Line 1: Line 1:
#REDIRECT [[IR 05000275/2019301]]
{{Adams
| number = ML19007A113
| issue date = 01/03/2019
| title = NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Welsch J
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| contact person =
| case reference number = 50-275/19-301, 50-323/19-301
| document type = Letter, License-Operator, Part 55 Examination Related Material
| page count = 3
}}
See also: [[see also::IR 05000275/2019301]]
 
=Text=
{{#Wiki_filter:January 3, 2019
Mr. James Welsch, Chief Nuclear Officer,
and Vice President, Nuclear Generation
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6
Avila Beach, CA 93424
SUBJECT:          DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL
                  OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301;
                  05000323/2019301
Dear Mr. Welsch:
The purpose of this letter is to confirm the final arrangements for the upcoming operator
licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.
The NRC has completed its review of the operator license applications submitted in connection
with this examination and separately provided a list of approved applicants to Mr. R. Fortier,
Lead Examination Developer. Note that any examination waivers and applications denials have
been addressed in separate correspondence.
The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby
authorizes you to administer the written examination in accordance with NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25,
2019. The NRC staff will administer the operating tests during the week of January 14, 2019.
This examination has undergone extensive review by my staff and representatives responsible
for licensed operator training at your facility. Based on this review, I have concluded that the
examination meets the guidelines of NUREG-1021 for content, operational, and discrimination
validity. By administering this examination, you also agree that it meets NUREG-1021
guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at
your facility. If you determine that this examination is not appropriate for licensing operators at
your facility, do not administer the examination and contact me at 817-200-1159.
 
J. Welsch                                    2
Please contact your Chief Examiner, Clyde Osterholtz, at 817-200-1269, if you have any
questions or identify any errors or changes in the license level (RO or SRO) or type of
examination (partial or complete written examination and/or operating test) specified for each
applicant.
                                                Sincerely,
                                                /RA/
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket Nos.: 50-275 and 50-323
License Nos.: DPR-80 and DPR-82
 
 
ML19007A113
SUNSI Review            ADAMS:            Non-Publicly Available  Non-Sensitive Keyword:
  By: CCO                Yes  No        Publicly Available      Sensitive
OFFICE          OB:SOE        C:OB
NAME            COsterholtz    VGaddy
SIGNATURE      /RA/          /RA/
DATE            01/03/19      01/03/19
}}

Latest revision as of 07:18, 20 October 2019

NRC Initial Operator Licensing Examination Approval 05000275/2019301; 05000323/2019301
ML19007A113
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/03/2019
From: Vincent Gaddy
Operations Branch IV
To: Welsch J
Pacific Gas & Electric Co
References
50-275/19-301, 50-323/19-301
Download: ML19007A113 (3)


See also: IR 05000275/2019301

Text

January 3, 2019

Mr. James Welsch, Chief Nuclear Officer,

and Vice President, Nuclear Generation

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INITIAL

OPERATOR LICENSING EXAMINATION APPROVAL 05000275/2019301;

05000323/2019301

Dear Mr. Welsch:

The purpose of this letter is to confirm the final arrangements for the upcoming operator

licensing examinations at your Diablo Canyon Power Plant, Units 1 and 2.

The NRC has completed its review of the operator license applications submitted in connection

with this examination and separately provided a list of approved applicants to Mr. R. Fortier,

Lead Examination Developer. Note that any examination waivers and applications denials have

been addressed in separate correspondence.

The Nuclear Regulatory Commission (NRC) has approved the subject examinations and hereby

authorizes you to administer the written examination in accordance with NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors," Revision 11, on January 25,

2019. The NRC staff will administer the operating tests during the week of January 14, 2019.

This examination has undergone extensive review by my staff and representatives responsible

for licensed operator training at your facility. Based on this review, I have concluded that the

examination meets the guidelines of NUREG-1021 for content, operational, and discrimination

validity. By administering this examination, you also agree that it meets NUREG-1021

guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at

your facility. If you determine that this examination is not appropriate for licensing operators at

your facility, do not administer the examination and contact me at 817-200-1159.

J. Welsch 2

Please contact your Chief Examiner, Clyde Osterholtz, at 817-200-1269, if you have any

questions or identify any errors or changes in the license level (RO or SRO) or type of

examination (partial or complete written examination and/or operating test) specified for each

applicant.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-275 and 50-323

License Nos.: DPR-80 and DPR-82

ML19007A113

SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: CCO Yes No Publicly Available Sensitive

OFFICE OB:SOE C:OB

NAME COsterholtz VGaddy

SIGNATURE /RA/ /RA/

DATE 01/03/19 01/03/19