NL-16-113, Supplemental Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (Eol) Moderator Temperature Coefficient (Mtc) Measurement
ML16291A547 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 10/06/2016 |
From: | Vitale A Entergy Nuclear Northeast |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16291A553 | List: |
References | |
CAC MF7193, CAC MF7194, NL-16-113 | |
Download: ML16291A547 (14) | |
Text
- -Entergx
- ~=~*
Entergy Nuclear Northeast 450 Broadway, GSB Indian Point Energy Center P.O. Box249 Buchanan, NY 10511-0249 Tel 914 254 6700 Anthony J. Vitale Site Vice President NL-16-113 October 6, 2016 U.S. Nuclear Regulatory Gommission ATTN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738 SUBJECT Supplemental Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (EOL)
Moderator Temperature Coefficient (MTC) Measurement (CAC Nos. MF-7193 and MF-7194)
Indian Point Unit Numbers 2, and 3 .
Docket Nos. 50-24 7 and 50-286 License Nos. DPR-26 and DPR-64
REFERENCES:
- 1. Entergy Letter NL-15-144 to NRC Regarding License Amendment Request
- Conditional Exemption from End-of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement, dated December 10, 2015.
- 2. Entergy Letter NL-16-027 to NRC Regarding Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement, dated March 2, 2016.
- 3. Entergy Letter NL-16-068 to NRC Regarding Response to Request for Additional Information Related to License Amendment Request Regarding Conditional Exemption from End-of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement, dated July 7, 2016.
Dear Sir or Madam:
The purpose of this letter is to respond to NRC comments during a phone call on September 14, 2016.
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) requested a License Amendment for Indian Point No.2 (IP2), Operating License DPR-26, Docket No. 50-247, and for Indian Point No .3 (IP3), Operating License DPR-64, Docket No. 50-286 in Reference 1.
This was supplemented in References 2 and 3. The NRC advised that the Westinghouse practice of withholding the name of the plant using a specific methodology created a problem writing a safety.evaluation since the plant name would be used which would violate
NL-16-113 Docket Nos. 50-247 and 50-286 Page 2 of 2 proprietary requests. Accordingly, the information submitted in Reference 3 has been revised to address the NRC concern.
The License Amendment Request proposed to change the near-end of life (EOL) Moderator Temperature Coefficient (MTC) Surveillance Requirement (SR) 3.1.3.2 and Specification 5.6.5 for Indian Point Units 2 and 3 by plaeing a set of conditions on reactor core operation, which if met, would allow exemption from the required MTC measurement. Attachments 1 and 2 (Attachment 2 is marked as proprietary and it is requested, as supported by the Enclosed Affidavit, that the material in Attachment 2 be withheld from public disclosure pursuant to 10 CFR 2.390(b)(4)) provide the revised response to the request for additional information previously submitted in Reference 3. There are no additional changes to the TS pages from those submitted in Reference 2.
In accordance with 10 CFR 50.91 (b)(1 ), "State Consultation," a copy of this letter and its associated Attachments is being provided to the designated New York State officials.
This letter contains no new NRC commitments. Should you have any* questions concerning this letter, or require additional information, please contact Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.
I declare und,e~nalty of perjury that the foregoing is true and correct. Executed on October Jo , 2016.
Sincerely, AJV/sp
Attachment:
- 1. Supplemental Response to Request for Additional Information regarding Conditional Exemption from End-of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement
- 2. Supplemental PROPRIETARY Response to Request for Additional Information regarding Conditional Exemption from End-of-Life (EOL)
Moderator Temperature Coefficient (MTC) Measurement.
Enclosure:
Application for Withholding Proprietary Information from Public Disclosure cc: ' Mr. Douglas Picket, Senior Project Manager, NRC NRA DORL .
Mr. Daniel H. Dorman, Regional Administrator, NRC Region 1 NRC Resident Inspector's Office Mr. John B. Rhodes, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service
ATTACHMENT 1 TO NL-16-113 SUPPLEMENTAL RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING CONDITIONAL EXEMPTION FROM END-OF-LIFE (EOL) MODERATOR TEMPERATURE COEFFICIENT (MTC}
MEASUREMENT ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286
Attachment 1 NL-16-113 Docket Nos. 50-247 and 50-286 Page 1 of 3 Response to Request for Additional Information Regarding Conditional Exemption from End-Of-Life (EOL) Moderator Temperature Coefficient (MTC) Measurement NRC Question In the application of December 10, 2015, as supplemented, the licensee stated *that a comparison of PARAGON/ANG, without the application of the intermediate NEXUS code, would result in similar calculated values since NEXUS automates multiple PARAGON lattice transport calculations to generate a suite of cross-sections for ANC calculation. Since the licensee is seeking approval for use of the end of life moderator temperature coefficient (EOL MTC) Exemption Methodology with PARAGON, the Nuclear* Regulatory Commission staff is asking the licensee to provid~ additional justification for this statement by providing the results for PARAGON for the same benchmarking data points provided in the licensee's letter dated December 10, 2015, Attachment 5, Table 1 of the Beaver Valley Power Station request for additional information Question 2.
In lieu of providing additional benchmarking results, a more detailed justification could be provided on-how the results of the benchmarking of PHOENIX-P to PARAGON in the NRC approved methodologyWCAP-16045 and the results of the benchmarking of PARAGON to NEXUS in the NRC approved methodology WCAP-16045 1-A can be used to support the use of PARAGON for the EOL MTC Exemption Methodology.
Entergy Response It is the expert opinion of Westinghouse that all the code systems used by Westinghouse, in core design analysis, predict comparable MTC parameters. Therefore, a more detailed justification for the use of PARAGON is provided to address this request for additional information (RAI) question in lieu of providing additional benchmarking results.
- The nomenclature for this response is based on the nomenclature used in WCAP-16045-P-A, Addendum 1. This addendum 1,.1tilizes the boron letdown (BL) nomenclature to signify the cross sections created using a cycle specific boron letdown curve. This will be used throughout the response to signify when cross sections are created utilizing a cycle specific boron letdown curve.
PARAGON can be used both with and without utilizing the cycle specific boron letdown methodology. When a cycle specific boron letdown curve is not used it is referred to as NEXUS.
PHOENIX-P is only utilized with the cycle specific boron letdown curve method.
All the industrial core design code systems are founded on a two-step approach. The first step entails using a two-dimensional transport based lattice physics code to generate the two-group data that will be used in the second step to simulate the three-dimensional core using diffusion theory.
The methodology of how the data is tabulated by the lattice code differs from package to package but has one common "reproducibility rule which is the ability to reproduce the lattice results in all conditions (nominal and off-nominal) by the nodal code. If the same single two-dimensional assembly case was modelled both in the lattice and the nodal code (using the tabulated data from the lattice code), the results of the simulations must be comparable for all conditions (especially the conditions not directly included in the tabulation points). The two-group data tabulation covers all possible conditkms that an assembly will see in its lifetime during the operation of the reactor core.
. I I
I Attachment 1 NL-16-113 Docket Nos. 50-247 and 50-286 Page 2 of 3 The underlying physics governing the reactor simulations is basically confined in the lattice code and the nodal code. The way the data is communicated between the two codes is a common mathematical process that would not affect the resu_lts as long as the reproducibility rule is adopted.
The overall acceptability of the current code sets used by Westinghouse have been accepted in the ANG, PHOENIX-P, and PARAGON WCAPs.
Currently, Westinghouse uses three code packages for core design applications, namely:
PHOENIX-P/ANC(BL), where PHOENIX-P is the lattice code and ANC(BL) is the nodal code.
using the boron letdown methodology for the two-group data tabulation. This is the code system used initially to license the end of life (EOL) moderator temperature coeffiCient (MTG) exemption methodology~ The boron letdown methodology utilizes a cycle specific boron letdown curve when developing the steady state cross section set for use in the nodal code.
PARAGON/ANC(BL), where PARAGON is the lattice code and the same ANC(BL) nodal code with the same boron letdown tabulation methodology as the PHOENIX-P/ANC(BL) system. The only difference in this case is the lattice code. This code system was proved to be equivalent to PHOENIX-P/ANC(BL) in the topical report WCAP-16045-P-A. Table 4-16 of the WCAP-16045-P-A shows how the EOL MTG predictions of the two codes (PARAGON and PHOENIX-P) are very similar and the Table 4-3 of the same report shows also the similarity of the hot zero power (HZP) isothermal temperature coefficients (ITC) values of the two codes.
NEXUS/ANG, where the system uses the same PARAGON lattice code and the same nodal code ANG as the previous system (PARAGON/ANC(BL)). The difference between PARAGON/ANC(BL) and NEXUS/ANG resides in the way the two-group data are tabulated.
NEXUS system is based on the once-through cross section methodology, where the cross sections (and other parameters) are generated upfront once for the entire lifetime of an assembly. All cross sections and physics parameter lattice code calculations in the NEXUS code are completed by PARAGON. The overall tabulation style is different between NEXUS/ANG and PARAGON/ANC(BL) but the same lattice code is used to determine cross sections and other physics parameters. The tabulation style differences do not affect the calculation of the moderator temperature coefficient (MTG) by ANG. The once-through and boron letdown methodologies are proved to be equivalent in the topical report WCAP-16045-P-A, Addendum 1. Table 19 of this topical report shows a comparison of the ITC and MTG predictions of the two systems.
Since the ANG nodal code is common to the three code systems, then any difference in the MTG predictions between the three systems should result from the differences in the lattice codes of these systems, e.g. PHOENIX-P and PARAGON.
PHOENIX-P and PARAGON share many modules that make them similar. The main components that affect the physics of these codes are compared in the following sections:
a,c
Attachment 1 NL-16-113 Docket Nos. 50-247 and 50-286 Page 3 of 3 a,c
[ ]8'c This can be explained by the fact that MTC is a differential parameter and.the calculation of MTC is performed by a small incremental perturbation of the fuel and coolant temperatures, thus the differential term is not expected to be affected by [ ]a,c It has been shown in Table 1 of the BVPS RAI question 2 response that PHOENIX-P/ANC(BL) and NEXUS/ANG have an equivalent behavior for the important characteristics pertinent to WCAP-13749-P-A. [ ]a,c This data shows- a similar statistical and predictive profile between PARAGON and PHOENIX-P .
based ANC(BL) models making it an acceptable substitute for PHOENIX-Pin regards to WCAP-13749-P-A. .
Table 19 of WCAP-16045-P-A, Addendum 1 shows BOC.HZP ITC values for several cycles. The overall predictive M-P shows a very comparable difference between NEXUS/ANG and PARAGON/ANC(BL). PARAGON/ANC(BL) compares favorably through both methodology and results comparison with either PHOENIX-P/ANC(BL) or NEXUS/ANG. Both PHOENIX-P/ANC(BL) and NEXUS/ANG have been accepted for use with EOL MTG exemption WCAP-13749-P-A. The overall comparable results between PHOENIX-P/ANC(BL), PARAGON/ANC(BL), and NEXUS/ANG make any of the code packages used by Westinghouse suitable for use with EOL MTC exemption' WCAP-13749-P-A. .
)
- From the above discussion, it can be concluded that for EOL MTC calculations, PHOENIX-P and PARAGON predictions are-indistinguishable. NEXUS/ANG is already proved similar in EOL MTC parameters to PHOENIX-P/ANC(BL) in Table 1 of the original BVPS RAI question 2 response. If PARAGON/ANC(BL) (instead of NEXUS/ANG) was used in Table 1 of the BVPS RAI question 2, it would lead to the same conclusion that PARAGON/ANC(BL) and PHOENIX-P/ANC(BL) predict similar EOL MTC parameters as discussed in the WCAP-13749-P-A licensed methodology.
References
- 1. H. Matsumoto, M. Ouisloumen and T. Takeda, "Development of Spatially Dependent Resonance Shielding Method," J.Nucl.Sci.Technol.vol.42, No.8 pp.688-694(2005).
ENCLOSURE TO NL-16-068 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286
Westinghouse Non-Proprietary Class 3
@Westinghouse . Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township,. Pennsylvania 16066 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-4643 Document Control Desk - Direct fax: (724) 940-8560 11555 Rockville Pike e-mail: greshaja@westinghouse.com Rockville, MD 20852 CAW-16-4473 September 19, 2016 APPLICATION FOR WITIIBOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
CE-16-325, Rev. 1, Attachment I, "Request for Additional Information (RAJ) Response Clarification on NEXUS and PARAGON Differences for Indian Point EOL MTC Elimination" (Proprietary)
- The Application for Withholding 1.'roprietaiy Information from Public Disclosure is submitted by Westinghouse Electric Company LLC (Westinghouse), pursuant to the provisions of paragraph (b)(l) of Section 2.390 of the Commission's regulations. It contains commercial strategic infonnation proprietary to Westinghouse and customarily held in confidence.
- The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-16-4473 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The Affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
Accordingly, .this letter authorizes the utilization of the accompanying Affidavit by Entergy Nuclear Operations, Inc.
Correspondence with respect to the proprietary aspects of the Application for Withholding or the Westinghouse Affidavit should reference CAW-16-4473, and should be addressed to James A. Gresham, Manager, Regulatory Compliance, Westinghouse Electric Company, 1000 Westinghouse Drive, Building 3 Suite 310, Cranberry Township, Pennsylvania 16066.
~W-James A. Gresham, Manager Regulatory Compliance
© 2016 Westinghouse Electric Company LLC. All Rights Reserved.
CAW-16-4473 September 19, 2016 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
SS COUNTY OF BUTLER:
I, James A. Gresham, am authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief.
ifames A. Gresham, Manager Regulatory Compliance
2 CAW-16-4473 (1) I am Manager, Regulatory Compliance, Westinghouse Electric Company LLC (Westinghouse),
and as such, I have been specifically delegated the* function of reviewing the proprietary information sought to be withheld from public disclosure in conn~ction with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse Application for Withholding Proprietary Information from Public Disclosure accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitute Westinghouse policy and provide the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspec~ of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a
- competitive economic advantage over other companies.
3 CAW-16-4473 (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method~ etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, producti9n capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(iii) There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways .. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense. .
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component
4 CAW-16-4473 may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
'(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse* in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse ca}lacity ,to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iv) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, is to be received in confidence by the Commission.
(v) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(vi) The proprietary information sought to be withheld in this submittal is that whi~h is appropriately marked in CE-16-325, Rev. 1, Attachment 1, "Request for Additional Information (RAJ) Response Clarification on NEXUS and PARAGON Differences for Indian Point EOL MTC Elimination" (Proprietary), for submittal to the Commission, being transmitted by Entergy Nuclear Operations, Inc. letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted by Westinghouse is that associated with Entergy Nuclear Operations, Inc. request for NRC approval of Indian Point Units 2 and 3 Docket Nos. 50-247 and 50-286 License Amendment Request NL-15-144 Conditional Exemption from End-of-Life Moderator Temperature Coefficient (MTC) Measurement, and may be used only for that purpose.
5 CAW-16-4473 (a) This information is part of that which will enable Westinghouse to assist Entergy Nuclear Operations, Inc. obtain NRC approval of Indian Point Units 2 and 3 Docket Nos. 50-247 and 50-286 License Amendment Request NL-15-144 Conditional Exemption from End-of-Life Moderator Temperature Coefficient (MTC) Measurement.
(b) . Further, this information has substantial commercial value as follows:
(i) Westinghouse plans to sell the use of similar information to its customers for the purpose of End-of-Life Moderator Temperature Coefficient (MTC) Measurement.
(ii) Westinghouse can sell support and defense of industry guidelines and acceptance criteria for plant-specific applications.
(iii) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The d:evelopment of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and non-proprietary versions of a document, furnished to the NRC associated with Entergy Nuclear Operations, Inc. request for NRC approval of Indian Point Units 2 and 3 Docket Nos. 50-247 and 50-286 License Amendment Request "Conditional Exemption from End-of-Life Moderator Temperature Coefficient (MTC) Measurement" (submitted in NL-15-144) and may be used only for that purpose.
In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the Affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(l).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice.* The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for.its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document roo~ as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.