Category:Letter type:L
MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-069, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-05-31031 May 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2023-072, Preparation and Scheduling of Operator Licensing Examinations2023-05-22022 May 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-061, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 2022 Annual Radiological Environmental Operating Report L-2023-062, Cycle 33 Core Operating Limits Report2023-04-27027 April 2023 Cycle 33 Core Operating Limits Report L-2023-060, Radiological Emergency Plan, Revision 752023-04-26026 April 2023 Radiological Emergency Plan, Revision 75 L-2023-054, Submittal of Periodic Reports2023-04-12012 April 2023 Submittal of Periodic Reports L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report2023-03-30030 March 2023 Correction to U4R33 Steam Generator Tube Inspection Report L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-040, Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application2023-03-0303 March 2023 Response to Requests for Additional Information (Rals) and Requests for Confirmation of Information (Rc Ls) Following Regulatory Audit of Subsequent License Renewal Application L-2023-037, Annual Radioactive Effluent Release Report2023-03-0101 March 2023 Annual Radioactive Effluent Release Report L-2023-017, Radiological Emergency Plan Revision 73 and Revision 7 42023-02-17017 February 2023 Radiological Emergency Plan Revision 73 and Revision 7 4 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-181, Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 52022-12-0101 December 2022 Response to Request for Additional Information Regarding License Amendment Request for the Technical Specifications Conversion to NUREG-1431, Revision 5 L-2022-182, Emergency Response Data System (Eros) Changes2022-11-17017 November 2022 Emergency Response Data System (Eros) Changes L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2022-171, 10 CFR 50.59(d)(2) Summary Report2022-10-20020 October 2022 10 CFR 50.59(d)(2) Summary Report L-2022-167, Submittal of Periodic Reports2022-10-13013 October 2022 Submittal of Periodic Reports L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication2022-09-16016 September 2022 Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-08-19019 August 2022 Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 L-2022-136, Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report2022-08-12012 August 2022 Response to Request for Additional Information Regarding Turkey Point Unit 3 Cycle 32 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-076, Subsequent License Renewal Application - Appendix E Environmental Report Supplement 22022-06-0909 June 2022 Subsequent License Renewal Application - Appendix E Environmental Report Supplement 2 2024-01-25
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. ML23095A0072023-04-0404 April 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1431 Revision 5 L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary)2022-08-26026 August 2022 License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) ML22243A1622022-08-26026 August 2022 Submittal of License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML21265A3722021-09-23023 September 2021 Improved Technical Specifications Conversion, Volume 1, Revision 0, Application of Selection Criteria to the Turkey Point Nuclear Generating Station Unit 3 and Unit 4 Technical Specifications L-2021-158, Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal2021-09-22022 September 2021 Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (Its) Submittal ML21265A3772021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 6, Revision 0, Section 3.1, Reactivity Control Systems ML21265A3852021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 14, Revision 0, Section 3.9, Refueling Operations ML21265A3812021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.5, Emergency Core Cooling Systems (ECCS) ML21265A3872021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 16, Revision 0, Section 5.0, Administrative Controls ML21265A3792021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 8, Revision 0, Section 3.3, Instrumentation ML21265A3802021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 9, Revision 0, Section 3.4, Reactor Coolant Systems (RCS) ML21265A3842021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems ML21265A3862021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 15, Revision 0, Section 4.0, Design Features ML21265A3782021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 7, Revision 0, Section 3.2, Power Distribution Limits ML21265A3832021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 12, Revision 0, Section 3.7, Plant Systems ML21265A3752021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 4, Revision 0, Chapter 2.0, Safety Limits (Sls) ML21265A3762021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 5, Revision 0, Section 3.0, LCO and SR Applicability ML21265A3732021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 2, Revision 0, Determination of No Significant Hazards Considerations Generic Changes ML21265A3822021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 11, Revision 0, Section 3.6, Containment Systems ML21265A3742021-09-22022 September 2021 Improved Technical Specifications Conversion, Volume 3, Revision 0, Chapter 1.0, Use and Application L-2021-071, License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum Tm LOCA Methodology2021-04-15015 April 2021 License Amendment Request 273, Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum Tm LOCA Methodology L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors2020-11-0505 November 2020 Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors L-2020-053, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program2020-04-0404 April 2020 Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program L-2020-003, License Amendment Request 268, Request to Extend Containment Leakage Rate Test Frequency2020-01-27027 January 2020 License Amendment Request 268, Request to Extend Containment Leakage Rate Test Frequency L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.2019-12-0606 December 2019 License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. L-2019-192, License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements2019-11-0404 November 2019 License Amendment Request 270, Modify Containment Atmosphere Radioactivity Monitoring, Containment Ventilation Isolation and RCS Leakage Detection System Requirements L-2019-005, License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications2019-02-14014 February 2019 License Amendment Request 266, Clarify Requirements When One Unit Is Outside the Applicability of Certain Technical Specifications L-2018-219, Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-12-0303 December 2018 Supplement to License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals L-2018-203, Supplement to License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement2018-11-20020 November 2018 Supplement to License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses2018-10-17017 October 2018 Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals2018-10-17017 October 2018 License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items2018-10-17017 October 2018 Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items L-2018-177, Subsequent License Renewal Application Safety Review Requests for Confirmation of Information (Rci) Responses2018-10-0909 October 2018 Subsequent License Renewal Application Safety Review Requests for Confirmation of Information (Rci) Responses L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation2018-10-0505 October 2018 Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation ML18130A4662018-06-12012 June 2018 Amendments Regarding Technical Specifications Pertaining to IST Program and ISI Program Requirements and Surveillance Frequency Control Program Applicability L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-044, License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement2018-05-14014 May 2018 License Amendment Request 257, Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement L-2018-065, License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA, Revision 12018-05-0303 May 2018 License Amendment Request 258, Revise Reactor Core Safety Limit to Reflect WCAP-17642-PA, Revision 1 L-2018-082, Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version)2018-04-10010 April 2018 Turkey Point, Units 3 and 4 - Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) L-2018-082, Enclosure 4 to L-2018-082 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Documents (Public Version)2018-04-10010 April 2018 Enclosure 4 to L-2018-082 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Documents (Public Version) ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) ML18113A1412018-04-10010 April 2018 Enclosure 1 to L-2018-082, Subsequent License Renewal Application, Enclosure Summary ML18113A1342018-04-10010 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 L-2018-086, Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information2018-04-10010 April 2018 Subsequent License Renewal Application Appendix E Environmental Report Supplemental Information 2023-06-28
[Table view] Category:Technical Specification
MONTHYEARL-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications ML18257A0312018-10-0505 October 2018 Correction to Amendment Nos. 279 and 274 Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID l-2017-LLA-0213) L-2018-100, Submittal of 10 CFR 50.59(d)(2) Summary Report2018-04-25025 April 2018 Submittal of 10 CFR 50.59(d)(2) Summary Report L-2017-100, License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ...2017-06-28028 June 2017 License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... L-2017-006, Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b.2017-02-0909 February 2017 Supplement to License Amendment Request 236, Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b. L-2016-128, License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps2016-06-30030 June 2016 License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps2016-06-30030 June 2016 Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps L-2014-369, License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B.2014-12-23023 December 2014 License Amendment Request No. 236 Revision to the Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B. L-2014-028, LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2014-07-0808 July 2014 LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-2014-033, License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2014-04-0909 April 2014 License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-2013-219, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d2013-07-12012 July 2013 License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement2012-09-0606 September 2012 License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement ML11293A3682012-06-15015 June 2012 Technical Specification Pages - Issuance of Amendments Regarding Extended Power Uprate L-2011-498, Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases2011-11-16016 November 2011 Units, 3 & 4 - 10 CFR 50.59 Summary Report of Changes, Tests and Experiments for Period Covering 12/04/2009 Through 05/16/2011 and Updated Technical Specification Bases L-2011-276, Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System2011-08-0101 August 2011 Supplemental Response Regarding License Amendment Request No. 194, Control Room Habitability TSTF-448, and Changes to Technical Specification 3.7.5, Control Room Emergency Ventilation System ML11195A1472011-07-29029 July 2011 Issuance of Amendments Regarding Cyber Security Program L-2011-264, Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope Habitability2011-07-18018 July 2011 Response to NRC Request for Additional Information on License Amendment Request (LAR-194) Re Control Room Envelope Habitability L-2010-115, 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 20092010-06-0404 June 2010 10 CFR 50.59 Summary Report Changes, Tests, and Experiments Implemented as Allowed by 10 CFR 50.59 for the Period Covering May 11, 2008 Through December 4, 2009 L-2009-177, Supplement to License Amendment Request 196 - Summary of Sump Ph Calculation Inputs, Assumptions, Methodology, and Results2009-07-30030 July 2009 Supplement to License Amendment Request 196 - Summary of Sump Ph Calculation Inputs, Assumptions, Methodology, and Results L-2009-093, Emergency License Amendment Request No. 197, Revision of Technical Specification 3.9.10: Water Level - Reactor Vessel2009-04-15015 April 2009 Emergency License Amendment Request No. 197, Revision of Technical Specification 3.9.10: Water Level - Reactor Vessel L-2009-033, Submittal of License Amendment Request No. 195, Application to Delete Technical Specification 3/4.4.10, & to Implement a Technical Specification Improvement to Extend Inspection Interval for Reactor Coolant Pump Flywheels.2009-02-16016 February 2009 Submittal of License Amendment Request No. 195, Application to Delete Technical Specification 3/4.4.10, & to Implement a Technical Specification Improvement to Extend Inspection Interval for Reactor Coolant Pump Flywheels. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-175, Rod Position Indication Systems2007-11-12012 November 2007 Rod Position Indication Systems L-2007-131, Administrative Changes to Technical Specifications to Remove Notes Regarding the Inoperability of Rod Position Indication for Control Rods F-8 (Unit 4) and M-6 (Unit 3)2007-09-0505 September 2007 Administrative Changes to Technical Specifications to Remove Notes Regarding the Inoperability of Rod Position Indication for Control Rods F-8 (Unit 4) and M-6 (Unit 3) L-2007-083, License Amendment Request (LAR 192) Inoperable Rod Position Indication2007-05-17017 May 2007 License Amendment Request (LAR 192) Inoperable Rod Position Indication L-2006-074, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-04-27027 April 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity L-2005-243, 10 CFR 50.59 Report2005-12-0808 December 2005 10 CFR 50.59 Report L-2005-006, Proposed License Amendment Reactor Trip System Technical Specifications Changes2005-03-22022 March 2005 Proposed License Amendment Reactor Trip System Technical Specifications Changes L-2005-008, Proposed License Amendment Adoption of Improved Standard Technical Specification (ISTS) Travelers2005-01-20020 January 2005 Proposed License Amendment Adoption of Improved Standard Technical Specification (ISTS) Travelers ML0412503672004-04-23023 April 2004 Proposed License Amendments Accident Monitoring Instrumentation Technical Specification 3.3.3.3 L-77-174, 06/09/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Revised 05/03/1976 Proposal on Subject of Air Filtration Systems1977-06-0909 June 1977 06/09/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Revised 05/03/1976 Proposal on Subject of Air Filtration Systems L-77-130, 04/28/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs1977-04-28028 April 1977 04/28/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs L-77-106, 04/04/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty1977-04-0404 April 1977 04/04/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty ML18227C7331976-11-0101 November 1976 Referring to Letter of 5/20/1976 Which Proposed Tech Spec Changes Relating to Containment Building Tendon Surveillance Program, Letter Advising Changes Are Not Acceptable L-76-199, Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Changes in Response to 04/14/1975 Letter from George Lear Which Requested That Heatup & Cooldown Rates in Technical Specifications ...1976-05-21021 May 1976 Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Changes in Response to 04/14/1975 Letter from George Lear Which Requested That Heatup & Cooldown Rates in Technical Specifications ... L-76-200, 05/20/1976 Letter Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Technical Specification Changes Relating to Surveillance of Containment Building Tendons1976-05-20020 May 1976 05/20/1976 Letter Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Technical Specification Changes Relating to Surveillance of Containment Building Tendons L-76-189, 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters,1976-05-13013 May 1976 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters, L-76-192, 05/03/1976 Letter Request to Amend Appendix a of Facility Operating Licenses. Revises Technical Specifications to Conform as Near as Possible to Standard Technical Specifications Without Making Any Hardware Changes1976-05-0303 May 1976 05/03/1976 Letter Request to Amend Appendix a of Facility Operating Licenses. Revises Technical Specifications to Conform as Near as Possible to Standard Technical Specifications Without Making Any Hardware Changes ML18227D8631976-02-25025 February 1976 02/25/1976 Letter Request to Amend Appendix a of Facility Operating License. Proposes Technical Specification Changes Relating to Control Rod Insertion Limits for Unit 4, Cycle 3 ML18227D6721975-01-30030 January 1975 Letter Submits Proposed Amendment to Facility Operating License to Amend Appendix a, Proposing Addition of Limiting Conditions for Operation & Surveillance Requirements 2023-10-11
[Table view] Category:Amendment
MONTHYEARL-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications ML18257A0312018-10-0505 October 2018 Correction to Amendment Nos. 279 and 274 Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID l-2017-LLA-0213) L-2017-100, License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ...2017-06-28028 June 2017 License Amendment Request (LAR) 248, Changes to Technical Specifications Regarding Inservice Testing Program and Inservice Inspection Program Requirements and Surveillance Frequency Control Program ... L-2016-128, License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps2016-06-30030 June 2016 License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps L-2016-128, Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps2016-06-30030 June 2016 Turkey Point Nuclear Plant, Units 3 and 4 - License Amendment Request 245, Change to the Technical Specifications to Address an Inoperable Steam Supply for the Auxiliary Feedwater Pumps L-2014-028, LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2014-07-0808 July 2014 LAR-230, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-2014-033, License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2014-04-0909 April 2014 License Amendment Request LAR-229, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-2013-219, License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d2013-07-12012 July 2013 License Amendment Request No. 225 Regarding One-Time Extension for Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d ML11293A3682012-06-15015 June 2012 Technical Specification Pages - Issuance of Amendments Regarding Extended Power Uprate ML11195A1472011-07-29029 July 2011 Issuance of Amendments Regarding Cyber Security Program L-2009-177, Supplement to License Amendment Request 196 - Summary of Sump Ph Calculation Inputs, Assumptions, Methodology, and Results2009-07-30030 July 2009 Supplement to License Amendment Request 196 - Summary of Sump Ph Calculation Inputs, Assumptions, Methodology, and Results L-2009-093, Emergency License Amendment Request No. 197, Revision of Technical Specification 3.9.10: Water Level - Reactor Vessel2009-04-15015 April 2009 Emergency License Amendment Request No. 197, Revision of Technical Specification 3.9.10: Water Level - Reactor Vessel L-2009-033, Submittal of License Amendment Request No. 195, Application to Delete Technical Specification 3/4.4.10, & to Implement a Technical Specification Improvement to Extend Inspection Interval for Reactor Coolant Pump Flywheels.2009-02-16016 February 2009 Submittal of License Amendment Request No. 195, Application to Delete Technical Specification 3/4.4.10, & to Implement a Technical Specification Improvement to Extend Inspection Interval for Reactor Coolant Pump Flywheels. L-2007-175, Rod Position Indication Systems2007-11-12012 November 2007 Rod Position Indication Systems L-2007-131, Administrative Changes to Technical Specifications to Remove Notes Regarding the Inoperability of Rod Position Indication for Control Rods F-8 (Unit 4) and M-6 (Unit 3)2007-09-0505 September 2007 Administrative Changes to Technical Specifications to Remove Notes Regarding the Inoperability of Rod Position Indication for Control Rods F-8 (Unit 4) and M-6 (Unit 3) L-2007-083, License Amendment Request (LAR 192) Inoperable Rod Position Indication2007-05-17017 May 2007 License Amendment Request (LAR 192) Inoperable Rod Position Indication L-2006-074, Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity2006-04-27027 April 2006 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity L-2005-006, Proposed License Amendment Reactor Trip System Technical Specifications Changes2005-03-22022 March 2005 Proposed License Amendment Reactor Trip System Technical Specifications Changes L-2005-008, Proposed License Amendment Adoption of Improved Standard Technical Specification (ISTS) Travelers2005-01-20020 January 2005 Proposed License Amendment Adoption of Improved Standard Technical Specification (ISTS) Travelers ML0412503672004-04-23023 April 2004 Proposed License Amendments Accident Monitoring Instrumentation Technical Specification 3.3.3.3 L-77-174, 06/09/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Revised 05/03/1976 Proposal on Subject of Air Filtration Systems1977-06-0909 June 1977 06/09/1977 Letter Request to Amend Appendix a of Facility Operating Licenses. Revised 05/03/1976 Proposal on Subject of Air Filtration Systems L-77-130, 04/28/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs1977-04-28028 April 1977 04/28/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Proposed Valve Test, Pump Test, and Inservice Inspection Programs L-77-106, 04/04/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty1977-04-0404 April 1977 04/04/1977 Letter Proposed Amendment to Facility Operating Licenses DPR-31 & DPR-41 Options Available for Offsetting an Increased Rod Bow Penalty ML18227C7331976-11-0101 November 1976 Referring to Letter of 5/20/1976 Which Proposed Tech Spec Changes Relating to Containment Building Tendon Surveillance Program, Letter Advising Changes Are Not Acceptable L-76-199, Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Changes in Response to 04/14/1975 Letter from George Lear Which Requested That Heatup & Cooldown Rates in Technical Specifications ...1976-05-21021 May 1976 Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Changes in Response to 04/14/1975 Letter from George Lear Which Requested That Heatup & Cooldown Rates in Technical Specifications ... L-76-200, 05/20/1976 Letter Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Technical Specification Changes Relating to Surveillance of Containment Building Tendons1976-05-20020 May 1976 05/20/1976 Letter Request to Amend Appendix a of Facility Operating Licenses DPR-31 & DPR-41. Proposes Technical Specification Changes Relating to Surveillance of Containment Building Tendons L-76-189, 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters,1976-05-13013 May 1976 05/13/1976 Letter Request to Amend Appendix a of Facility Operating License. Amendment Adds New Specification 3.1.6 on Unit 4 DNB Parameters & New Bases Section to Describe One of New DNB Parameters, L-76-192, 05/03/1976 Letter Request to Amend Appendix a of Facility Operating Licenses. Revises Technical Specifications to Conform as Near as Possible to Standard Technical Specifications Without Making Any Hardware Changes1976-05-0303 May 1976 05/03/1976 Letter Request to Amend Appendix a of Facility Operating Licenses. Revises Technical Specifications to Conform as Near as Possible to Standard Technical Specifications Without Making Any Hardware Changes ML18227D8631976-02-25025 February 1976 02/25/1976 Letter Request to Amend Appendix a of Facility Operating License. Proposes Technical Specification Changes Relating to Control Rod Insertion Limits for Unit 4, Cycle 3 ML18227D6721975-01-30030 January 1975 Letter Submits Proposed Amendment to Facility Operating License to Amend Appendix a, Proposing Addition of Limiting Conditions for Operation & Surveillance Requirements 2019-03-26
[Table view] |