ML062710352: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062710352
| number = ML062710352
| issue date = 09/20/2006
| issue date = 09/20/2006
| title = McGuire, Units 1 and 2, and Catawba, Units 1 and 2, Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations
| title = Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations
| author name = Morris J R
| author name = Morris J
| author affiliation = Duke Energy Carolinas, LLC, Duke Power Co
| author affiliation = Duke Energy Carolinas, LLC, Duke Power Co
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2006-15]]


=Text=
=Text=
{{#Wiki_filter:JAMES R. MORRIS Vice President, Nuclear Support Emnergy Nuclear Generation
{{#Wiki_filter:JAMES R. MORRIS Vice President, Nuclear Support Emnergy Nuclear Generation Duke Energy Corporation 526 South Church St.Charlotte, NC 28202 Mailing Address: EC07H / PO Box 1006 Charlotte, NC 28201-1006 September 20, 2006 704 382 6401 704 382 6056 fax james. morris@duke-energy.
Duke Energy Corporation
com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
526 South Church St.Charlotte, NC 28202 Mailing Address: EC07H / PO Box 1006 Charlotte, NC 28201-1006
Document Control Desk  
September  
 
20, 2006 704 382 6401 704 382 6056 fax james. morris@duke-energy.  
==Subject:==
com U. S. Nuclear Regulatory  
Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations On August 14, 2006, the NRC issued Regulatory Issue Summary (RIS) 2006-15,"Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected site-specific operator licensing examination schedules, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.Please direct any questions to L. B. Jones at (704) 382-4753.Very truly yours, James R. Morris Attachments www.duke-energ. .rnm r U. S. Nuclear Regulatory Commission September 20, 2006 Page 2 xc: W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan, Senior Project Manager (ONS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. F. Stang, Senior Project Manager (CNS & MNS)U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 D. W. Rich NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station A. T. Sabisch NRC Senior Resident Inspector Catawba Nuclear Station NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations.
Commission
Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX.AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
Washington, DC 20555-0001
FACILITY NRC REGION Oconee NOTE: Section A: ONS prepares operating exam / NRC Prepares Written (Only ONE exam each year.program would not let me modify the number in section "A" to denote split exam generation.
ATTENTION:  
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 1 1 1 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 9 12 10 10 OPERATORS NUMBER OF SENIOR REACTOR 24 4 OPERATORS  
Document Control Desk Subject: Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory  
Issue Summary 2006-15 Preparation  
and Scheduling  
of Operator Licensing  
Examinations
On August 14, 2006, the NRC issued Regulatory  
Issue Summary (RIS) 2006-15,"Preparation  
and Scheduling  
of Operator Licensing  
Examinations." The subject RIS requested  
an update to the NRC on projected  
site-specific  
operator licensing examination  
schedules, as well as the estimated  
numbers of applicants  
planning to take operator licensing  
examinations  
and the NRC's generic fundamentals  
examinations (GFEs).NRC Form 536, "Operator  
Licensing  
Examination  
Data" is attached as requested  
for Oconee, McGuire, and Catawba Nuclear Stations.Please direct any questions  
to L. B. Jones at (704) 382-4753.Very truly yours, James R. Morris Attachments
www.duke-energ. .rnm  
r U. S. Nuclear Regulatory  
Commission
September  
20, 2006 Page 2 xc: W. D. Travers, Regional Administrator
U. S. Nuclear Regulatory  
Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931
L. N. Olshan, Senior Project Manager (ONS)U.S. Nuclear Regulatory  
Commission
11555 Rockville  
Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738
J. F. Stang, Senior Project Manager (CNS & MNS)U. S. Nuclear Regulatory  
Commission
11555 Rockville  
Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738
D. W. Rich NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station A. T. Sabisch NRC Senior Resident Inspector Catawba Nuclear Station  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 08/31/2008
(8-2005) Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden OPERATOR LICENSING  
estimate to the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information
EX.AMINATION  
DATA and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information  
collection.
FACILITY NRC REGION Oconee NOTE: Section A: ONS prepares operating  
exam / NRC Prepares Written (Only ONE exam each year.program would not let me modify the number in section "A" to denote split exam generation.
A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 1 1 1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
1 1 1 1 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 9 12 10 10 OPERATORS NUMBER OF SENIOR REACTOR 24 4 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 4 4 4 4 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 4 4 4 4 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS  
-LIMITED PROPOSED DATES PRIMARY DATE 08/27/2007  
-LIMITED PROPOSED DATES PRIMARY DATE 08/27/2007 09/22/2008 09/29/2009 09/27/2010 ALTERNATE DATE 09/10/2007 09/29/2008 10/05/2009 10/04/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/3112008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations.
09/22/2008  
Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-000 , or by intemet e-mail to infocllects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
09/29/2009  
FACILITY NRC REGION McGuire Nuclear Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 6 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 2 3 3 3 OPERATORS  
09/27/2010
ALTERNATE  
DATE 09/10/2007  
09/29/2008  
10/05/2009  
10/04/2010
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE I NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 08/3112008
(8-2005) Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden estimate to the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.OPERATOR LICENSING  
Nuclear Regulatory  
Commission, Washington, DC 20555-000 , or by intemet e-mail to infocllects@nrc.gov, and to the Desk Officer, Office of Information
EXAMINATION  
DATA and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
collection.
FACILITY NRC REGION McGuire Nuclear Station 2 A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
1 1 1 1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 6 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 2 3 3 3 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 6 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 6 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS  
-LIMITED PROPOSED DATES PRIMARY DATE 03/19/2007  
-LIMITED PROPOSED DATES PRIMARY DATE 03/19/2007 05/05/2008 04/13/2009 04/19/2010 ALTERNATE DATE 03/26/2007 05/12/2008 04/20/2009 04/26/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 6 6 CANDIDATES NRC ORM 38 (-205) PINTE ONRECYLED APE NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations.
05/05/2008  
Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
04/13/2009  
FACILITY NRC REGION Catawba Nuclear Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 7 7 7 7 OPERATORS NUMBER OF SENIOR REACTOR 2 2 OPERATORS  
04/19/2010
ALTERNATE  
DATE 03/26/2007  
05/12/2008  
04/20/2009  
04/26/2010
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 6 6 CANDIDATES
NRC ORM 38 (-205) PINTE ONRECYLED  
APE NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 08/31/2008
(8-2005) Estimated  
burden per response to comply with this voluntary  
information
collection  
request: 1 hour. This information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments regarding  
burden OPERATOR LICENSING  
estimate to the Records and FOIA/Privacy  
Services Branch (T-5 F53), U.S.Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by internet EXAMINATION  
DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory  
Affairs, NEOB-10202, (3150-0131), Office of Management  
and Budget, Washington, DC 20503. If a means used to impose an information
collection  
does not display a currently  
valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information  
collection.
FACILITY NRC REGION Catawba Nuclear Station 2 A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED  
NUMBER OF LICENSEE-PREPARED
EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 7 7 7 7 OPERATORS NUMBER OF SENIOR REACTOR 2 2 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS  
-INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS  
-LIMITED 0 0 PROPOSED DATES PRIMARY DATE 12/03/2007  
-LIMITED 0 0 PROPOSED DATES PRIMARY DATE 12/03/2007 12/01/2008 12/07/2009 12/06/2010 ALTERNATE DATE 12/10/2007 12/08/2008 12/14/2009 12/13/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 8 0 0 0 8 0 0 0 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER}}
12/01/2008  
12/07/2009  
12/06/2010
ALTERNATE  
DATE 12/10/2007  
12/08/2008  
12/14/2009  
12/13/2010
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 8 0 0 0 8 0 0 0 CANDIDATES
NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER
}}

Revision as of 11:20, 13 July 2019

Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations
ML062710352
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 09/20/2006
From: Morris J
Duke Energy Carolinas, Duke Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-06-015
Download: ML062710352 (5)


Text

JAMES R. MORRIS Vice President, Nuclear Support Emnergy Nuclear Generation Duke Energy Corporation 526 South Church St.Charlotte, NC 28202 Mailing Address: EC07H / PO Box 1006 Charlotte, NC 28201-1006 September 20, 2006 704 382 6401 704 382 6056 fax james. morris@duke-energy.

com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:

Document Control Desk

Subject:

Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations On August 14, 2006, the NRC issued Regulatory Issue Summary (RIS) 2006-15,"Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected site-specific operator licensing examination schedules, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.Please direct any questions to L. B. Jones at (704) 382-4753.Very truly yours, James R. Morris Attachments www.duke-energ. .rnm r U. S. Nuclear Regulatory Commission September 20, 2006 Page 2 xc: W. D. Travers, Regional Administrator U. S. Nuclear Regulatory Commission, Region II Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303-8931 L. N. Olshan, Senior Project Manager (ONS)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. F. Stang, Senior Project Manager (CNS & MNS)U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 D. W. Rich NRC Senior Resident Inspector Oconee Nuclear Station J. B. Brady NRC Senior Resident Inspector McGuire Nuclear Station A. T. Sabisch NRC Senior Resident Inspector Catawba Nuclear Station NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EX.AMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.

FACILITY NRC REGION Oconee NOTE: Section A: ONS prepares operating exam / NRC Prepares Written (Only ONE exam each year.program would not let me modify the number in section "A" to denote split exam generation.

A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 1 1 1 1 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 9 12 10 10 OPERATORS NUMBER OF SENIOR REACTOR 24 4 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 4 4 4 4 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 08/27/2007 09/22/2008 09/29/2009 09/27/2010 ALTERNATE DATE 09/10/2007 09/29/2008 10/05/2009 10/04/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/3112008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-000 , or by intemet e-mail to infocllects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION McGuire Nuclear Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 6 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 2 3 3 3 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 6 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS

-LIMITED PROPOSED DATES PRIMARY DATE 03/19/2007 05/05/2008 04/13/2009 04/19/2010 ALTERNATE DATE 03/26/2007 05/12/2008 04/20/2009 04/26/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 6 6 CANDIDATES NRC ORM 38 (-205) PINTE ONRECYLED APE NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.

Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Catawba Nuclear Station 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 7 7 7 7 OPERATORS NUMBER OF SENIOR REACTOR 2 2 OPERATORS

-INSTANT NUMBER OF SENIOR REACTOR 3 OPERATORS

-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED 0 0 PROPOSED DATES PRIMARY DATE 12/03/2007 12/01/2008 12/07/2009 12/06/2010 ALTERNATE DATE 12/10/2007 12/08/2008 12/14/2009 12/13/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 8 0 0 0 8 0 0 0 CANDIDATES NRC FORM 536 (8-2005)PRINTED ON RECYCLED PAPER