|
|
Line 3: |
Line 3: |
| | issue date = 10/21/2016 | | | issue date = 10/21/2016 |
| | title = Request for Withholding Information from Public Disclosure (CAC Nos. MF7193 and MF7194) | | | title = Request for Withholding Information from Public Disclosure (CAC Nos. MF7193 and MF7194) |
| | author name = Pickett D V | | | author name = Pickett D |
| | author affiliation = NRC/NRR/DORL/LPLI-1 | | | author affiliation = NRC/NRR/DORL/LPLI-1 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000247, 05000286 | | | docket = 05000247, 05000286 |
| | license number = DPR-026, DPR-064 | | | license number = DPR-026, DPR-064 |
| | contact person = Pickett D V, NRR/DORL/LPL1-1, 415-1364 | | | contact person = Pickett D, NRR/DORL/LPL1-1, 415-1364 |
| | case reference number = CAC MF7193, CAC MF7194 | | | case reference number = CAC MF7193, CAC MF7194 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
Line 24: |
Line 24: |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| By letter dated July 7, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 16197A172), as supplemented by letter dated October 6, 2016 (ADAMS Accession No. ML 16291A547), Entergy Nuclear Operations, Inc. submitted an affidavit (CAW-16-4473) dated September 19, 2016, executed by Mr. James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: Attachment 2 to NL-16-113 | | By letter dated July 7, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16197A172), as supplemented by letter dated October 6, 2016 (ADAMS Accession No. ML16291A547), Entergy Nuclear Operations, Inc. submitted an affidavit (CAW-16-4473) dated September 19, 2016, executed by Mr. James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: Attachment 2 to NL-16-113 |
| -Supplemental Proprietary Response to Request for Additional Information Regarding Conditional Exemption from End-Of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement A nonproprietary version of the above document (Attachment 1 of the letter dated October 6, 2016), has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS under Accession No. ML 16291A547. | | -Supplemental Proprietary Response to Request for Additional Information Regarding Conditional Exemption from End-Of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement A nonproprietary version of the above document (Attachment 1 of the letter dated October 6, 2016), has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS under Accession No. ML16291A547. |
| The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)(ii)(a) | | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)(ii)(a) |
| (4)(ii)(c) | | (4)(ii)(c) |
Line 44: |
Line 44: |
| If you have any questions regarding this matter, please contact me at (301) 415-1364 or Douglas.Pickett@nrc.gov. | | If you have any questions regarding this matter, please contact me at (301) 415-1364 or Douglas.Pickett@nrc.gov. |
| Sincerely, IRA/ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company LLC 1000 Westinghouse Drive Building 3, Suite 310 Cranberry Township, PA 16066 Additional Distribution via Listserv DISTRIBUTION: | | Sincerely, IRA/ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company LLC 1000 Westinghouse Drive Building 3, Suite 310 Cranberry Township, PA 16066 Additional Distribution via Listserv DISTRIBUTION: |
| PUBLIC LPL1-1 R/F RidsNrrPMlndianPoint RidsNrrDorllpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrDssSrxb Resource ADAMS Accession No.: ML 16211A059 RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource JBorromeo, SRXB OFFICE NRR/DORULPLl-1/PM N RR/DORL/LPLl-1 | | PUBLIC LPL1-1 R/F RidsNrrPMlndianPoint RidsNrrDorllpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrDssSrxb Resource ADAMS Accession No.: ML16211A059 RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource JBorromeo, SRXB OFFICE NRR/DORULPLl-1/PM N RR/DORL/LPLl-1 |
| /LA NRR/DSS/SRXB/BC NRR/DORULPL 1-1/BC(A) | | /LA NRR/DSS/SRXB/BC NRR/DORULPL 1-1/BC(A) |
| NAME DPickett PBlechman for KGoldstein EOesterle RGuzman DATE 08/03/16 08/01/16 10/20/16 10/21/16 OFFICIAL RECORD COPY}} | | NAME DPickett PBlechman for KGoldstein EOesterle RGuzman DATE 08/03/16 08/01/16 10/20/16 10/21/16 OFFICIAL RECORD COPY}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
|
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] Category:Proprietary Information Review
MONTHYEARML21060B6022021-03-11011 March 2021 Request for Withholding Information from Public Disclosure ML20184A0012020-07-0606 July 2020 Request for Withholding Information from Public Disclosure ML20026A0012020-02-11011 February 2020 Request for Withholding Information from Public Disclosure ML20012H1732020-01-13013 January 2020 Request for Withholding Information from Public Disclosure ML18171A0462018-06-29029 June 2018 Request for Withholding Information from Public Disclosure (Westinghouse) ML18171A0342018-06-29029 June 2018 Request for Withholding Information from Public Disclosure (Holtec) ML17316A0022017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML17316A0012017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML17316A0002017-11-27027 November 2017 Request for Withholding Information from Public Disclosure (CAC Nos. MF8991 and MF8992; EPID: L-2016-LLA-0039) ML16211A0592016-10-21021 October 2016 Request for Withholding Information from Public Disclosure ML16020A2192016-02-17017 February 2016 Request for Withholding Information from Public Disclosure for Indian Point Unit Nos. 2 and 3 ML15288A1402015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15288A4022015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15288A2122015-12-0404 December 2015 Request for Withholding Information from Public Disclosure ML15230A4102015-09-19019 September 2015 Request for Withholding Information from Public Disclosure ML15083A0792015-04-17017 April 2015 Request for Withholding Information from Public Disclosure for Shutdown Margin Confirmation ML14217A2062014-08-14014 August 2014 Respect for Withholding Information from Public Disclosure ML14119A0732014-06-18018 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML14139A3592014-06-17017 June 2014 Issuance of Amendments Request for Withholding Information from Public Disclosure ML14139A3962014-06-17017 June 2014 Request for Withholding Information from Public Disclosure ML13298A7082013-11-13013 November 2013 Request for Withholding Information from Public Disclosure Regarding License Amendment Request Concerning Pressure-Temperature Limits and Low Temperature Over-Pressure Protection Requirements for Indian Point Nuclear Generating Unit No. 2 ( ML12150A3832012-06-25025 June 2012 Request for Withholding Information from Public Disclosure (TAC Nos. ME1671, ME1672, and L24299) ML12153A1962012-06-25025 June 2012 Request for Withholding Information from Public Disclosure ML1134001842012-01-13013 January 2012 Request for Withholding Information from Public Disclosure ML1130703802011-12-0505 December 2011 Request for Withholding Information from Public Disclosure (TAC Nos. ME1671, ME1672, and L24299) ML1127701542011-10-31031 October 2011 Request for Withholding Information from Public Disclosure (TAC ME1671, ME1672, and L24299) ML1001908342010-01-22022 January 2010 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Extension of Orders Approving Indirect Transfer of Control of Licenses (TAC Nos. ME2515 Through ME2522) ML0930206032009-11-12012 November 2009 Request for Withholding Information from Public Disclosure ML0736500192008-01-0707 January 2008 Entergy Nuclear Operations, Inc.-Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MC6185) ML0727500322007-10-11011 October 2007 Entergy Nuclear Operations, Inc. - Request for Withholding Information from Public Disclosure for Indirect Transfer of Control of Licenses (TAC Nos. MD6178 Through MD6185) ML0610703002006-04-20020 April 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Indian Point Nuclear Generating Unit No. 2 ML0508101892005-03-23023 March 2005 (IP3), Withholding from Public Disclosure, Polestar-prepared Calculation, Psat 3056CT.QA.04, Calculation of Indian Point 3 Engineered Safety Feature Component Leakage Iodine Release with Boundary Layer Effect, Rev. 1 ML0426703652004-09-23023 September 2004 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0411400692004-04-23023 April 2004 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0320200092003-07-21021 July 2003 Withholding from Public Disclosure, Wcobra/Trac Computer Code and Related Material ML0316209792003-06-11011 June 2003 Caldon, Inc., Request for Withholding Information from Public Disclosure. ML0304501082003-02-13013 February 2003 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Indian Point, Unit No. 2 ML0303101292003-01-31031 January 2003 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure ML0232905142002-11-25025 November 2002 Westinghouse Electric Company, Request for Additional Information for Withholding from Public Disclosure for Indian Point Nuclear Generating Unit 3 ML0232904732002-11-25025 November 2002 Caldon, Inc., Request for Withholding Information from Public Disclosure for Indian Point Nuclear Generating Unit No. 3 ML0220507412002-08-15015 August 2002 Request for Withholding Information in Westinghouse WCAP-15902-P, Rev. 0 from Public Disclosure 2021-03-11
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 21, 2016 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR CONDITIONAL EXEMPTION FROM END-OF-LIFE MODERATOR TEMPERATURE COEFFICIENT MEASUREMENT (CAC NOS. MF7193 AND MF7194)
Dear Sir or Madam:
By letter dated July 7, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16197A172), as supplemented by letter dated October 6, 2016 (ADAMS Accession No. ML16291A547), Entergy Nuclear Operations, Inc. submitted an affidavit (CAW-16-4473) dated September 19, 2016, executed by Mr. James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, requesting that information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390: Attachment 2 to NL-16-113
-Supplemental Proprietary Response to Request for Additional Information Regarding Conditional Exemption from End-Of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement A nonproprietary version of the above document (Attachment 1 of the letter dated October 6, 2016), has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the NRC Library in ADAMS under Accession No. ML16291A547.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)(ii)(a)
(4)(ii)(c)
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product. The NRC staff has reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the aforementioned document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, the NRC may send copies of this information to its consultants working in this area. The NRC will ensure that its consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, the NRC should be promptly notified.
The NRC may revisit this determination in the future if, for example, the scope of a Freedom of Information Act request includes this information.
The NRC will notify you in advance of any public disclosure if the NRC makes such a determination.
If you have any questions regarding this matter, please contact me at (301) 415-1364 or Douglas.Pickett@nrc.gov.
Docket Nos. 50-247 and 50-286 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company LLC 1000 Westinghouse Drive Building 3, Suite 310 Cranberry Township, PA 16066 Additional Distribution via Listserv Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation The NRC staff has reviewed your submittal and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, has determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the aforementioned document marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, the NRC may send copies of this information to its consultants working in this area. The NRC will ensure that its consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, the NRC should be promptly notified.
The NRC may revisit this determination in the future if, for example, the scope of a Freedom of Information Act request includes this information.
The NRC will notify you in advance of any public disclosure if the NRC makes such a determination.
If you have any questions regarding this matter, please contact me at (301) 415-1364 or Douglas.Pickett@nrc.gov.
Sincerely, IRA/ Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: Mr. James A. Gresham Manager, Regulatory Compliance Westinghouse Electric Company LLC 1000 Westinghouse Drive Building 3, Suite 310 Cranberry Township, PA 16066 Additional Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 R/F RidsNrrPMlndianPoint RidsNrrDorllpl1-1 Resource RidsNrrLAKGoldstein Resource RidsNrrDssSrxb Resource ADAMS Accession No.: ML16211A059 RidsRgn1 MailCenter Resource RidsACRS_MailCTR Resource JBorromeo, SRXB OFFICE NRR/DORULPLl-1/PM N RR/DORL/LPLl-1
/LA NRR/DSS/SRXB/BC NRR/DORULPL 1-1/BC(A)
NAME DPickett PBlechman for KGoldstein EOesterle RGuzman DATE 08/03/16 08/01/16 10/20/16 10/21/16 OFFICIAL RECORD COPY