ML062860343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML062860343
| number = ML062860343
| issue date = 10/11/2006
| issue date = 10/11/2006
| title = Fermi Unit 1 Master Inspection Plan - Fiscal Year (Fy) 2007
| title = Master Inspection Plan - Fiscal Year (Fy) 2007
| author name = Cameron J L
| author name = Cameron J
| author affiliation = NRC/RGN-III/DNMS/DB
| author affiliation = NRC/RGN-III/DNMS/DB
| addressee name = Cobb D K
| addressee name = Cobb D
| addressee affiliation = Detroit Edison
| addressee affiliation = Detroit Edison
| docket = 05000016
| docket = 05000016

Revision as of 10:27, 13 July 2019

Master Inspection Plan - Fiscal Year (Fy) 2007
ML062860343
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/11/2006
From: Jamnes Cameron
NRC/RGN-III/DNMS/DB
To: Cobb D
Detroit Edison
References
Download: ML062860343 (2)


Text

October 11, 2006Mr. Donald K. CobbAssistant Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI UNIT 1 MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2007

Dear Mr. Cobb:

In accordance with NRC Manual Chapter 2561, "Decommissioning Power Reactor InspectionProgram," the NRC Region III staff and management have developed a Master Inspection Plan(MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2006 through September 2007 (FY2007). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities. Because the FY2007 MIP is based, in part, on your proposed schedule of significantdecommissioning activities for FY2007, the plan and the focus of NRC inspection activities maychange to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2007 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the FermiUnit 1 FY2007 MIP. We currently project the Region will conduct two inspections at Fermi Unit 1 during FY2007.The following is a list of the inspection procedures we expect to use during our inspections.

The specific procedures used during each inspection will depend on the specificdecommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant. InspectionProcedureInspection Procedure TitleIP 36801Organization, Management and Cost Controls IP 37801Safety Reviews, Design Changes, and Modifications IP 40801Self-Assessment, Auditing, and Corrective Action IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750Solid Radioactive Waste Management and Transportation of Radioactive Materials D. Cobb-2-In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

.We will gladly discuss any questions you may have regarding these inspection plans. If youhave questions, please contact Dr. Peter Lee of my staff at (630) 829-9870.Sincerely,/RA/Jamnes L. Cameron, ChiefDecommissioning BranchDocket No. 05000016License No. DPR-9cc:N. Peterson, Director, Nuclear LicensingD. Pettinari, Legal Department Compliance Supervisor L. Goodman, Manager, Fermi 1 G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State PoliceDistribution

Docket File C. M. Craig, NMSS T. Smith, NMSS RIII Enf. Coordinator SRI Fermi RIII PRR CAC (e-mail) DOCUMENT NAME:E:\Filenet\ML062860343.wpdXPublicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEPJLee:mbWGSnellJLCameronDATE10/05/0610/11/0610/11/06OFFICIAL RECORD COPY