ML13106A210
| ML13106A210 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 04/15/2013 |
| From: | Farideh Saba Division of Operating Reactor Licensing |
| To: | Tomonto B Florida Power & Light Co |
| References | |
| TAC MF1041 | |
| Download: ML13106A210 (2) | |
Text
1 NRR-PMDAPEm Resource From:
Saba, Farideh Sent:
Monday, April 15, 2013 2:46 PM To:
Tomonto, Bob; Hanek, Olga Cc:
Rodriguez, Rafael
Subject:
Acceptance review for MF1041 TURKEY POINT 3 - LAR 225 regarding One-time Extension for TS SR 4.5.1.1.d - Accumulator Check Valve Operability Testing Importance:
High
- Bob, By letter dated March 15, 2013, Florida Power and Light Company (the licensee) submitted for a license amendment request to the Renewed Facility Operating Licenses (RFOL) for Turkey Point Unit 3. The licensee requested that RFOL DPR-31 for Turkey Point Unit 3 be amended to add a license condition for a one-time (temporary) extension for TS Surveillance Requirement 4.5.1.1.d involving an operability demonstration of the Emergency Core Cooling System accumulator check valves in order to account for effects of rescheduling the Unit 3 Cycle 27 refueling outage from January 2014 to March 2014. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1447 or via email by farideh.saba@nrc.gov.
Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
Hearing Identifier:
NRR_PMDA Email Number:
666 Mail Envelope Properties (Farideh.Saba@nrc.gov20130415144500)
Subject:
Acceptance review for MF1041 TURKEY POINT 3 - LAR 225 regarding One-time Extension for TS SR 4.5.1.1.d - Accumulator Check Valve Operability Testing Sent Date:
4/15/2013 2:45:45 PM Received Date:
4/15/2013 2:45:00 PM From:
Saba, Farideh Created By:
Farideh.Saba@nrc.gov Recipients:
"Rodriguez, Rafael" <Rafael.Rodriguez@nrc.gov>
Tracking Status: None "Tomonto, Bob" <Bob.Tomonto@fpl.com>
Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2064 4/15/2013 2:45:00 PM Options Priority:
High Return Notification:
No Reply Requested:
Yes Sensitivity:
Normal Expiration Date:
Recipients Received: