ML19007A113: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/03/2019
| issue date = 01/03/2019
| title = NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
| title = NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Welsch J M
| addressee name = Welsch J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| docket = 05000275, 05000323
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[see also::IR 05000323/2019301]]
See also: [[see also::IR 05000275/2019301]]


=Text=
=Text=
{{#Wiki_filter:January 3, 2019   Mr. James Welsch , Chief Nuclear Officer,  and Vice President, Nuclear Generation
{{#Wiki_filter:January 3, 2019
Pacific Gas and Electric Company
Mr. James Welsch, Chief Nuclear Officer,
Diablo Canyon Power Plant
  and Vice President, Nuclear Generation
P.O. Box 56, Mail Code 104/6
Pacific Gas and Electric Company
Avila Beach, CA
Diablo Canyon Power Plant
  93424  SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND  
P.O. Box 56, Mail Code 104/6
2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/201
Avila Beach, CA 93424
9301; 05000323/201
SUBJECT:         DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL
9 301  Dear Mr. Welsch: The purpose of this letter is to confirm the final arrangements for the upcoming operator
                  OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301;
licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.   The NRC has completed its review of the operator license applications submitted in connection
                  05000323/2019301
with this examination and separately provided a list of approved applicants to Mr. R. Fortier, Lead Examination Developer. Note that any examination waivers and applications denials
Dear Mr. Welsch:
have been addressed in separate correspondence.
The purpose of this letter is to confirm the final arrangements for the upcoming operator
  The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby authorizes you to administer the
licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.
written examination in accordance with NUREG
The NRC has completed its review of the operator license applications submitted in connection
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25 , 201 9. The NRC staff will administer the operating tests during the week of January 14 , 201 9. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG
with this examination and separately provided a list of approved applicants to Mr. R. Fortier,
-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG
Lead Examination Developer. Note that any examination waivers and applications denials have
-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817
been addressed in separate correspondence.
-200-1159.  
The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby
J. Welsch 2 Please contact your Chief Examiner, Clyde Osterholtz, at 817
authorizes you to administer the written examination in accordance with NUREG-1021,
-200-1269, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or
"Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25,
complete written examination and/or operating test) specified for each applicant.
2019. The NRC staff will administer the operating tests during the week of January 14, 2019.
  Sincerely,   /RA/   Vince nt G. Gaddy, Chief Operations Branch
This examination has undergone extensive review by my staff and representatives responsible
  Division of Reactor Safety
for licensed operator training at your facility. Based on this review, I have concluded that the
  Docket Nos.
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
: 50-275 and 50
validity. By administering this examination, you also agree that it meets NUREG-1021
-323 License Nos.
guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at
: DPR-80 and DPR
your facility. If you determine that this examination is not appropriate for licensing operators at
-82
your facility, do not administer the examination and contact me at 817-200-1159.
J. Welsch 3 DIABLO CANYON POWER PLANT, UNITS 1 AND
 
2 - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301; 05000323/2019301
J. Welsch                                   2
- DATED JANUARY 3 , 2019 DISTRIBUTION:
Please contact your Chief Examiner, Clyde Osterholtz, at 817-200-1269, if you have any
  Regional Administrator (Scott.Morris@nrc.gov) Deputy Regional Administrator (Mark.Shaffer@nrc.gov) DRS Director Acting (Ryan.Lantz@nrc.gov) DRS Deputy Director
questions or identify any errors or changes in the license level (RO or SRO) or type of
Acting (Geoff.Miller@nrc.gov
examination (partial or complete written examination and/or operating test) specified for each
) DRP Director (Anton.Vegel@nrc.gov)
applicant.
DRP Deputy Director (Michael.Hay@nrc.gov)
                                                Sincerely,
Regional Counsel (David.Cylkowski@nrc.gov)
                                                /RA/
RIV/ETA: OEDO (Aida.Rivera-Verona@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
                                                Vincent G. Gaddy, Chief
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
                                                Operations Branch
Project Manager (Balwant.Singal@nrc.gov)
                                                Division of Reactor Safety
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Docket Nos.: 50-275 and 50-323
RIV RSLO (Bill.Maier@nrc.gov
License Nos.: DPR-80 and DPR-82
) Licensing Assistant (Jennifer.Bridges@nrc.gov)
 
Acting Team Lead er, DRS/IPAT (Ray.Kellar@nrc.gov) Project Engineer, DRS/IPAT (Peter.Jayroe@nrc.gov)
 
RITS Coordinator (Marisa.Herrera@nrc.gov)
  ML19007A113
ACES (R4Enforcement.Resource@nrc.gov)
  SUNSI Review           ADAMS:           Non-Publicly Available Non-Sensitive Keyword:
Branch Chief, DRP/A (Mark.Haire@nrc.gov)
  By: CCO                 Yes No       Publicly Available     Sensitive
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
OFFICE         OB:SOE         C:OB
Project Engineer, DRP/A (Larry.Newman@nrc.gov)
NAME           COsterholtz   VGaddy
Senior Resident Inspector (Christopher.Newport@nrc.gov)
  SIGNATURE       /RA/           /RA/
Resident Inspector (John.Reynoso@nrc.gov)
DATE           01/03/19       01/03/19
Administrative Assistant (Madeleine.Arel@nrc.gov
)              ADAMS ACCESSION
NUMBER:  ML19007A113
  SUNSI Review
  ADAMS:   Non-Publicly Available
  Non-Sensitive Keyword: By: CCO  Yes    No Publicly Available
  Sensitive  OFFICE OB:SOE C:OB     NAME COsterholtz
  VGaddy    SIGNATURE /RA/ /RA/     DATE 01/03/19 01/03/19     OFFICIAL RECORD COPY
}}
}}

Latest revision as of 07:18, 20 October 2019

NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
ML19007A113
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/03/2019
From: Vincent Gaddy
Operations Branch IV
To: Welsch J
Pacific Gas & Electric Co
References
50-275/19-301, 50-323/19-301
Download: ML19007A113 (3)


See also: IR 05000275/2019301

Text

January 3, 2019

Mr. James Welsch, Chief Nuclear Officer,

and Vice President, Nuclear Generation

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL

OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301;

05000323/2019301

Dear Mr. Welsch:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Mr. R. Fortier,

Lead Examination Developer. Note that any examination waivers and applications denials have

been addressed in separate correspondence.

The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby

authorizes you to administer the written examination in accordance with NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25,

2019. The NRC staff will administer the operating tests during the week of January 14, 2019.

This examination has undergone extensive review by my staff and representatives responsible

for licensed operator training at your facility. Based on this review, I have concluded that the

examination meets the guidelines of NUREG-1021 for content, operational, and discrimination

validity. By administering this examination, you also agree that it meets NUREG-1021

guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at

your facility. If you determine that this examination is not appropriate for licensing operators at

your facility, do not administer the examination and contact me at 817-200-1159.

J. Welsch 2

Please contact your Chief Examiner, Clyde Osterholtz, at 817-200-1269, if you have any

questions or identify any errors or changes in the license level (RO or SRO) or type of

examination (partial or complete written examination and/or operating test) specified for each

applicant.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-275 and 50-323

License Nos.: DPR-80 and DPR-82

ML19007A113

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: CCO Yes No Publicly Available Sensitive

OFFICE OB:SOE C:OB

NAME COsterholtz VGaddy

SIGNATURE /RA/ /RA/

DATE 01/03/19 01/03/19