IR 05000397/2019301: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML18145A231 | ||
| issue date = | | issue date = 05/29/2018 | ||
| title = NRC Examination | | title = Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 | ||
| author name = | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Sawatzke B | | addressee name = Sawatzke B | ||
| addressee affiliation = Energy Northwest | | addressee affiliation = Energy Northwest | ||
| docket = 05000397 | | docket = 05000397 | ||
| license number = | | license number = NPF-021 | ||
| contact person = | | contact person = | ||
| case reference number = | | case reference number = 50-397/2019-01 | ||
| document report number = 50-397/ | | document report number = 50-397/OL-2019 | ||
| document type = Letter, License-Operator Examination | | document type = Letter, License-Operator, Part 55 Examination Related Material | ||
| page count = | | page count = 5 | ||
}} | }} | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:May 29, 2018 | ||
==SUBJECT:== | |||
ERRATA FOR COLUMBIA GENERATING STATION -NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301 | |||
==Dear Mr. Sawatzke:== | |||
April 30, 2018 | |||
==SUBJECT:== | |||
COLUMBIA GENERATING STATION-NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301 | |||
Dear | |||
}} | }} |
Revision as of 05:43, 17 June 2019
ML18145A231 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 05/29/2018 |
From: | Vincent Gaddy Operations Branch IV |
To: | Sawatzke B Energy Northwest |
References | |
50-397/2019-01 50-397/OL-2019 | |
Download: ML18145A231 (5) | |
Similar Documents at Columbia | |
---|---|
Category:Letter
MONTHYEARGO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024
[Table view]Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 2024-09-24 Category:License-Operator MONTHYEARIR 05000397/20253012024-02-14014 February 2024
[Table view]Notification of NRC Initial Operator Licensing Examination 05000397/2025301 ML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17094A5682017-02-16016 February 2017 NRC Initial Operator Licensing Examination Approval 05000397/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 2024-02-14 Category:Part 55 Examination Related Material MONTHYEARIR 05000397/20253012024-02-14014 February 2024
[Table view]Notification of NRC Initial Operator Licensing Examination 05000397/2025301 ML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14163A4792014-05-29029 May 2014 Voluntary Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML13056A5202013-02-12012 February 2013 2013-02- Exam Performance Analysis ML13084A1092013-02-0808 February 2013 Generation Station-2013-02-Draft Operating Test Comments 2024-02-14 |
Inspection Report - Columbia - 2019301 (Operator Exams) | |
---|---|
Text
May 29, 2018
SUBJECT:
ERRATA FOR COLUMBIA GENERATING STATION -NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301
Dear Mr. Sawatzke:
April 30, 2018
SUBJECT:
COLUMBIA GENERATING STATION-NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301
Dear