IR 05000305/2006001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML060610413 | | number = ML060610413 | ||
| issue date = 03/02/2006 | | issue date = 03/02/2006 | ||
| title = | | title = (EOC) Annual Assessment Letter (Report 05000305/2006001) | ||
| author name = Caldwell J | | author name = Caldwell J | ||
| author affiliation = NRC/RGN-III | | author affiliation = NRC/RGN-III | ||
| addressee name = Christian D | | addressee name = Christian D | ||
| addressee affiliation = Dominion Energy Kewaunee, Inc | | addressee affiliation = Dominion Energy Kewaunee, Inc | ||
| docket = 05000305 | | docket = 05000305 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:March 2, 2006 Mr. David Senior Vice President and | ||
Mr. David Senior Vice President and | |||
Chief Nuclear Officer | Chief Nuclear Officer | ||
Line 29: | Line 26: | ||
5000 Dominion Boulevard | 5000 Dominion Boulevard | ||
Glen Allen, VA 23060- | Glen Allen, VA 23060-6711SUBJECT:ANNUAL ASSESSMENT LETTER - KEWAUNEE POWER STATION (REPORT 05000305/2006001) | ||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
Line 66: | Line 61: | ||
design of the auxiliary feedwater system. You we re previously informed of this White finding in a letter dated September 16, 2005. | design of the auxiliary feedwater system. You we re previously informed of this White finding in a letter dated September 16, 2005. | ||
D. Christian-2- | D. Christian-2-While plant performance for the most recent quarter is within the Degraded Cornerstone column of the Action Matrix, there was an additional safety significant inspection finding affecting the | ||
While plant performance for the most recent quarter is within the Degraded Cornerstone column of the Action Matrix, there was an additional safety significant inspection finding affecting the | |||
first three quarters of the assessment cycle. This White finding within the Barrier Integrity | first three quarters of the assessment cycle. This White finding within the Barrier Integrity | ||
Line 112: | Line 106: | ||
last 9 months of the inspection plan are tentative and may be revised at the mid-cycle assessment review. | last 9 months of the inspection plan are tentative and may be revised at the mid-cycle assessment review. | ||
D. Christian-3- | D. Christian-3-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Ava ilable Records (PARS) component of NRC's document system, and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | Document Room or from the Publicly Ava ilable Records (PARS) component of NRC's document system, and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Line 121: | Line 114: | ||
any questions you may have regarding this letter or the inspection plan. | any questions you may have regarding this letter or the inspection plan. | ||
Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-305 License No. DPR-43 | Sincerely, | ||
/RA/James L. Caldwell Regional Administrator Docket No. 50-305 License No. DPR-43 Enclosure: Kewaunee Power Station Inspection/Activity Plan cc w/encl:M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing | |||
Kewaunee Power Station Inspection/Activity Plan cc w/encl:M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing | |||
and Operations Support | and Operations Support |
Revision as of 22:36, 13 July 2019
ML060610413 | |
Person / Time | |
---|---|
Site: | Kewaunee |
Issue date: | 03/02/2006 |
From: | Caldwell J NRC/RGN-III |
To: | Christian D Dominion Energy Kewaunee |
References | |
IR-06-001 | |
Download: ML060610413 (7) | |
Text
March 2, 2006 Mr. David Senior Vice President and
Chief Nuclear Officer
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711SUBJECT:ANNUAL ASSESSMENT LETTER - KEWAUNEE POWER STATION (REPORT 05000305/2006001)
Dear Mr. Christian:
On February 8, 2006, the NRC staff completed its performance review of Kewaunee Power Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter
and inspection results for the period from January 1 through December 31, 2005. The purpose
of this letter is to inform you of our assessm ent of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Exempt from Public Disclosure in
accordance with 10 CFR 2.390" will include the physical protection review and resultant
inspection plan.
Overall, Kewaunee Power Station operated in a manner that preserved public health and safety and met all cornerstone objectives with moderate degradation in safety performance. Plant
performance for the most recent quarter was within the Degraded Cornerstone Column of the
NRC's Action Matrix based on one Yellow finding within the Mitigating Systems cornerstone.
This Yellow finding involved the failure to provide adequate design control to ensure that Class I
equipment was protected against damage from tornado or seismic-induced flooding of the
turbine building.
On February 21, 2006, we were notified by your staff that your current reviews of corrective actions for the Yellow finding would be completed in the coming few weeks, which will support
an NRC supplemental inspection to review your ac tions taken. Therefore, we plan to conduct supplemental inspection 95002 beginning on May 1, 2006. This supplemental inspection will
also include a review of your actions taken as a result of a White finding associated with the
design of the auxiliary feedwater system. You we re previously informed of this White finding in a letter dated September 16, 2005.
D. Christian-2-While plant performance for the most recent quarter is within the Degraded Cornerstone column of the Action Matrix, there was an additional safety significant inspection finding affecting the
first three quarters of the assessment cycle. This White finding within the Barrier Integrity
cornerstone was associated with the inability to expeditiously close the containment hatch
during reactor vessel head replacement activities during the refueling outage in the fall of 2004.
A supplemental inspection 95001 was completed in September 2005, and the finding was
considered closed as of October 1, 2005.
In our mid-cycle assessment letter dated Augus t 30, 2005, we advised you of a substantive cross-cutting issue in the area of Problem Identification and Resolution (PI&R) involving
weaknesses in the corrective action program. The NRC staff continued to identify issues in
2005 that had a common performance theme of ineffe ctive corrective actions to resolve known deficiencies. Since the mid-cycle assessment letter, you submitted a November 14, 2005, revision to your previous March 18, 2005, commitment letter. In your November revision, you
committed to take additional actions to improve the overall effectiveness of your corrective actions program. However, the effectiveness of these corrective actions is still indeterminate.
As a result of our inspections, we determined because the Yellow finding associated with the turbine building flooding contained PI&R cross-cutting issue elements and we continued to
identify findings in the area of PI&R, the agency still considers corrective actions as an area of
concern at Kewaunee Power Station. Because the substantive cross-cutting issue in the area
of PI&R was previously identified in more t han two consecutive assessment letters, we request that you discuss your actions to address the l ong-standing substantive PI&R cross-cutting issue at the 2005 end-of-cycle assessment meeting scheduled for March 22, 2006.
The NRC plans to follow-up the substantive PI&R cross-cutting issue during the upcoming supplemental inspection 95002, and by performing the maximum allowable inspection samples
in accordance with IP 71152, "Identification and Resolution of Problems," Section 03.02,
"Selected Issue Follow-up Inspection."
The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2007. In addition, we plan on conducting a Component
Design Basis Inspection at your facility in early 2007. This inspection will also focus on the
implementation of your corrective action pr ogram, along with routine baseline inspection activities. The inspection plan is provided to allow for the resolution of any scheduling conflicts
and personnel availability issues well in advance of inspector arrival onsite. Routine resident
inspections are not listed due to their ongoing and continuous nature. The inspections in the
last 9 months of the inspection plan are tentative and may be revised at the mid-cycle assessment review.
D. Christian-3-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Ava ilable Records (PARS) component of NRC's document system, and is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Patrick Louden at 630-829-9627 with
any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/James L. Caldwell Regional Administrator Docket No. 50-305 License No. DPR-43 Enclosure: Kewaunee Power Station Inspection/Activity Plan cc w/encl:M. Gaffney, Site Vice President C. Funderburk, Director, Nuclear Licensing
and Operations Support
T. Breene, Manager, Nuclear Licensing
L. Cuoco, Esq., Senior Counsel
D. Zellner, Chairman, Town of Carlton
J. Kitsembel, Public Service Commission of Wisconsin
Mayor of Kewaunee
City Council President
Chair, Manitowoc County Board
County Executive
Chair, Kewaunee County Board
Director, Manitowoc County Emergency
Management Agency
Director, Kewaunee County Emergency
Management Agency
City Manager
Village President