ML18348A420: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000275, 05000323
| docket = 05000275, 05000323
| license number = DPR-080, DPR-082
| license number = DPR-080, DPR-082
| contact person = Singal B K, 301-415-3016
| contact person = Singal B, 301-415-3016
| case reference number = EPID L-2018-LRM-0074
| case reference number = EPID L-2018-LRM-0074
| document type = Meeting Summary
| document type = Meeting Summary
Line 27: Line 27:
OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)
OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)
On November 29, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Company (PG&E, the licensee).
On November 29, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Company (PG&E, the licensee).
The purpose of the meeting was to discuss the proposed exemption request to withdraw funds from Nuclear Decommissioning Trusts (NDTs} to fund decommissioning planning activities at Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 18311 A 187. A copy of the presentation slides is located at ADAMS Accession No. ML 18333A 109. Enclosed is a list of attendees.
The purpose of the meeting was to discuss the proposed exemption request to withdraw funds from Nuclear Decommissioning Trusts (NDTs} to fund decommissioning planning activities at Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18311A187. A copy of the presentation slides is located at ADAMS Accession No. ML18333A109. Enclosed is a list of attendees.
The licensee provided the following brief description of the proposed exemption request:
The licensee provided the following brief description of the proposed exemption request:
* PG&E currently plans to operate DCPP until expiration of the current operating licenses (November 2024 for Unit 1 and August 2025 for Unit 2), which provides a long lead time of approximately 6 years to plan the decommissioning activities.
* PG&E currently plans to operate DCPP until expiration of the current operating licenses (November 2024 for Unit 1 and August 2025 for Unit 2), which provides a long lead time of approximately 6 years to plan the decommissioning activities.
Line 62: Line 62:
OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)
OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)
DATED DECEMBER 31, 2018 DISTRIBUTION:
DATED DECEMBER 31, 2018 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorllpl4 Resource RidsNrrLAPBlechman Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource ABowers, NRR Jlamb, NRR Jlarsen, RIV SHarwell, NRR Kleis, NRR JHickman, NMSS GJohnston, NRR CCook, OEDO RIV LBurkhart, OEDO NRR ADAMS A ccess,on N os.: M f N ' ML 18311A187 S ee mg ot,ce: ' ummarv: ML 18348A420 * . *1 via e-ma1 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DLP/PFPB/BC NAME BSingal PBlechman ABowers DATE 12/18/18 12/18/18 12/13/18 OFFICE N RR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli BSingal DATE 12/28/18 12/31/18 OFFICIAL RECORD COPY}}
PUBLIC RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorllpl4 Resource RidsNrrLAPBlechman Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource ABowers, NRR Jlamb, NRR Jlarsen, RIV SHarwell, NRR Kleis, NRR JHickman, NMSS GJohnston, NRR CCook, OEDO RIV LBurkhart, OEDO NRR ADAMS A ccess,on N os.: M f N ' ML18311A187 S ee mg ot,ce: ' ummarv: ML18348A420 * . *1 via e-ma1 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DLP/PFPB/BC NAME BSingal PBlechman ABowers DATE 12/18/18 12/18/18 12/13/18 OFFICE N RR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli BSingal DATE 12/28/18 12/31/18 OFFICIAL RECORD COPY}}

Revision as of 18:52, 14 June 2019

11/29/18, Summary of Meeting with Pacific Gas & Electric Co. to Discuss Exemption Request to Withdraw Funds from the Nuclear Decommissioning Trusts to Fund Decommissioning Planning Activities at Diablo Canyon Nuclear Power Plant
ML18348A420
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/31/2018
From: Balwant Singal
Plant Licensing Branch IV
To:
Pacific Gas & Electric Co
Singal B, 301-415-3016
References
EPID L-2018-LRM-0074
Download: ML18348A420 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 31, 2018 LICENSEE:

Pacific Gas and Electric Company FACILITY:

Diablo Canyon Nuclear Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)

On November 29, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Company (PG&E, the licensee).

The purpose of the meeting was to discuss the proposed exemption request to withdraw funds from Nuclear Decommissioning Trusts (NDTs} to fund decommissioning planning activities at Diablo Canyon Nuclear Power Plant, Units 1 and 2 (DCPP). The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML18311A187. A copy of the presentation slides is located at ADAMS Accession No. ML18333A109. Enclosed is a list of attendees.

The licensee provided the following brief description of the proposed exemption request:

  • PG&E currently plans to operate DCPP until expiration of the current operating licenses (November 2024 for Unit 1 and August 2025 for Unit 2), which provides a long lead time of approximately 6 years to plan the decommissioning activities.
  • Based on a 2017 decommissioning cost estimate, PG&E believes that planning activities executed prior to permanent shutdown will cost approximately

$187 .8 million. Additionally, PG&E asserts that early planning would reduce the duration of decommissioning and also cost by approximately

$166.1 million. The planning activities will include NRC licensing actions, permitting, engineering design, procurement, and detailed executable work plans.

  • According to PG&E, the funds collected in the NDTs are intended to cover decommissioning costs required by Title 10 of the Code of Federal Regulations (10 CFR}, Section 50.75, "Reporting and recordkeeping for decommissioning planning," 10 CFR 50.54(bb ), ~nd applicable California law, specifically:

o NRC license termination costs (including decommissioning planning activities)

(10 CFR 50.75); o Spent fuel management costs (10 CFR 50.54(bb));

and o Site restoration costs (pursuant to applicable California law).

  • PG&E stated that, as of December 2017, the total customer-funded DCPP NDTs total approximately

$3.17 billion. The NRC regulation at 1 O CFR 50.82(a)(8)(ii) limits the use of NOT funds for radiological decommissioning planning activities to 3 percent of the generic minimum decommissioning amount, which totals approximately

$37.2 million. This amount cannot be used for spent fuel management or site restoration activities, including planning, necessitating the need for an exemption.

  • PG&E described the special circumstances and stated that the proposed exemption request will meet the requirements of 10 CFR 50.12, "Specific exemptions." PG&E also stated that the delayed decommissioning planning will result in increased cost to PG&E customers.
  • PG&E intends to request the approval of the exemption request by June 2019. The NRC staff clarified the following related to the exemption request:
  • While PG&E states that funding for radiological decommissioning, spent fuel management, and site restoration have been collected and are comingled in the DCPP NDTs, based on the apparent method of NOT accounting and the information provided to the NRC in prior decommissioning funding status reports, an exemption request is required to use DCPP NOT funds for any purpose other than radiological decommissioning.
  • Based on the review of the 2017 DCPP decommissioning funding status reports, and in consideration of NOT aggregate total provided in the presentation, the DCPP NDTs appear to be fully funded to cover the costs associated with radiological decommissioning of the facility.
  • The NRC staff reiterated and PG&E confirmed that decommissioning planning does not include physical work.
  • The exemption request should clearly identify the purpose of the NOT funds, and, specify that the purpose of the exemption request is only for the withdrawal of funds for decommissioning planning activities, including planning associated with spent fuel management and site restoration.

A separate exemption will be needed for withdrawing DCPP NOT funds for any purpose other than radiological decommissioning. Public Comments Bruce Lacy, a consultant on nuclear decommissioning, made the following comments on behalf of The Utility Reform Network (TURN) and stated that TURN supports PG&E's proposed decommissioning exemption request for DCPP and encourages the NRC to favorably review the request. As an organization representing consumer interests, TURN believes adequate and appropriate advance planning before final shutdown and commencement of decommissioning can materially improve both cost and schedule performance of decommissioning with the benefit of better use of decommissioning funds. Mr. Lacy stated that experience at other sites supports this view. PG&E's proposal is to change the timing, not the amount, of spending on planning and preparation for decommissioning.

This change in timing provides the opportunity to reduce the ultimate total cost of decommissioning.

The opportunity for this change in timing is made possible by the advance notice of final shutdown, an opportunity not to be wasted. Mr. Lacy further stated that in parallel with supporting PG&E's decommissioning exemption request to the NRC, TURN is supporting a request by PG&E before the California Public Utilities Commission (CPUC) to establish special accounting to track these planning and preparation costs and subject them to regular reasonableness reviews by the CPUC. No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-3016 or via e-mail at Balwant.Singal@nrc.gov.

Docket Nos. 50-275 and 50-323

Enclosure:

List of Attendees cc: Listserv ~Os,~~ Balwant K. Singal, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM NUCLEAR DECOMMISSIONING TRUSTS FOR DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 U.S. Nuclear Regulatory Commission Angel Moreno, Office of Congressional Affairs* John Hickman, Office of Nuclear Material Safety and Safeguards Anthony Bowers, Office of Nuclear Reactor Regulation (NRR) Shawn Harwell, NRR Kosmas Lois, NRR John Lamb, NRR Balwant Singal, NRR Licensee Attendees Philippe Soenen, Pacific gas and Electric Company (PG&E) Brian Ketelsen, PG&E Jennifer Post, PG&E Brandy Lopez, PG&E* Eric Nelson, PG&E* Members of the Public Carlyn Greene, Spend Fuel Uranium Exchange Company* David Weisman, Alliance for Nuclear Responsibility*

Bruce Lacy, Lacy Consulting Group* *Participated via phone Enclosure

SUBJECT:

SUMMARY

OF NOVEMBER 29, 2018, PUBLIC MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY TO DISCUSS THE PROPOSED EXEMPTION REQUEST TO WITHDRAW FUNDS FROM THE NUCLEAR DECOMMISSIONING TRUSTS TO FUND DECOMMISSIONING PLANNING ACTIVITIES AT DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2 (EPID L-2018-LRM-0074)

DATED DECEMBER 31, 2018 DISTRIBUTION:

PUBLIC RidsACRS_MailCTR Resource RidsNrrDorl Resource RidsNrrDorllpl4 Resource RidsNrrLAPBlechman Resource RidsNrrPMDiabloCanyon Resource RidsRgn4MailCenter Resource ABowers, NRR Jlamb, NRR Jlarsen, RIV SHarwell, NRR Kleis, NRR JHickman, NMSS GJohnston, NRR CCook, OEDO RIV LBurkhart, OEDO NRR ADAMS A ccess,on N os.: M f N ' ML18311A187 S ee mg ot,ce: ' ummarv: ML18348A420 * . *1 via e-ma1 OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DLP/PFPB/BC NAME BSingal PBlechman ABowers DATE 12/18/18 12/18/18 12/13/18 OFFICE N RR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME RPascarelli BSingal DATE 12/28/18 12/31/18 OFFICIAL RECORD COPY