ML15167A150

From kanterella
Jump to navigation Jump to search
2015-04 Final Outlines
ML15167A150
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/05/2015
From: Vincent Gaddy
Operations Branch IV
To:
Energy Northwest
References
Download: ML15167A150 (38)


Text

ES-301 RO NRC ADMIN Topic Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:

April 2015 Examination Level: RO X SRO Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*

M, R Main Turbine change of load rate determination Conduct of Operations P, R Alternate determination of drywell identified leak Conduct of Operations rate D, R Determine FPC-P-1A clearance order requirements Equipment Control N, R Determine Radiological posting requirements Radiation Control Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 SRO NRC ADMIN Topic Outline Form ES-301-1 Facility: Columbia Generating Station Date of Examination:

April 2015 Examination Level: RO SRO X Operating Test Number: 1 Administrative Topic Type Describe activity to be performed (see Note) Code*

P, D, R Based on plant conditions and pull sheets supplied, Conduct of Operations determine early criticality will occur and then determine required procedural actions.

M, R Based on plant conditions, determine if Voluntary Conduct of Operations Entry into AIA is allowable.

M, R Determination of Operating Point and required Equipment Control action following feedwater heater trip.

D, R Estimate Main Condenser air ejector gross gamma Radiation Control activity and determine required actions.

M, R Given a QEDPS, determine that a General Emergency Emergency should be declared and complete a Procedures/Plan Classification Notification Form for the declaration.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Columbia Date of Examination: April, 2015 Exam Level: RO SRO-I SRO-U Operating Test No.: ______1_______

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function S1. Reduce RPV pressure with DEH; BPV fail in Auto - take manual N, A, L, S 3 control. (241000A4.02) The task is to lower RPV pressure to 550 psig at 50 psig per minute with DEH in automatic. DEH does not open the bypass valves in auto. The operator then takes manual control of bypass valves to lower RPV pressure.

(LO001780) - Performed by the RO, SRO-I and SRO-U S2. Restore power to RPS-B. (212000A4.14) The task is to restore M, A, L, S 7 power and reset RPS-B. The B MG set is found not to be operable and power is then supplied from alternate power source.

(LO001779) Performed by the RO, SRO-I and SRO-U S3. Given a LOCA and reactor scram have occurred. HPCS is N, L, EN, S 4 currently injecting. RPV level is -130 and slowly trending down. The task is to use RHR-A and return RPV level to given band. When injection with RHR-A begins, the pump will start to cavitate. The operator will take action and secure RHR-P-2A. Injection with a different ECCS system will then be attempted but that systems injection valve will not open. Injection with a third ECCS system will then be attempted and RPV level will be returned to desired level band.

(LO001815) Performed by the RO, SRO-I and SRO-U S4. Transfer SL-31 to SL-21 from SM-3 (262001A4.01) Perform M, S 6 procedure and when the transfer is made the supply breaker does not auto trip but can be tripped manually.

(LO001781) Performed by the RO and SRO-I

S5. Start RRC-P-1B at power (202001A4.01) Performs procedure and D, A, S 1 when RRC-P-1B is started, its speed does not stop increasing. The operator will trip RRC-P-1B per the immediate operator action of ABN-POWER.

(LO001642) Performed by the RO and SRO-I S6. Align SSW to the FPC HX (233000A2.08) The task is to align D, P, S 9 service water to both Fuel Pool Cooling heat exchangers following a complete loss of RCC.

(LO001756) Performed by the RO and SRO-I S7. Swap RCC pumps (Partial loss of RCC) (400000A2.01) The task is N, A, S 8 start RCC-P-1B and stop RCC-P-1C. RCC-P-1B starts normally but when RCC-P-1C is stopped, RCC-P-1B trips leaving only one operating RCC pump. Actions per ABN-RCC are then performed to secure and isolate RWCU.

(LO001806) Performed by the RO C1. Emergency Drywell Venting per PPM 5.5.15. (223001A4.07) The D, C, R, E, EN 5 task is to vent the Drywell with Standby Gas Treatment train B.

(LR000161) Performed by RO and SRO-I

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1. Prevent a RCIC High Exhaust Pressure trip. (217000 A2.02) D, E, EN, L, P, 2 During a station blackout, performs the actions of PPM 5.6.2 R required to prevent a high exhaust pressure trip and a high area temperature isolation of the RCIC system.

(LR000218) Performed by the RO, SRO-I and SRO-U P2. Reset the HPCS DG mechanical overspeed trip. (264000A4.04) D, R 6 The task is to reset the mechanical overspeed trip on the HPCS diesel generator.

(LR001563) Performed by the RO and SRO-I P3. Respond to CR HVAC High Radiation. (288000A2.02) During D, E, A, R 9 isolation of the Northwest Remote Air Intake, one of the valves cannot be closed which then requires removal of a fuse to complete isolation the intake path.

(LO001595) Performed by the RO, SRO-I and SRO-U All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 Actual - 5 / 4 / 3 (C)ontrol room Actual - 1 / 1 / 0 (D)irect from bank 9/8/4 Actual - 6 / 6 / 2 (E)mergency or abnormal in-plant 1/1/1 Actual - 2 / 2 / 2 (EN)gineered safety feature - / - / 1 (control room system) Actual - 3 /3 /2 (L)ow-Power / Shutdown 1/1/1 Actual - 4 / 4 / 4 (N)ew or (M)odified from bank including 1(A) 2/2/1 Actual - 5 / 4 / 3 (P)revious 2 exams 3 / 3 / 2 (randomly selected) Actual - 2 / 2 / 1 (R)CA 1/1/1 Actual - 3 / 3 / 3 (S)imulator Actual - 7 / 6 / 3