MONTHYEARML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results ML17094A5682017-02-16016 February 2017 NRC Initial Operator Licensing Examination Approval 05000397/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14163A4792014-05-29029 May 2014 Voluntary Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations 2023-03-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23115A3552023-03-0909 March 2023 10-CGS-2023-02 Post Exam Comments ML23115A3562023-03-0909 March 2023 11-CGS-2023-02 Public Forms IR 05000397/20213012021-04-21021 April 2021 NRC Exam Report 05000397/2021301 ML21113A0062021-03-0404 March 2021 CG-2021-02-FINAL Outlines ML21098A1692021-03-0404 March 2021 CG-2021-02-FINAL Operating Test ML21098A1702021-03-0404 March 2021 CG-2021-02-FINAL Written Examination ML21098A1712021-03-0404 March 2021 CG-2021-02-Post Exam Submittal ML21113A0072021-03-0404 March 2021 CG-2021-02-Public Forms, Exam Assignment Tickler ML21113A0032021-03-0404 March 2021 CG-2021-02-Draft Outlines ML21113A0042021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam Comments ML21113A0052021-03-0404 March 2021 CG-2021-02-DRAFT Written Exam ML21113A0002021-03-0404 March 2021 CG-2021-02-DRAFT Op Test Comments ML21113A0012021-03-0404 March 2021 CG-2021-02-DRAFT Op Test ML21113A0022021-03-0404 March 2021 CG-2021-02-DRAFT Outline Comments ML20108F0522020-04-16016 April 2020 Notification of NRC Initial Operator Licensing Examination 05000397/2021301 ML18145A2312018-05-29029 May 2018 Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17081A5342017-03-0909 March 2017 9-Columbia-2017-02 Final Operating Test ML17100A3992017-03-0909 March 2017 11-COLUMBIA-2017-02 Public Forms ML17081A5352017-03-0909 March 2017 10-Columbia-2017-02 Post-Exam Comments ML17081A5422017-03-0909 March 2017 6-COLUMBIA-2017-02 Draft Operating Test Comments ML17081A5372017-03-0909 March 2017 1-COLUMBIA-2017-02 Draft Outlines ML17081A5402017-03-0909 March 2017 4-COLUMBIA-2017-02 Draft Written Exam Comments ML17081A5412017-03-0909 March 2017 5-Columbia-2017-02 Draft Operating Test ML17081A5432017-03-0909 March 2017 7-COLUMBIA-2017-02 Final Outlines ML17081A5332017-03-0909 March 2017 8-Columbia-2017-02 Final Written Exam ML17081A5392017-03-0909 March 2017 3-COLUMBIA-2017-02 Draft Written Exam ML17081A5382017-03-0909 March 2017 2-Columbia-2017-02 Draft Outline Comments ML17048A3562017-02-17017 February 2017 Generic Fundamentals Examination Results GO2-16-106, Voluntary Response to Regulatory Issue Summary 2016-092016-07-13013 July 2016 Voluntary Response to Regulatory Issue Summary 2016-09 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15167A1332015-05-13013 May 2015 2015-04 Post Exam Comments Analysis ML15183A0512015-05-0505 May 2015 2015-04 Public Forms ML15167A1502015-05-0505 May 2015 2015-04 Final Outlines ML15167A1492015-05-0505 May 2015 2015-04 Draft Op Test Comments ML15167A1472015-05-0505 May 2015 2015-04 Draft Written Exam Comments ML15167A1452015-05-0505 May 2015 2015-04 - Draft Outline Comments ML15167A1442015-05-0505 May 2015 2015-04 Draft Outlines ML15167A1402015-05-0505 May 2015 2015-04 Draft Op Test ML15167A1382015-05-0505 May 2015 2015-04 Draft Written Exams ML15167A1232015-05-0505 May 2015 2015-04 Final Written Exams ML15167A1272015-05-0505 May 2015 2015-04 Final Op Test ML15167A1282015-05-0505 May 2015 2015-04 As-given Op Test Files ML15111A0662015-04-21021 April 2015 Examination Approval 05000397/2015301 ML14345A3302014-12-11011 December 2014 Announcement of the Generic Fundamentals Section of the Written Operator Licensing Examinations for 2015 ML14163A4792014-05-29029 May 2014 Voluntary Response to Regulatory Issue Summary (RIS) 2014-05, Preparation and Scheduling of Operator Licensing Examinations ML13056A5202013-02-12012 February 2013 2013-02- Exam Performance Analysis ML13084A1362013-02-0808 February 2013 CG-2013-02-Public Form ML13084A1092013-02-0808 February 2013 Generation Station-2013-02-Draft Operating Test Comments 2023-03-09
[Table view] |
Text
ES-301 RO NRC ADMIN Topic Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:
April 2015 Examination Level: RO X SRO Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*
M, R Main Turbine change of load rate determination Conduct of Operations P, R Alternate determination of drywell identified leak Conduct of Operations rate D, R Determine FPC-P-1A clearance order requirements Equipment Control N, R Determine Radiological posting requirements Radiation Control Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 SRO NRC ADMIN Topic Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:
April 2015 Examination Level: RO SRO X Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*
P, D, R Based on plant conditions and pull sheets supplied, Conduct of Operations determine early criticality will occur and then determine required procedural actions.
M, R Based on plant conditions, determine if Voluntary Conduct of Operations Entry into AIA is allowable.
M, R Determination of Operating Point and required Equipment Control action following feedwater heater trip.
D, R Estimate Main Condenser air ejector gross gamma Radiation Control activity and determine required actions.
M, R Given a QEDPS, determine that a General Emergency Emergency should be declared and complete a Procedures/Plan Classification Notification Form for the declaration.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Columbia Date of Examination: April, 2015 Exam Level: RO SRO-I SRO-U Operating Test No.: ______1_______
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function S1. Reduce RPV pressure with DEH; BPV fail in Auto - take manual N, A, L, S 3 control. (241000A4.02) The task is to lower RPV pressure to 550 psig at 50 psig per minute with DEH in automatic. DEH does not open the bypass valves in auto. The operator then takes manual control of bypass valves to lower RPV pressure.
(LO001780) - Performed by the RO, SRO-I and SRO-U S2. Restore power to RPS-B. (212000A4.14) The task is to restore M, A, L, S 7 power and reset RPS-B. The B MG set is found not to be operable and power is then supplied from alternate power source.
(LO001779) Performed by the RO, SRO-I and SRO-U S3. Given a LOCA and reactor scram have occurred. HPCS is N, L, EN, S 4 currently injecting. RPV level is -130 and slowly trending down. The task is to use RHR-A and return RPV level to given band. When injection with RHR-A begins, the pump will start to cavitate. The operator will take action and secure RHR-P-2A. Injection with a different ECCS system will then be attempted but that systems injection valve will not open. Injection with a third ECCS system will then be attempted and RPV level will be returned to desired level band.
(LO001815) Performed by the RO, SRO-I and SRO-U S4. Transfer SL-31 to SL-21 from SM-3 (262001A4.01) Perform M, S 6 procedure and when the transfer is made the supply breaker does not auto trip but can be tripped manually.
(LO001781) Performed by the RO and SRO-I
S5. Start RRC-P-1B at power (202001A4.01) Performs procedure and D, A, S 1 when RRC-P-1B is started, its speed does not stop increasing. The operator will trip RRC-P-1B per the immediate operator action of ABN-POWER.
(LO001642) Performed by the RO and SRO-I S6. Align SSW to the FPC HX (233000A2.08) The task is to align D, P, S 9 service water to both Fuel Pool Cooling heat exchangers following a complete loss of RCC.
(LO001756) Performed by the RO and SRO-I S7. Swap RCC pumps (Partial loss of RCC) (400000A2.01) The task is N, A, S 8 start RCC-P-1B and stop RCC-P-1C. RCC-P-1B starts normally but when RCC-P-1C is stopped, RCC-P-1B trips leaving only one operating RCC pump. Actions per ABN-RCC are then performed to secure and isolate RWCU.
(LO001806) Performed by the RO C1. Emergency Drywell Venting per PPM 5.5.15. (223001A4.07) The D, C, R, E, EN 5 task is to vent the Drywell with Standby Gas Treatment train B.
(LR000161) Performed by RO and SRO-I
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1. Prevent a RCIC High Exhaust Pressure trip. (217000 A2.02) D, E, EN, L, P, 2 During a station blackout, performs the actions of PPM 5.6.2 R required to prevent a high exhaust pressure trip and a high area temperature isolation of the RCIC system.
(LR000218) Performed by the RO, SRO-I and SRO-U P2. Reset the HPCS DG mechanical overspeed trip. (264000A4.04) D, R 6 The task is to reset the mechanical overspeed trip on the HPCS diesel generator.
(LR001563) Performed by the RO and SRO-I P3. Respond to CR HVAC High Radiation. (288000A2.02) During D, E, A, R 9 isolation of the Northwest Remote Air Intake, one of the valves cannot be closed which then requires removal of a fuse to complete isolation the intake path.
(LO001595) Performed by the RO, SRO-I and SRO-U All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 Actual - 5 / 4 / 3 (C)ontrol room Actual - 1 / 1 / 0 (D)irect from bank 9/8/4 Actual - 6 / 6 / 2 (E)mergency or abnormal in-plant 1/1/1 Actual - 2 / 2 / 2 (EN)gineered safety feature - / - / 1 (control room system) Actual - 3 /3 /2 (L)ow-Power / Shutdown 1/1/1 Actual - 4 / 4 / 4 (N)ew or (M)odified from bank including 1(A) 2/2/1 Actual - 5 / 4 / 3 (P)revious 2 exams 3 / 3 / 2 (randomly selected) Actual - 2 / 2 / 1 (R)CA 1/1/1 Actual - 3 / 3 / 3 (S)imulator Actual - 7 / 6 / 3