |||
: 22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 66.2% | |||
: 23. Unit Forced Outage Rate 0.0% 0.0% 11.2% | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
Refueling, April 18, 1999, 36 Days | |||
: 25. If Shut Down at End of Report Period, Estimated Date of Start-up: | |||
: 26. Unit In Test Status (Prior to Commercial Operation): | : 26. Unit In Test Status (Prior to Commercial Operation): | ||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ||
e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) | |||
e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%) | |||
REPORT MONTH: March 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3) | |||
(757) 365-2863 ( | F: Forced REASON: METHOD: | ||
( | S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain) | ||
B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | ||
Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NU REG 0161) Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone: | (4) (5) | ||
(757) 365-2863 (3) METHOD: 1 -Manual 2 -Manual Scram 3 -Automatic Scram 4 -Other (Explain) | Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161) | ||
(5) Exhibit 1 -Same Source | |||
e Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%) | |||
(757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe -Net) Day (Mwe -Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt. | REPORT MONTH: March 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3) | ||
F: Forced REASON: METHOD: | |||
(757) 365-2161 Average Daily Power Level (Mwe -Net) 707 701 699 692 686 682 673 671 664 662 658 650 644 640 624 On this format, list the average daily unit power level in MWe -Net for each day in the reporting month. Compute to the nearest whole megawatt. | S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain) | ||
e | E Operator Training & Licensing Examination F Administrative G Operational Error (Explain) | ||
(4) (5) | |||
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161) | |||
e e Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
e e Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (Mwe - Net) Day (Mwe - Net) 750 17 707 2 750 18 701 3 751 19 699 4 749 20 692 5 747 21 686 6 747 22 682 7 748 23 673 8 747 24 671 9 745 25 664 10 741 26 662 11 736 27 658 12 732 28 650 13 726 29 644 14 724 30 640 15 718 31 624 16 713 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
e Surry Monthly Operating Report No. 99-03 Page 9 of 18 | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE MONTHNEAR: | OF OPERATING EXPERIENCE MONTHNEAR: March 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents. | ||
March 1999 | UNIT ONE: | ||
UNIT ONE: 03/01/99 03/21/99 03/23/99 | 03/01/99 0000 Unit starts the month at 100% / 855 MWe. | ||
03/21/99 2320 Removed waterbox "B" from service. Unit at 100% / 830 MWe. | |||
Unit at 76% / | 03/23/99 0746 Returned waterbox "B" to service. Unit at 100% / 849 MWe. | ||
03/31/99 2400 Unit finished the month at 100% / 850 MWe. | |||
UNIT TWO: | |||
03/01/99 0000 Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99) 03/31/99 1653 Power lost to MSR control system. Unit at 76% / 765 MWe. | |||
03/31/99 1654 Commenced unit ramp down to stabilize Tave/Tref. Unit at 76% / 765 MWe. | |||
03/31/99 1700 Unit stable at 71 % / 615 MWe. | |||
03/31/99 2027 Commenced return to service of MSRs. Unit at 71 % / 615 MWe. | |||
03/31/99 2212 MSRs returned to service. Unit at 75% / 650 MWe. | |||
03/31/99 2400 Unit finished the month at 76% / 660 MWe. | |||
e Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 DCP 95-017 Design Change Package 04/24/98 (Safety Evaluation 98-050) | |||
None e Surry Monthly Operating Report | Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering. The new relays meet Virginia Power's seismic requirements. | ||
FS 99-013 UFSAR Change Request 03/25/99 (Safety Evaluation 99-019) | |||
This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident. | |||
e Surry Monthly Operating Report No. 99-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 O-ECM-1509-03 Electrical Corrective Maintenance 03/11/99 (Safety Evaluation 99-014) | |||
Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve. | |||
LDS-SPS1/2 Vendor Procedure 03/17/99 (Safety Evaluation 99-016) | |||
Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc. | |||
while Units 1 and 2 are in normal operation at or near full power. | |||
e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: March 1999 None during the Reporting Period | |||
March 1999 None during the Reporting Period}} | |||
e Surry Monthly Operating Report No. 99-03 Page 13 of 18 CHEMISTRY REPORT MONTHNEAR: March 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ. | |||
Gross Radioactivity, µCi/ml 4.13E-1 2.37E-1 3.05E-1 1.70E-1 1.06E-1 1.46E-1 Suspended Solids, oom O.Q1 0.01 0.01 0.01 0.01 0.01 Gross Tritium, µCi/ml 8.67E-1 7.07E-1 8.01 E-1 3.86E-2 2.83E-2 3.38E-2 1131, µCi/ml 3.90E-4 2.70E-4 3.33E-4 8.75E-5 3.90E-5 6.98E-5 113111133 0.09 0.03 0.06 0.12 0.03 0.01 HvdroQen, cc/kQ 41 38.7 40 37.4 35 35.8 Lithium, oom 2.33 2.07 2.22 0.84 0.68 0.78 Boron - 10, ppm* 228.14 214.03 220.76 0.392 0.196 0.208 OxyQen, (DO), oom 0.005 0.005 0.005 0.005 0.005 0.005 Chloride, ppm 0.023 0.02 0.021 0.002 0.001 0.001 pH @ 25 degree Celsius 6.56 6.16 6.45 9.54 9.22 9.43 | |||
* Boron - 10 = Total Boron x 0.196 Comments: | |||
None | |||
e e Surry Monthly Operating Report No. 99-03 Page 14 of 18 FUEL HANDLING UNITS 1&2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received ~er Shi~ment Number Number Enrichment Cask Activi!Y Dry Storage Cask TN 32-08 03/01/99 32 2EO LMODF6 3.5984 N/A 289 LMOESW 3.5996 281 LMOET8 3.6032 386 LMOERV 3.5890 2TO LMOK8R 3.5850 1T5 LMOK8M 3.5781 1T2 LMOK8B 3.5938 2T6 LMOK8U 3.5872 2T1 LMOK87 3.5799 2T7 LMOK8J 3.5826 1T9 LMOK8C 3.5882 W41 LM041Y 3.2030 OF4 LMOJGN 3.6106 W29 LM041A 3.2030 1T6 LMOK88 3.5810 2T5 LMOK8E 3.5836 1T8 LMOK85 3.5815 1T1 LMOK89 3.5985 | |||
e Surry Monthly Operating Report No. 99-03 Page 15 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity W32 LM0412 3.2030 W20 LM040X 3.2030 1T4 LMOK8W 3.5883 2T4 LMOK8L 3.5936 1T7 LMOK86 3.5815 no LMOK8G 3.5945 2T8 LMOK8D 3.5964 2T3 LMOK8N 3.5968 1T3 LMOK8P 3.5856 2T2 LMOK8T 3.5952 OT9 LMOK85 3.5923 1S4 LMOESK 3.5980 1S2 LMOESU 3.5995 407 LMOAM6 3.6097 | |||
*Surry Monthly Operating Report No. 99-03 Page 16. of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Dry Storage Cask TN 32-09 03/01/99 32 4T4 LMOK9B 3.7977 N/A 4S5 LMOERL 3.5972 4SO LMOERQ 3.5955 4T3 LMOK9K 3.7880 5F3 LMOJHE 3.7926 5S7 LMOESS 3.5991 2F5 LMOJGK 3.5868 1F8 LMOJGG 3.6032 OF9 LMOJGP 3.5951 4F4 LMOJGV 3.7938 2S2 LMOERZ 3.5985 4S7 LMOERP 3.5974 2F8 LMOJG5 3.5857 2F4 LMOJGC 3.5961 OF5 LMOJG3 3.5995 1S3 LMOET6 3.5976 1S5 LMOET5 3.5991 | |||
* *Surry Monthly Operating Report No. 99-03 Page 17 of 18 FUEL HANDLING UNITS 1 &2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent | |||
* Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 4S2 LMOERM 3.5965 W48 LM041T 3.2030 OF1 LMOJGO 3.5973 OF2 LMOJG1 3.5860 OS9 LMOET1 3.5997 4F7 LMOJHK 3.7969 2F7 LMOJGL 3.5927 2F3 LMOJGA 3.5855 1FO LMOJG7 3.5960 3S4 LMOERJ 3.5993 3FO LMOJH5 3.7950 4T2 LMOK9A 3.7984 5S8 LMOESG 3.6000 5S3 LMOETO 3.5997 4T1 LMOK9E 3.7940 | |||
* | |||
* Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: March 1999 None during the Reporting Period}} |
Latest revision as of 00:56, 21 October 2019
ML18152B651 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 03/31/1999 |
From: | Ashley J, Pincus J, Stief R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML18152B650 | List: |
References | |
NUDOCS 9904190257 | |
Download: ML18152B651 (18) | |
Text
1*~
I
-1 e
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT No. 99-03 Approved: t./ 12.
Date I
,~ 9904190257 990413 PDR ADOCK 05000280 R PDR
e e Surry Monthly Operating Report No. 99-03 Page 2 of 18 TABLE OF CONTENTS Section Page Operating Data Report - Unit No. 1 ............................................................................................................................ 3 Operating Data Report - Unit No. 2 ............................................................................................................................ 4 Unit Shutdowns and Power Reductions - Unit No. 1 .................................................................................................. 5 Unit Shutdowns and Power Reductions - Unit No. 2 .................................................................................................. 6 Average Daily Unit Power Level - Unit No. 1.............................................................................................................. 7 Average Daily Unit Power Level - Unit No. 2 .............................................................................................................. 8 Summary of Operating Experience - Unit Nos. 1 and 2 ..............................................................................: .............. 9 Facility Changes That Did Not Require NRC Approval ............................................................................................ 10 Procedure or Method of Operation Changes That Did Not Require NRC Approval. ................................................ 11 Tests and Experiments That Did Not Require NRC Approval .................................................................................. 12 Chemistry Report ..................................................................................................................................................... 13 Fuel Handling - Unit Nos. 1 and 2 ............................................................................................................................ 14 Description of Periodic Test(s) Which Were Not Completed Within the Time Limits Specified in Technical Specifications ....................................................................................................................... 18
e e Surry Monthly Operating Report No. 99-03 Page 3 of 18 OPERATING DATA REPORT Docket No.: 50-280 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486
- 1. Unit Name: .......................................................... . Surry Unit 1
- 2. Reporting Period: ............................................... .. March 1999
- 3. Licensed Thermal Power (MWt): ........................ .. 2546
- 4. Nameplate Rating (Gross MWe): ....................... .. 847.5
- 5. Design Electrical Rating (Net MWe): .................. .. 788
- 6. Maximum Dependable Capacity (Gross MWe): .. . 840
- 7. Maximum Dependable Capacity (Net MWe): ...... . 801
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 2160.0 230304.0
- 12. Hours Reactor Was Critical 744.0 2160.0 163476.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3774.5
- 14. Hours Generator On-Line 744.0 2160.0 160931.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 3736.2
- 16. Gross Thermal Energy Generated (MWH) 1893613.0 5497465.9 379688423.4
- 17. Gross Electrical Energy Generated (MWH) 629447.0 1830877.0 124601033.0
- 18. Net Electrical Energy Generated (MWH) 608218.0 1769724.0 118756328.0
- 19. Unit Service Factor 100.0% 100.0% 69.9%
- 20. Unit Availability Factor 100.0% 100.0% 71.5%
- 21. Unit Capacity Factor (Using MDC Net) 102.1% 102.3% 66.2%
- 22. Unit Capacity Factor (Using DER Net) 103.7% 104.0% 65.4%
- 23. Unit Forced Outage Rate 0.0% 0.0% 14.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
e Surry Monthly Operating Report No. 99-03 Page 4 of 18 OPERATING DATA REPORT Docket No.: 50-281 Date: 04/01/99 Completed By: R. Stief Telephone: (757) 365-2486
- 1. Unit Name: .......................................................... . Surry Unit 2
- 2. Reporting Period: ................................................ . March 1999
- 3. Licensed Thermal Power (MWt): ......................... . 2546
- 4. Nameplate Rating (Gross MWe): ........................ . 847.5
- 5. Design Electrical Rating (Net MWe): ................... . 788
- 6. Maximum Dependable Capacity (Gross MWe): .. . 840
- 7. Maximum Dependable Capacity (Net MWe): ...... . 801
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Year-To-Date Cumulative
- 11. Hours in Reporting Period 744.0 2160.0 227185.0
- 12. Hours Reactor Was Critical 744.0 2160.0 162070.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 328.1
- 14. Hours Generator On-Line 744.0 2160.0 160053.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1612656.8 5201600.3 378997249.3
- 17. Gross Electrical Energy Generated (MWH) 545360.0. 1750535.0 124298428.0
- 18. Net Electrical Energy Generated (MWH) 525041.0 1689742.0 118511769.0
- 19. Unit Service Factor 100.0% .100.0% 70.5%
- 20. Unit Availability Factor 100.0% 100.0% 70.5%
- 21. Unit Capacity Factor (Using MDC Net) 88.1% 97.7% 66.6%
- 22. Unit Capacity Factor (Using DER Net) 89.6% 99.3% 66.2%
- 23. Unit Forced Outage Rate 0.0% 0.0% 11.2%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, April 18, 1999, 36 Days
- 25. If Shut Down at End of Report Period, Estimated Date of Start-up:
- 26. Unit In Test Status (Prior to Commercial Operation):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
e Surry Monthly Operating Report No. 99-03 Page 5 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL TO OR GREATER THAN 20%)
REPORT MONTH: March 1999 Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)
E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
e Surry Monthly Operating Report No. 99-03 Page 6 of 18 UNIT SHUTDOWN AND POWER REDUCTION (EQUAL To OR GREATER THAN 20%)
REPORT MONTH: March 1999 Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. R. Pincus Telephone: (757) 365-2863 None during the Reporting Period (1) (2) (3)
F: Forced REASON: METHOD:
S: Scheduled A - Equipment Failure (Explain) 1 - Manual B Maintenance or Test 2 - Manual Scram C Refueling 3 - Automatic Scram D Regulatory Restriction 4 - Other (Explain)
E Operator Training & Licensing Examination F Administrative G Operational Error (Explain)
(4) (5)
Exhibit G - Instructions for Preparation of Data Entry Sheets Exhibit 1 - Same Source for Licensee Event Report (LER) File (NU REG 0161)
e e Surry Monthly Operating Report No. 99-03 Page 7 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-280 Unit Name: Surry Unit 1 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (MWe - Net) Day (Mwe - Net) 819 17 818 2 819 18 819 3 819 19 819 4 819 20 819 5 819 21 818 6 820 22 793 7 819 23 812 8 818 24 818 9 818 25 818 10 819 26 815 11 819 27 812 12 820 28 818 13 820 29 819 14 820 30 820 15 819 31 820 16 819 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
e e Surry Monthly Operating Report No. 99-03 Page 8 of 18 AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-281 Unit Name: Surry Unit 2 Date: 04/01/99 Completed by: J. S. Ashley Telephone: (757) 365-2161 MONTH: March 1999 Average Daily Power Level Average Daily Power Level Day (Mwe - Net) Day (Mwe - Net) 750 17 707 2 750 18 701 3 751 19 699 4 749 20 692 5 747 21 686 6 747 22 682 7 748 23 673 8 747 24 671 9 745 25 664 10 741 26 662 11 736 27 658 12 732 28 650 13 726 29 644 14 724 30 640 15 718 31 624 16 713 INSTRUCTIONS On this format, list the average daily unit power level in MWe - Net for each day in the reporting month. Compute to the nearest whole megawatt.
e Surry Monthly Operating Report No. 99-03 Page 9 of 18
SUMMARY
OF OPERATING EXPERIENCE MONTHNEAR: March 1999 The following chronological sequence by unit is a summary of operating experiences for this month that required load reductions or resulted in significant non-load related incidents.
UNIT ONE:
03/01/99 0000 Unit starts the month at 100% / 855 MWe.
03/21/99 2320 Removed waterbox "B" from service. Unit at 100% / 830 MWe.
03/23/99 0746 Returned waterbox "B" to service. Unit at 100% / 849 MWe.
03/31/99 2400 Unit finished the month at 100% / 850 MWe.
UNIT TWO:
03/01/99 0000 Unit started the month at 91.5% / 780 MWe. (Began cycle coast-down 02/24/99) 03/31/99 1653 Power lost to MSR control system. Unit at 76% / 765 MWe.
03/31/99 1654 Commenced unit ramp down to stabilize Tave/Tref. Unit at 76% / 765 MWe.
03/31/99 1700 Unit stable at 71 % / 615 MWe.
03/31/99 2027 Commenced return to service of MSRs. Unit at 71 % / 615 MWe.
03/31/99 2212 MSRs returned to service. Unit at 75% / 650 MWe.
03/31/99 2400 Unit finished the month at 76% / 660 MWe.
e Surry Monthly Operating Report No. 99-03 Page 10 of 18 FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 DCP 95-017 Design Change Package 04/24/98 (Safety Evaluation 98-050)
Design Change Package 95-017, "Emergency Diesel Generator (EDG) SV Relay Replacement/Surry/Units 1 & 2", replaced the existing "low ruggedness" EDG Field Flash Cut-Off Relays with new relays recommended by Engine Systems, Inc. to reduce contact chattering. The new relays meet Virginia Power's seismic requirements.
FS99-013 UFSAR Change Request 03/25/99 (Safety Evaluation 99-019)
This UFSAR Change documents the use of ASME Boiler and Pressure Vessel Code, Section Ill, Appendix F, "Rules for Evaluation of Service Loadings with Level D Service Limits", for evaluating isolated water filled containment penetrations that are potentially susceptible to over-pressurization during a Design Basis Accident.
e Surry Monthly Operating Report No. 99-03 Page 11 of 18 PROCEDURE OR METHOD OF OPERATION CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTHNEAR: March 1999 O-ECM-1509-03 Electrical Corrective Maintenance 03/11/99 (Safety Evaluation 99-014)
Electrical Corrective Maintenance Procedure, O-ECM-1509-03, "VOTES MOV Testing for Quarter Turn Valves", was revised to invoke administrative controls on the Service Water (SW) Motor Operated Valves (MOV) when one is taken out of service for MOV testing. This will maintain the capability to isolate the non-essential SW flowpaths affected by the inoperable valve.
LDS-SPS1/2 Vendor Procedure 03/17/99 (Safety Evaluation 99-016)
Vendor Procedure, LDS-SPS1/2, "Instructions for Valve Acoustic Leak Monitoring", was approved so that vendor technicians can perform leak monitoring on various secondary valves and traps using non-intrusive equipment provided by Leak Detection Services, Inc.
while Units 1 and 2 are in normal operation at or near full power.
e Surry Monthly Operating Report No. 99-03 Page 12 of 18 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR: March 1999 None during the Reporting Period
e Surry Monthly Operating Report No. 99-03 Page 13 of 18 CHEMISTRY REPORT MONTHNEAR: March 1999 Unit No. 1 Unit No. 2 Primary Coolant Analysis Max. Min. AvQ. Max. Min. AvQ.
Gross Radioactivity, µCi/ml 4.13E-1 2.37E-1 3.05E-1 1.70E-1 1.06E-1 1.46E-1 Suspended Solids, oom O.Q1 0.01 0.01 0.01 0.01 0.01 Gross Tritium, µCi/ml 8.67E-1 7.07E-1 8.01 E-1 3.86E-2 2.83E-2 3.38E-2 1131, µCi/ml 3.90E-4 2.70E-4 3.33E-4 8.75E-5 3.90E-5 6.98E-5 113111133 0.09 0.03 0.06 0.12 0.03 0.01 HvdroQen, cc/kQ 41 38.7 40 37.4 35 35.8 Lithium, oom 2.33 2.07 2.22 0.84 0.68 0.78 Boron - 10, ppm* 228.14 214.03 220.76 0.392 0.196 0.208 OxyQen, (DO), oom 0.005 0.005 0.005 0.005 0.005 0.005 Chloride, ppm 0.023 0.02 0.021 0.002 0.001 0.001 pH @ 25 degree Celsius 6.56 6.16 6.45 9.54 9.22 9.43
None
e e Surry Monthly Operating Report No. 99-03 Page 14 of 18 FUEL HANDLING UNITS 1&2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received ~er Shi~ment Number Number Enrichment Cask Activi!Y Dry Storage Cask TN 32-08 03/01/99 32 2EO LMODF6 3.5984 N/A 289 LMOESW 3.5996 281 LMOET8 3.6032 386 LMOERV 3.5890 2TO LMOK8R 3.5850 1T5 LMOK8M 3.5781 1T2 LMOK8B 3.5938 2T6 LMOK8U 3.5872 2T1 LMOK87 3.5799 2T7 LMOK8J 3.5826 1T9 LMOK8C 3.5882 W41 LM041Y 3.2030 OF4 LMOJGN 3.6106 W29 LM041A 3.2030 1T6 LMOK88 3.5810 2T5 LMOK8E 3.5836 1T8 LMOK85 3.5815 1T1 LMOK89 3.5985
e Surry Monthly Operating Report No. 99-03 Page 15 of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity W32 LM0412 3.2030 W20 LM040X 3.2030 1T4 LMOK8W 3.5883 2T4 LMOK8L 3.5936 1T7 LMOK86 3.5815 no LMOK8G 3.5945 2T8 LMOK8D 3.5964 2T3 LMOK8N 3.5968 1T3 LMOK8P 3.5856 2T2 LMOK8T 3.5952 OT9 LMOK85 3.5923 1S4 LMOESK 3.5980 1S2 LMOESU 3.5995 407 LMOAM6 3.6097
- Surry Monthly Operating Report No. 99-03 Page 16. of 18 FUEL HANDLING UNITS 1&2 MONTHNEAR: March 1999 New Fuel Number of New or Spent Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity Dry Storage Cask TN 32-09 03/01/99 32 4T4 LMOK9B 3.7977 N/A 4S5 LMOERL 3.5972 4SO LMOERQ 3.5955 4T3 LMOK9K 3.7880 5F3 LMOJHE 3.7926 5S7 LMOESS 3.5991 2F5 LMOJGK 3.5868 1F8 LMOJGG 3.6032 OF9 LMOJGP 3.5951 4F4 LMOJGV 3.7938 2S2 LMOERZ 3.5985 4S7 LMOERP 3.5974 2F8 LMOJG5 3.5857 2F4 LMOJGC 3.5961 OF5 LMOJG3 3.5995 1S3 LMOET6 3.5976 1S5 LMOET5 3.5991
- *Surry Monthly Operating Report No. 99-03 Page 17 of 18 FUEL HANDLING UNITS 1 &2 MONTH/YEAR: March 1999 New Fuel Number of New or Spent
- Shipment or Date Stored or Assemblies Assembly ANSI Initial Fuel Shipping Cask No. Received per Shipment Number Number Enrichment Cask Activity 4S2 LMOERM 3.5965 W48 LM041T 3.2030 OF1 LMOJGO 3.5973 OF2 LMOJG1 3.5860 OS9 LMOET1 3.5997 4F7 LMOJHK 3.7969 2F7 LMOJGL 3.5927 2F3 LMOJGA 3.5855 1FO LMOJG7 3.5960 3S4 LMOERJ 3.5993 3FO LMOJH5 3.7950 4T2 LMOK9A 3.7984 5S8 LMOESG 3.6000 5S3 LMOETO 3.5997 4T1 LMOK9E 3.7940
- Surry Monthly Operating Report No. 99-03 Page 18 of 18 DESCRIPTION OF PERIODIC TEST(S) WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR: March 1999 None during the Reporting Period